-
3
-
-
0034344602
-
Systems research, genetic algorithms, and information systems
-
S. Chaudhry, M. Varano, and L. Xu Systems research, genetic algorithms, and information systems Systems Research and Behavioral Science 17 2 2000 149 162
-
(2000)
Systems Research and Behavioral Science
, vol.17
, Issue.2
, pp. 149-162
-
-
Chaudhry, S.1
Varano, M.2
Xu, L.3
-
9
-
-
70350130615
-
Influencing factors for predicting financial performance based on genetic algorithms
-
Y. Jiang, L. Xu, H. Wang, and H. Wang Influencing factors for predicting financial performance based on genetic algorithms Systems Research and Behavioral Science 26 6 2009 661 673
-
(2009)
Systems Research and Behavioral Science
, vol.26
, Issue.6
, pp. 661-673
-
-
Jiang, Y.1
Xu, L.2
Wang, H.3
Wang, H.4
-
10
-
-
0002719797
-
The Hungarian method for the assignment problem
-
H. Kuhn The Hungarian method for the assignment problem Naval Research Logistics Quarterly 2 1 1955 83 97
-
(1955)
Naval Research Logistics Quarterly
, vol.2
, Issue.1
, pp. 83-97
-
-
Kuhn, H.1
-
11
-
-
47049084822
-
Research on solution and models of fuzzy assignment problem based on compound quantification strategy
-
F. Li, C. Jin, and L. Liu Research on solution and models of fuzzy assignment problem based on compound quantification strategy Systems Engineering - Theory and Practice 28 6 2008 38 44
-
(2008)
Systems Engineering - Theory and Practice
, vol.28
, Issue.6
, pp. 38-44
-
-
Li, F.1
Jin, C.2
Liu, L.3
-
12
-
-
79952444123
-
Intelligent Bionic Genetic Algorithm (IB-GA) and Its convergence
-
F. Li, L. Xu, C. Jin, and H. Wang Intelligent Bionic Genetic Algorithm (IB-GA) and Its convergence Expert Systems With Applications 38 7 2011 8804 8811
-
(2011)
Expert Systems with Applications
, vol.38
, Issue.7
, pp. 8804-8811
-
-
Li, F.1
Xu, L.2
Jin, C.3
Wang, H.4
-
13
-
-
79952451892
-
Structure of Multi-Stage Composite Genetic Algorithm (MSC-GA) and its performance
-
F. Li, L. Xu, C. Jin, and H. Wang Structure of Multi-Stage Composite Genetic Algorithm (MSC-GA) and its performance Expert Systems With Applications 38 7 2011 8929 8937
-
(2011)
Expert Systems with Applications
, vol.38
, Issue.7
, pp. 8929-8937
-
-
Li, F.1
Xu, L.2
Jin, C.3
Wang, H.4
-
14
-
-
84862908182
-
Effects of enterprise technology on supply chain collaboration: Analysis of China-linked supply chain
-
L. Li Effects of enterprise technology on supply chain collaboration: Analysis of China-linked supply chain Enterprise Information Systems 6 1 2012 55 77
-
(2012)
Enterprise Information Systems
, vol.6
, Issue.1
, pp. 55-77
-
-
Li, L.1
-
15
-
-
84863115527
-
Integration of hybrid wireless networks in cloud services oriented enterprise information systems
-
S. Li, L. Xu, X. Wang, and J. Wang Integration of hybrid wireless networks in cloud services oriented enterprise information systems Enterprise Information Systems 6 2 2012 165 187
-
(2012)
Enterprise Information Systems
, vol.6
, Issue.2
, pp. 165-187
-
-
Li, S.1
Xu, L.2
Wang, X.3
Wang, J.4
-
16
-
-
84860908250
-
Multi-terminal pipe routing by Steiner minimal tree and particle swarm optimisation
-
Q. Liu, and C. Wang Multi-terminal pipe routing by Steiner minimal tree and particle swarm optimisation Enterprise Information Systems 6 3 2012 315 327
-
(2012)
Enterprise Information Systems
, vol.6
, Issue.3
, pp. 315-327
-
-
Liu, Q.1
Wang, C.2
-
18
-
-
