-
1
-
-
79955346524
-
A novel fuzzy and multiobjective evolutionary algorithm based gene assignment for clustering short time series expression data
-
DOI 10.1109/CEC.2007.4424485, 4424485, 2007 IEEE Congress on Evolutionary Computation, CEC 2007
-
Anand, A., Suganthan, P.N., and Deb, K., 2007. A novel fuzzy and multiobjective evolutionary algorithm based gene assignment for clustering short time series expression data. In: IEEE congress on evolutionary computation, CEC 2007, 25-28 September, Singapore, 297-304. (Pubitemid 351371413)
-
(2008)
2007 IEEE Congress on Evolutionary Computation, CEC 2007
, pp. 297-304
-
-
Anand, A.1
Suganthan, P.N.2
Deb, K.3
-
2
-
-
33847267256
-
A mixed integer programming model for advanced planning and scheduling (APS)
-
Chen, K. and Ji, P., 2007. A mixed integer programming model for advanced planning and scheduling (APS). European Journal of Operational Research, 181 (8), 515-522.
-
(2007)
European Journal of Operational Research
, vol.181
, Issue.8
, pp. 515-522
-
-
Chen, K.1
Ji, P.2
-
4
-
-
33645456731
-
A novel hidden Markov model-based hierarchical time-series clustering algorithm
-
Duan, J.J., et al., 2006. A novel hidden Markov model-based hierarchical time-series clustering algorithm. Journal of Computer Research and Development, 43 (1), 61-67.
-
(2006)
Journal of Computer Research and Development
, vol.43
, Issue.1
, pp. 61-67
-
-
Duan, J.J.1
-
5
-
-
40649129511
-
A combined cloud classification method of multi-spectral satellite cloud pictures based on GA and FCM
-
Hong, M., et al., 2005. A combined cloud classification method of multi-spectral satellite cloud pictures based on GA and FCM. Progress in Geophysics, 20 (4), 1009-1014.
-
(2005)
Progress in Geophysics
, vol.20
, Issue.4
, pp. 1009-1014
-
-
Hong, M.1
-
6
-
-
40649128121
-
Optimization methodology in production planning for semiconductor manufacturing
-
Li, Q., et al., 2004. Optimization methodology in production planning for semiconductor manufacturing. Manufacturing Technology and Machine Tool, 11, 93-96.
-
(2004)
Manufacturing Technology and Machine Tool
, vol.11
, pp. 93-96
-
-
Li, Q.1
-
7
-
-
34548526437
-
Application of interactive possibilistic linear programming to aggregate production planning with multiple imprecise objectives
-
Liang, T.F., 2007. Application of interactive possibilistic linear programming to aggregate production planning with multiple imprecise objectives. Production Planning and Control, 18 (7), 548-560.
-
(2007)
Production Planning and Control
, vol.18
, Issue.7
, pp. 548-560
-
-
Liang, T.F.1
-
8
-
-
24044470614
-
Clustering of time series data-A survey
-
Liao, T.W., 2005. Clustering of time series data-a survey. Pattern Recognition, 38 (11), 1857-1874.
-
(2005)
Pattern Recognition
, vol.38
, Issue.11
, pp. 1857-1874
-
-
Liao, T.W.1
-
10
-
-
15344348728
-
Clustering of unevenly sampled gene expression time-series data
-
DOI 10.1016/j.fss.2004.10.014, PII S0165011404004579, Fuzzy Sets and Systems
-
Mö ller-Levet, C.S., et al., 2005. Clustering of unevenly sampled gene expression time-series data. Fuzzy Sets and Systems, 152 (1), 49-66. (Pubitemid 40391251)
-
(2005)
Fuzzy Sets and Systems
, vol.152
, Issue.1
, pp. 49-66
-
-
Moller-Levet, C.S.1
Klawonn, F.2
Cho, K.-H.3
Yin, H.4
Wolkenhauer, O.5
-
11
-
-
27744527963
-
Nonparametric estimation of the coefficient of overlapping - Theory and empirical application
-
DOI 10.1016/j.csda.2005.01.014, PII S0167947305000290
-
Schmid, F. and Schmidt, A., 2006. Nonparametric estimation of the coefficient of overlapping-theory and empirical application. Computational Statistics and Data Analysis, 50 (6), 1583-1596. (Pubitemid 41617918)
-
(2006)
Computational Statistics and Data Analysis
, vol.50
, Issue.6
, pp. 1583-1596
-
-
Schmid, F.1
Schmidt, A.2
-
12
-
-
0142186077
-
Multi-site aggregate production planning with multiple objectives: A goal programming approach
-
Stephen, C.H., et al., 2003. Multi-site aggregate production planning with multiple objectives: a goal programming approach. Production Planning and Control, 14 (5), 425-436.
-
(2003)
Production Planning and Control
, vol.14
, Issue.5
, pp. 425-436
-
-
Stephen, C.H.1
-
13
-
-
0035899769
-
Aggregate production planning with multiple objectives in fuzzy environment
-
Wang, R.C. and Fang, H.H., 2001. Aggregate production planning with multiple objectives in fuzzy environment. European Journal of Operational Research, 133 (3), 521-536.
-
(2001)
European Journal of Operational Research
, vol.133
, Issue.3
, pp. 521-536
-
-
Wang, R.C.1
Fang, H.H.2
-
14
-
-
1442334789
-
Application of fuzzy multi-objective linear programming to aggregate production planning
-
Wang, R.C. and Liang, T.F., 2004. Application of fuzzy multi-objective linear programming to aggregate production planning. Computers and Industrial Engineering, 46 (1), 17-41.
-
(2004)
Computers and Industrial Engineering
, vol.46
, Issue.1
, pp. 17-41
-
-
Wang, R.C.1
Liang, T.F.2
-
16
-
-
33947502009
-
Modeling method of fuzzy inference system based on improved fuzzy clustering arithmetic
-
Zhu, X.L., Wu, X.X., and Li, X.M., 2007. Modeling method of fuzzy inference system based on improved fuzzy clustering arithmetic. Control and Decision, 22 (1), 73-77.
-
(2007)
Control and Decision
, vol.22
, Issue.1
, pp. 73-77
-
-
Zhu, X.L.1
Wu, X.X.2
Li, X.M.3
|