|
Volumn , Issue , 2008, Pages 3-18
|
Overview of Shanghai Yangtze River Tunnel Project
|
Author keywords
[No Author keywords available]
|
Indexed keywords
BORED TUNNELS;
BRIDGE PROJECTS;
CONSTRUCTION METHOD;
CONSTRUCTION SURVEY;
FIRE FIGHTING;
FRONT SURFACES;
INTERNAL STRUCTURE;
LARGE DIAMETER;
NATURAL CONDITIONS;
OVERALL DESIGN;
TECHNICAL SOLUTIONS;
TUNNEL CONSTRUCTION;
TUNNEL PROJECTS;
TUNNEL VENTILATION SYSTEMS;
WATER PRESSURES;
YANGTZE RIVER;
BRIDGES;
EARTH BORING MACHINES;
VENTILATION;
TUNNELS;
|
EID: 84863714298
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: None Document Type: Conference Paper |
Times cited : (11)
|
References (6)
|