33750487130
-
Elitist genetic algorithm for assignment problem with imprecise goal
-
J. Majumdar, and A. Bhunia Elitist genetic algorithm for assignment problem with imprecise goal European Journal of Operational Research 177 2007 684 692
-
(2007)
European Journal of Operational Research
, vol.177
, pp. 684-692
-
-
Majumdar, J.1
Bhunia, A.2
-
19
-
-
33749569898
-
Assignment problems: A golden anniversary survey
-
D. Pentico Assignment problems: A golden anniversary survey European Journal of Operational Research 176 2007 774 793
-
(2007)
European Journal of Operational Research
, vol.176
, pp. 774-793
-
-
Pentico, D.1
-
20
-
-
84855959998
-
A grid-based collaborative supply chain with multi-product multi-period production-distribution
-
M. Sepehri A grid-based collaborative supply chain with multi-product multi-period production-distribution Enterprise Information Systems 6 1 2012 115 137
-
(2012)
Enterprise Information Systems
, vol.6
, Issue.1
, pp. 115-137
-
-
Sepehri, M.1
-
21
-
-
37849042471
-
A method for solving the multi-objective assignment problem with fuzzy information
-
Y. Song, X. Wu, and M. Chen A method for solving the multi-objective assignment problem with fuzzy information System Engineering 19 1 2001 28 33
-
(2001)
System Engineering
, vol.19
, Issue.1
, pp. 28-33
-
-
Song, Y.1
Wu, X.2
Chen, M.3
-
22
-
-
84863116649
-
Research on manufacturing grid resource service optimal-selection and composition framework
-
F. Tao, L. Zhang, K. Lu, and D. Zhao Research on manufacturing grid resource service optimal-selection and composition framework Enterprise Information Systems 6 2 2012 237 264
-
(2012)
Enterprise Information Systems
, vol.6
, Issue.2
, pp. 237-264
-
-
Tao, F.1
Zhang, L.2
Lu, K.3
Zhao, D.4
-
23
-
-
13144302333
-
The personnel assignment problem
-
Project SCOOP No. 10, US Air Force, Washington DC
-
Votaw, D.; and Orden, A (1952) The personnel assignment problem. In Symposium on linear inequalities and programming, Project SCOOP No. 10, US Air Force, Washington DC.; pp. 155-163.
-
(1952)
Symposium on Linear Inequalities and Programming
, pp. 155-163
-
-
Votaw, D.1
Orden, A.2
-
24
-
-
79953677451
-
How to measure adaptation complexity in evolvable systems-a new synthetic approach of constructing fitness functions
-
P. Wang, J. Zhang, L. Xu, H. Wang, S. Feng, and H. Zhu How to measure adaptation complexity in evolvable systems-a new synthetic approach of constructing fitness functions Expert Systems with Applications 38 8 2011 10414 10419
-
(2011)
Expert Systems with Applications
, vol.38
, Issue.8
, pp. 10414-10419
-
-
Wang, P.1
Zhang, J.2
Xu, L.3
Wang, H.4
Feng, S.5
Zhu, H.6
-
26
-
-
81255151151
-
Enterprise systems: State-of-the-art and future trends
-
L. Xu Enterprise systems: State-of-the-art and future trends IEEE Transactions on Industrial Informatics 7 4 2011 630 640
-
(2011)
IEEE Transactions on Industrial Informatics
, vol.7
, Issue.4
, pp. 630-640
-
-
Xu, L.1
-
27
-
-
79960311064
-
A new method for automatic synthesis of tolerances for complex assemblies based on polychromatic sets
-
Y. Zhang, Z. Li, L. Xu, and J. Wang A new method for automatic synthesis of tolerances for complex assemblies based on polychromatic sets Enterprise Information Systems 5 3 2011 337 358
-
(2011)
Enterprise Information Systems
, vol.5
, Issue.3
, pp. 337-358
-
-
Zhang, Y.1
Li, Z.2
Xu, L.3
Wang, J.4
|