메뉴 건너뛰기




Volumn , Issue , 2008, Pages 31-36

Devs modeling of run-time workflow simulation and its application

Author keywords

DEVS model; Parallel simulation; Run time workflow simulation; Time synchronization; Workflow Management

Indexed keywords

DEVS MODELS; PARALLEL SIMULATIONS; RUNTIMES; TIME SYNCHRONIZATION; WORKFLOW MANAGEMENTS;

EID: 84863293191     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (5)

References (19)
  • 1
    • 0034156532 scopus 로고    scopus 로고
    • Verification of workflow task structures: A petri-net-based approach
    • Aalst, W.M.P. and Hofstede, A.H.M., 2000, Verification of Workflow Task Structures: A Petri-Net-Based Approach, Information Systems, v.25, no.1, pp.43-69.
    • (2000) Information Systems , vol.25 , Issue.1 , pp. 43-69
    • Aalst, W.M.P.1    Hofstede, A.H.M.2
  • 3
    • 84863290310 scopus 로고    scopus 로고
    • BizFlow®, 2008, http://www.handysoft.com.
    • (2008) BizFlow®
  • 5
    • 84863283237 scopus 로고    scopus 로고
    • Architecture of A 3-layered Closed-loop BPMS harmony
    • in Korean
    • Choi, B.K. and Hwang, H.C., 2005, Architecture of A 3- layered Closed-loop BPMS Harmony®, KAIST VMS Lab Technical Report, http://vms.kaist.ac.kr/publications/TechnicalReport/3layer.pdf (in Korean).
    • (2005) KAIST VMS Lab Technical Report
    • Choi, B.K.1    Hwang, H.C.2
  • 6
    • 38049053028 scopus 로고    scopus 로고
    • Delphi, 2005, BPM 2005 Market Milestone Report, http://www.delphigroup. com/research/whitepaper-request-download.htm.
    • (2005) BPM 2005 Market Milestone Report
  • 7
    • 84863252662 scopus 로고    scopus 로고
    • Event-driven business process management
    • FileNet, Bruce Silver Associates
    • FileNet, Bruce Silver Associates, 2003, Event-driven Business Process Management. Industry Trend Reports, http://whitepapers.silicon.com.
    • (2003) Industry Trend Reports
  • 9
    • 77955629200 scopus 로고    scopus 로고
    • A simulation of a workflow management system
    • Greasley, A., 2003, A Simulation of A Workflow Management System, Work study, v.52, no.5, pp.256- 261.
    • (2003) Work Study , vol.52 , Issue.5 , pp. 256-261
    • Greasley, A.1
  • 12
    • 34547529439 scopus 로고    scopus 로고
    • Workflow-based dynamic scheduling of job shop operations
    • DOI 10.1080/09511920601024179, PII 780859451
    • Hwang, H.C. and Choi, B.K., 2007, Workflow-based Dynamic Scheduling of Job Shop Operations, International Journal of Computer Integrated Manufacturing, v.20, no.6, pp.557-566. (Pubitemid 47183743)
    • (2007) International Journal of Computer Integrated Manufacturing , vol.20 , Issue.6 , pp. 557-566
    • Hwang, H.C.1    Choi, B.K.2
  • 14
    • 77349100620 scopus 로고    scopus 로고
    • Business process simulation with HP process manager
    • Li, J.J., Casati, F. and Shan, M.C., 2002, Business Process Simulation with HP Process Manager, Simulation series, v.34, no.1, pp.291-295.
    • (2002) Simulation Series , vol.34 , Issue.1 , pp. 291-295
    • Li, J.J.1    Casati, F.2    Shan, M.C.3
  • 18
    • 0003945931 scopus 로고
    • WfMC-TC- 00-1003
    • Workflow Management Coalition (WfMC), WfMC-TC- 00-1003, 1995, The Workflow Reference Model, http://www.wfmc.org.
    • (1995) The Workflow Reference Model


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.