메뉴 건너뛰기




Volumn 29, Issue 2, 2012, Pages 217-232

Behavior analysis of synthesis unit in fertilizer plant

Author keywords

Availability; India; Maintainability; Maintenance reliability; Petri net; Reliability; Reliability management; Urea industry

Indexed keywords


EID: 84863410668     PISSN: 0265671X     EISSN: None     Source Type: Journal    
DOI: 10.1108/02656711211199928     Document Type: Article
Times cited : (54)

References (36)
  • 1
    • 0036604346 scopus 로고    scopus 로고
    • Analysis of sequential failure for assessment of reliability and safety of manufacturing systems
    • Adamyan, A. and David, H. (2002), "Analysis of sequential failure for assessment of reliability and safety of manufacturing systems" in Reliability Engineering & System Safety, Vol. 76, No. 3, pp. 227-36.
    • (2002) Reliability Engineering & System Safety , vol.76 , Issue.3 , pp. 227-236
    • Adamyan, A.1    David, H.2
  • 3
    • 51749099202 scopus 로고    scopus 로고
    • System analysis and maintenance management for the coal handling system in a paper plant
    • Arora, N. and Kumar, D. (2000), "System analysis and maintenance management for the coal handling system in a paper plant" in International Journal of Management and Systems, Vol. 16, No. 2, pp. 137-56.
    • (2000) International Journal of Management and Systems , vol.16 , Issue.2 , pp. 137-156
    • Arora, N.1    Kumar, D.2
  • 4
    • 55749096731 scopus 로고    scopus 로고
    • Multi-objective reliability optimization for dissimilar-unit cold-standby systems using a genetic algorithm
    • Azaron, A., Perkgoz, C., Katagiri, H., Kato, K. and Sakawa, M. (2009), "Multi-objective reliability optimization for dissimilar-unit cold-standby systems using a genetic algorithm" in Computers & Operations Research, Vol. 36, No. 5, pp. 1562-71.
    • (2009) Computers & Operations Research , vol.36 , Issue.5 , pp. 1562-1571
    • Azaron, A.1    Perkgoz, C.2    Katagiri, H.3    Kato, K.4    Sakawa, M.5
  • 5
    • 0001435175 scopus 로고
    • Fuzzy reliability theories
    • Cai, K.Y. (1991), "Fuzzy reliability theories" in Fuzzy Sets and Systems, Vol. 40, pp. 510-11.
    • (1991) Fuzzy Sets and Systems , vol.40 , pp. 510-511
    • Cai, K.Y.1
  • 6
    • 0000042191 scopus 로고    scopus 로고
    • System failure engineering and fuzzy methodology: An introductory overview
    • Cai, K.Y. (1996), "System failure engineering and fuzzy methodology: an introductory overview" in Fuzzy Sets and Systems, Vol. 83, pp. 113-33.
    • (1996) Fuzzy Sets and Systems , vol.83 , pp. 113-133
    • Cai, K.Y.1
  • 8
    • 18844438889 scopus 로고    scopus 로고
    • Numerical analysis of reliability and availability of the serial processes in butter-oil processing plant
    • Gupta, P., Lal, A.K., Sharma, R.K. and Singh, J. (2005), "Numerical analysis of reliability and availability of the serial processes in butter-oil processing plant" in International Journal of Quality & Reliability Management, Vol. 22, No. 3, pp. 303-16.
    • (2005) International Journal of Quality & Reliability Management , vol.22 , Issue.3 , pp. 303-316
    • Gupta, P.1    Lal, A.K.2    Sharma, R.K.3    Singh, J.4
  • 9
    • 33947264629 scopus 로고    scopus 로고
    • Analysis of reliability and availability of serial processes of plastic-pipe manufacturing plant: A case study
    • Gupta, P., Lal, A.K., Sharma, R.K. and Singh, J. (2007), "Analysis of reliability and availability of serial processes of plastic-pipe manufacturing plant: a case study" in International Journal of Quality & Reliability Management, Vol. 24, No. 4, pp. 404-19.
    • (2007) International Journal of Quality & Reliability Management , vol.24 , Issue.4 , pp. 404-419
    • Gupta, P.1    Lal, A.K.2    Sharma, R.K.3    Singh, J.4
  • 10
    • 33646264071 scopus 로고    scopus 로고
    • Bayesian reliability analysis for fuzzy lifetime data
    • Huang, H.Z., Zuo, M.J. and Sun, Z.Q. (2006), "Bayesian reliability analysis for fuzzy lifetime data" in Fuzzy Sets and Systems, Vol. 157, No. 12, pp. 1674-86.
    • (2006) Fuzzy Sets and Systems , vol.157 , Issue.12 , pp. 1674-1686
    • Huang, H.Z.1    Zuo, M.J.2    Sun, Z.Q.3
  • 11
    • 41449086139 scopus 로고    scopus 로고
    • A new methodology for risk-based availability analysis
    • Khan, F.I., Haddara, M. and Krishnasamy, L. (2008), "A new methodology for risk-based availability analysis" in IEEE Transactions on Reliability, Vol. 57, No. 1, pp. 103-12.
