메뉴 건너뛰기




Volumn , Issue , 2011, Pages

On network performance evaluation toward the smart grid: A case study of DNP3 over TCP/IP

Author keywords

[No Author keywords available]

Indexed keywords

COST-EFFICIENT; DELAY CONSTRAINTS; DELAY PERFORMANCE; DEMAND RESPONSE; DISTRIBUTED NETWORKS; INTELLIGENT MECHANISMS; NETWORK PERFORMANCE EVALUATION; POWER DEVICES; POWER INFRASTRUCTURES; PROCESSING DELAY; SCADA PROTOCOLS; SMART GRID; TIMING REQUIREMENTS;

EID: 84863117177     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/GLOCOM.2011.6134406     Document Type: Conference Paper
Times cited : (39)

References (15)
  • 1
    • 72449191827 scopus 로고    scopus 로고
    • NIST framework and roadmap for smart grid interoperability standards, release 1.0
    • Office of the National Coordinator for Smart Grid Interoperability, Jan.
    • Office of the National Coordinator for Smart Grid Interoperability, "NIST framework and roadmap for smart grid interoperability standards, release 1.0," NIST Special Publication 1108, pp. 1-145, Jan. 2010.
    • (2010) NIST Special Publication 1108 , pp. 1-145
  • 2
    • 1542280256 scopus 로고    scopus 로고
    • IEC 61850: Communication networks and systems in substations
    • IEC Standard, "IEC 61850: Communication networks and systems in substations," 2003.
    • (2003) IEC Standard
  • 3
    • 79954590260 scopus 로고    scopus 로고
    • IEEE standard communication delivery time performance requirements for electric power substation automation
    • IEEE
    • IEEE, "IEEE standard communication delivery time performance requirements for electric power substation automation," IEEE Std 1646-2004, 2005.
    • (2005) IEEE Std 1646-2004


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.