메뉴 건너뛰기




Volumn 2, Issue , 2011, Pages 508-511

Notice of Retraction: Optimal reactive power dispatch based on dynamic readjusting cost

Author keywords

control device; optimal reactive power dispatch; readjusting cost; zero interference cycle

Indexed keywords

REACTIVE POWER;

EID: 84863124985     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/PEAM.2011.6134986     Document Type: TB
Times cited : (5)

References (8)
  • 1
    • 0036872760 scopus 로고    scopus 로고
    • An extended nonlinear primal-dual interior-point algorithm for reactive-power optimization of large-scale power system with discrete control variable
    • LIU M B, TSO S K, CHENG Y. An Extended Nonlinear Primal-dual Interior-point Algorithm for Reactive-power Optimization of Large-scale Power System with Discrete Control Variable, IEEE Trans on Power Systems, 2002, 17(4): 982-991.
    • (2002) IEEE Trans on Power Systems , vol.17 , Issue.4 , pp. 982-991
    • Liu, M.B.1    Tso, S.K.2    Cheng, Y.3
  • 2
    • 0029305071 scopus 로고
    • Contingency constrained optimal reactive power flow procedures for voltage control in planning and operation
    • COVA B, LOSIGNORE N, MARANNINO P, Contingency Constrained Optimal Reactive Power Flow Procedures for Voltage Control in Planning and Operation. IEEE Trans on Power Systems, 1995, 10(2): 602-608.
    • (1995) IEEE Trans on Power Systems , vol.10 , Issue.2 , pp. 602-608
    • Cova, B.1    Losignore, N.2    Marannino, P.3
  • 3
    • 4043169173 scopus 로고    scopus 로고
    • Research on dynamic modeling for reactive power optimization under real-time circumstance
    • ZHANG Yongjun, YU Yue, REN Zhen. Research on dynamic modeling for reactive power optimization under real-time circumstance. Power System Technology, 2004, 28(12): 12-15.
    • (2004) Power System Technology , vol.28 , Issue.12 , pp. 12-15
    • Zhang, Y.1    Y, Y.U.2    Ren, Z.3
  • 4
    • 45449110443 scopus 로고    scopus 로고
    • Heuristic strategy for dynamic reactive optimization incorporating action time constraints between adjacent time intervals
    • YAN Wei, TIAN Tian, ZHANG Haibing. Heuristic strategy for dynamic reactive optimization incorporating action time constraints between adjacent time intervals. Automation of Electric Power Systems, 2008, 32(10): 71-75.
    • (2008) Automation of Electric Power Systems , vol.32 , Issue.10 , pp. 71-75
    • Yan, W.1    Tian, T.2    Zhang, H.3
  • 5
    • 2442689446 scopus 로고    scopus 로고
    • Dynamic reactive-power optimization algorithm incorporating action number constraints of control devices
    • LIU Mingbo, ZHU Chunming, QIAN Kangling. Dynamic reactive-power optimization algorithm incorporating action number constraints of control devices. Proceedings of the CSEE, 2004, 24(3): 34-40.
    • (2004) Proceedings of the CSEE , vol.24 , Issue.3 , pp. 34-40
    • Liu, M.1    Zhu, C.2    Qian, K.3
  • 6
    • 0142039873 scopus 로고    scopus 로고
    • Volt/VAr control in distribution systems using a time-interval based approach[J]
    • Hu Z, Wang X, Chen H, et al. Volt/VAr control in distribution systems using a time-interval based approach[J]. IEE Proc.-Gener. Transm. Distrib., 2003, 150(5), 548-554.
    • (2003) IEE Proc.-Gener. Transm. Distrib , vol.150 , Issue.5 , pp. 548-554
    • Hu, Z.1    Wang, X.2    Chen, H.3
  • 7
    • 84969766652 scopus 로고    scopus 로고
    • Algorithm techniques for transitionoptimized voltage and reactive power control[C]
    • Kunming, China
    • Taylor G A, Rashidinejad M, et al. Algorithm techniques for transitionoptimized voltage and reactive power control[C]. IEEE Proceedings on Power System Technology, Kunming, China, 2002, 10, 1660-1664.
    • (2002) IEEE Proceedings on Power System Technology , Issue.10 , pp. 1660-1664
    • Taylor, G.A.1    Rashidinejad, M.2
  • 8
    • 24944552113 scopus 로고    scopus 로고
    • Optimal reactive power dispatch considering costs of adjusting the control devices
    • Yong-jun Zhang, Zhen Ren. Optimal reactive power dispatch considering costs of adjusting the control devices. IEEE Trans. On Power System, 2005, 20(3): 1349-1356.
    • (2005) IEEE Trans. on Power System , vol.20 , Issue.3 , pp. 1349-1356
    • Zhang, Y.-J.1    Ren, Z.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.