    • (2008) IEEE Transactions on Reliability , vol.57 , Issue.1 , pp. 103-112
    • Khan, F.I.1    Haddara, M.2    Krishnasamy, L.3
  • 12
    • 0035399545 scopus 로고    scopus 로고
    • Reliability modeling of repairable systems using Petri nets and fuzzy Lambda-Tau methodology
    • Knezevic, J. and Odoom, E.R. (2001), "Reliability modeling of repairable systems using Petri nets and fuzzy Lambda-Tau methodology" in Reliability Engineering & System Safety, Vol. 73, No. 1, pp. 1-17.
    • (2001) Reliability Engineering & System Safety , vol.73 , Issue.1 , pp. 1-17
    • Knezevic, J.1    Odoom, E.R.2
  • 13
    • 84863409605 scopus 로고    scopus 로고
    • RAM analysis of the press unit in a paper plant using genetic algorithm and Lambda-Tau methodology
    • Springer Book Series, Heidelberg
    • Komal, Sharma, S.P., Kumar, D. (2009), "RAM analysis of the press unit in a paper plant using genetic algorithm and Lambda-Tau methodology" in Proceedings of 13th Online International Conference WSC-2008; Applications of Soft Computing, Vol. 58, Springer, Heidelberg, pp. 127-37, Springer Book Series.
    • (2009) Proceedings of 13th Online International Conference WSC-2008; Applications of Soft Computing , vol.58 , pp. 127-137
    • Komal, S.S.P.1    Kumar, D.2
  • 14
    • 79960789415 scopus 로고    scopus 로고
    • Reliability analysis of Industrial system using GA and fuzzy approach
    • PhD thesis, Indian Institute of Technology Roorkee
    • Kumar, A. (2009), "Reliability analysis of Industrial system using GA and fuzzy approach", Indian Institute of Technology Roorkee, Roorkee, PhD thesis.
    • (2009)
    • Kumar, A.1
  • 15
    • 0027667990 scopus 로고
    • Maintenance planning and resource allocation in urea fertilizer plant
    • Kumar, D. and Pandey, P.C. (1993), "Maintenance planning and resource allocation in urea fertilizer plant" in Quality & Reliability Engineering International, Vol. 9, pp. 411-23.
    • (1993) Quality & Reliability Engineering International , vol.9 , pp. 411-423
    • Kumar, D.1    Pandey, P.C.2
  • 16
    • 0025889889 scopus 로고
    • Process design for a crystallization system in the urea fertilizer industry
    • Kumar, D., Pandey, P.C. and Singh, J. (1991a), "Process design for a crystallization system in the urea fertilizer industry" in Microelectronics Reliability, Vol. 31, pp. 855-9.
    • (1991) Microelectronics Reliability , vol.31 , pp. 855-859
    • Kumar, D.1    Pandey, P.C.2    Singh, J.3
  • 17
    • 0023826145 scopus 로고
    • Reliability analysis of feeding system in the paper industry
    • Kumar, D., Singh, I.P. and Singh, J. (1988), "Reliability analysis of feeding system in the paper industry" in Microelectronics Reliability, Vol. 28, pp. 213-15.
    • (1988) Microelectronics Reliability , vol.28 , pp. 213-215
    • Kumar, D.1    Singh, I.P.2    Singh, J.3
  • 18
    • 0026028390 scopus 로고
    • Behavioural analysis of a paper production system with different repair policies
    • Kumar, D., Singh, J. and Pandey, P.C. (1991b), "Behavioural analysis of a paper production system with different repair policies" in Microelectronics Reliability, Vol. 31, No. 1, pp. 47-51.
    • (1991) Microelectronics Reliability , vol.31 , Issue.1 , pp. 47-51
    • Kumar, D.1    Singh, J.2    Pandey, P.C.3
  • 19
    • 0027607264 scopus 로고
    • Operational behaviour and profit function for a bleaching and screening system in the paper industry
    • Kumar, D., Singh, J. and Pandey, P.C. (1993), "Operational behaviour and profit function for a bleaching and screening system in the paper industry" in Microelectronics Reliability, Vol. 33, No. 8, pp. 1101-5.
    • (1993) Microelectronics Reliability , vol.33 , Issue.8 , pp. 1101-1105
    • Kumar, D.1    Singh, J.2    Pandey, P.C.3
  • 20
    • 0026904185 scopus 로고
    • Lesson learned from HAZOP reviews of FCCUs
    • McCluer, K. and Whittle, D.K. (1992), "Lesson learned from HAZOP reviews of FCCUs" in Hydrocarbon Processing, Vol. 140, pp. 23-9.
    • (1992) Hydrocarbon Processing , vol.140 , pp. 23-29
    • McCluer, K.1    Whittle, D.K.2
  • 21
    • 0028424412 scopus 로고
    • Why triangular membership functions?
    • Pedrycz, W. (1994), "Why triangular membership functions?" in Fuzzy Sets and Systems, Vol. 64, No. 1, pp. 21-30.
    • (1994) Fuzzy Sets and Systems , vol.64 , Issue.1 , pp. 21-30
    • Pedrycz, W.1
  • 22
    • 0024281801 scopus 로고
    • Preliminary hazard analysis conducted on FCCU complex
    • Rooney, J. and Turner, J.H. (1988), "Preliminary hazard analysis conducted on FCCU complex" in Oil & Gas Journal, Vol. 8, pp. 60-6.
    • (1988) Oil & Gas Journal , vol.8 , pp. 60-66
    • Rooney, J.1    Turner, J.H.2
  • 24
    • 77954448100 scopus 로고    scopus 로고
    • Availability modeling of screening system of a paper plant using GSP
    • Sachdeva, A., Kumar, D. and Kumar, P. (2008a), "Availability modeling of screening system of a paper plant using GSP" in Journal of Modeling in Management, Vol. 3, No. 1, pp. 26-39.
    • (2008) Journal of Modeling in Management , vol.3 , Issue.1 , pp. 26-39
    • Sachdeva, A.1    Kumar, D.2    Kumar, P.3
  • 26
    • 0036563445 scopus 로고    scopus 로고
    • Structural reliability analysis through fuzzy number approach, with application to stability
    • Savoia, M. (2002), "Structural reliability analysis through fuzzy number approach, with application to stability" in Computers & Structures, Vol. 80, No. 12, pp. 1087-102.
    • (2002) Computers & Structures , vol.80 , Issue.12 , pp. 1087-1102
    • Savoia, M.1
  • 27
    • 34249697490 scopus 로고    scopus 로고
    • FM - a pragmatic tool to model, analyse and predict complex behaviour of industrial systems
    • Sharma, R.K., Kumar, D. and Kumar, P. (2007a), "FM - a pragmatic tool to model, analyse and predict complex behaviour of industrial systems" in International Journal for Computer-Aided Engineering and Software, Vol. 24, No. 4, pp. 319-46.
    • (2007) International Journal for Computer-Aided Engineering and Software , vol.24 , Issue.4 , pp. 319-346
    • Sharma, R.K.1    Kumar, D.2    Kumar, P.3
  • 28
    • 37248999456 scopus 로고    scopus 로고
    • Modeling system behavior for risk and reliability analysis using KBARM
    • Sharma, R.K., Kumar, D. and Kumar, P. (2007b), "Modeling system behavior for risk and reliability analysis using KBARM" in Quality & Reliability Engineering International, Vol. 23, No. 8, pp. 973-98.
    • (2007) Quality & Reliability Engineering International , vol.23 , Issue.8 , pp. 973-998
    • Sharma, R.K.1    Kumar, D.2    Kumar, P.3
  • 31
    • 59649111532 scopus 로고    scopus 로고
    • On reliability estimation based on fuzzy lifetime data
    • Viertl, R. (2009), "On reliability estimation based on fuzzy lifetime data" in Journal of Statistical Planning and Inference, Vol. 139, No. 5, pp. 1750-5.
    • (2009) Journal of Statistical Planning and Inference , vol.139 , Issue.5 , pp. 1750-1755
    • Viertl, R.1
  • 32
    • 2342624094 scopus 로고    scopus 로고
    • Fuzzy reliability estimation using Bayesian approach
    • Wu, H.C. (2004), "Fuzzy reliability estimation using Bayesian approach" in Computers & Industrial Engineering, Vol. 46, No. 3, pp. 467-93.
    • (2004) Computers & Industrial Engineering , vol.46 , Issue.3 , pp. 467-493
    • Wu, H.C.1
  • 33
    • 33644903840 scopus 로고    scopus 로고
    • Fuzzy Bayesian system reliability assessment based on exponential distribution
    • Wu, H.C. (2006), "Fuzzy Bayesian system reliability assessment based on exponential distribution" in Applied Mathematical Modelling, Vol. 30, No. 6, pp. 509-30.
    • (2006) Applied Mathematical Modelling , vol.30 , Issue.6 , pp. 509-530
    • Wu, H.C.1
  • 35
    • 33646519229 scopus 로고    scopus 로고
    • Assessment of the availability of an offshore installation by Monte Carlo simulation
    • Zio, E., Baraldi, P. and Patelli, E. (2006), "Assessment of the availability of an offshore installation by Monte Carlo simulation" in International Journal of Pressure Vessels and Piping, Vol. 83, No. 4, pp. 312-20.
    • (2006) International Journal of Pressure Vessels and Piping , vol.83 , Issue.4 , pp. 312-320
    • Zio, E.1    Baraldi, P.2    Patelli, E.3
  • 36
    • 67349195011 scopus 로고    scopus 로고
    • A fuzzy set-based approach for modeling dependence among human errors
    • Zio, E., Baraldi, P., Librizzi, M., Podofillini, L. and Dang, V.N. (2009), "A fuzzy set-based approach for modeling dependence among human errors" in Fuzzy Sets and Systems, Vol. 160, No. 13, pp. 1947-64.
    • (2009) Fuzzy Sets and Systems , vol.160 , Issue.13 , pp. 1947-1964
    • Zio, E.1    Baraldi, P.2    Librizzi, M.3    Podofillini, L.4    Dang, V.N.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.