메뉴 건너뛰기




Volumn 57, Issue 7, 2012, Pages 1821-1826

Optimal pricing and production control in an assembly system with a general stockout cost

Author keywords

Assemble to order; demand process management; dynamic pricing; optimal production control

Indexed keywords

ASSEMBLE-TO-ORDER; ASSEMBLY SYSTEMS; BASE STOCK POLICY; DISCOUNTED PROFIT; DYNAMIC PRICING; END-PRODUCTS; INFINITE HORIZONS; OPTIMAL CONTROLS; OPTIMAL PRODUCTION; PRICE ADJUSTMENT; PROCESS MANAGEMENT; STATE-DEPENDENT; STOCK-OUT; THRESHOLD SWITCHING;

EID: 84862983475     PISSN: 00189286     EISSN: None     Source Type: Journal    
DOI: 10.1109/TAC.2011.2178335     Document Type: Article
Times cited : (20)

References (14)
  • 1
    • 33845541662 scopus 로고    scopus 로고
    • Production and inventory control of a single product assemble-to-order system with multiple customer classes
    • Dec
    • S. Benjaafar and M. ElHafsi, "Production and inventory control of a single product assemble-to-order system with multiple customer classes," Manag. Sci., vol. 52, pp. 1896-1912, Dec. 2006.
    • (2006) Manag. Sci. , vol.52 , pp. 1896-1912
    • Benjaafar, S.1    ElHafsi, M.2
  • 2
    • 84862984525 scopus 로고    scopus 로고
    • Optimal control of assembly systems with multiple stages and multiple demand classes
    • to be published
    • S. Benjaafar,M. ElHafsi, C. Y. Lee, and W. Zhou, "Optimal control of assembly systems with multiple stages and multiple demand classes," Oper. Res., to be published.
    • Oper. Res
    • Benjaafar, S.1    Lee, C.Y.2    Zhou, W.3
  • 4
    • 33244464092 scopus 로고    scopus 로고
    • Joint management of finished goods inventory and demand process for a make-to-stock product: A computational approach
    • Feb
    • L. Chen, Y. Feng, and J. Ou, "Joint management of finished goods inventory and demand process for a make-to-stock product: A computational approach," IEEE Trans. Autom. Control, vol. 51, no. 2, pp. 258-273, Feb. 2006.
    • (2006) IEEE Trans. Autom. Control , vol.51 , Issue.2 , pp. 258-273
    • Chen, L.1    Feng, Y.2    Ou, J.3
  • 5
    • 0027688854 scopus 로고
    • Optimal control of a simple assembly system
    • Nov
    • H. Chen, P. Yang, D. Yao, and X. Chao, "Optimal control of a simple assembly system," Oper. Res. Lett., vol. 14, pp. 199-205, Nov. 1993.
    • (1993) Oper. Res. Lett. , vol.14 , pp. 199-205
    • Chen, H.1    Yang, P.2    Yao, D.3    Chao, X.4
  • 6
    • 46449106330 scopus 로고    scopus 로고
    • Optimal control of price and production in an assemble-to-order system
    • Jul
    • Y. Feng, J. Ou, and Z. Pang, "Optimal control of price and production in an assemble-to-order system," Oper. Res. Lett., vol. 36, pp. 506-512, Jul. 2008.
    • (2008) Oper. Res. Lett. , vol.36 , pp. 506-512
    • Feng, Y.1    Ou, J.2    Pang, Z.3
  • 7
    • 0034288452 scopus 로고    scopus 로고
    • Design and operation of manufacturing systems: The control-point policy
    • Oct
    • S. B. Gershwin, "Design and operation of manufacturing systems: The control-point policy," IIE Trans., vol. 32, pp. 891-906, Oct. 2000.
    • (2000) IIE Trans. , vol.32 , pp. 891-906
    • Gershwin, S.B.1
  • 8
    • 0031199443 scopus 로고    scopus 로고
    • Inventory rationing in a make-to-stock production system with several demand classes and lost sales
    • Aug
    • A. Y. Ha, "Inventory rationing in a make-to-stock production system with several demand classes and lost sales," Manag. Sci., vol. 43, pp. 1093-1103, Aug. 1997.
    • (1997) Manag. Sci. , vol.43 , pp. 1093-1103
    • Ha, A.Y.1
  • 9
    • 33746036891 scopus 로고    scopus 로고
    • Control and optimal control of assemble to order manufacturing systems under heavy traffic
    • May
    • H. J. Kushner, "Control and optimal control of assemble to order manufacturing systems under heavy traffic," Stochast. and Stochast. Rep., vol. 66, no. 3 & 4, pp. 233-272, May 1999.
    • (1999) Stochast. and Stochast. Rep. , vol.66 , Issue.3-4 , pp. 233-272
    • Kushner, H.J.1
  • 10
    • 0001004959 scopus 로고
    • A stochastic theory of the firm
    • Aug
    • L. Li, "A stochastic theory of the firm," Math. Oper. Res., vol. 13, pp. 447-466, Aug. 1992.
    • (1992) Math. Oper. Res. , vol.13 , pp. 447-466
    • Li, L.1
  • 11
    • 33748438981 scopus 로고    scopus 로고
    • Optimal control of a high volume assemble-to-order system
    • Aug
    • E. L. Plambeck and A. R. Ward, "Optimal control of a high volume assemble-to-order system," Math. Oper. Res., vol. 31, pp. 453-477, Aug. 2006.
    • (2006) Math. Oper. Res. , vol.31 , pp. 453-477
    • Plambeck, E.L.1    Ward, A.R.2
  • 12
    • 52049095931 scopus 로고    scopus 로고
    • Optimal control of a high-volume assemble-to-order system with maximum leadtime quotations and expediting
    • Oct
    • E. L. Plambeck and A. R. Ward, "Optimal control of a high-volume assemble-to-order system with maximum leadtime quotations and expediting," Queueing Syst., vol. 60, no. 1-2, pp. 1-69, Oct. 2008.
    • (2008) Queueing Syst. , vol.60 , Issue.1-2 , pp. 1-69
    • Plambeck, E.L.1    Ward, A.R.2
  • 13
    • 0020102514 scopus 로고
    • Conditions for characterizing the structure of optimal strategies in infinite horizon dynamic programs
    • Mar
    • E. L. Porteus, "Conditions for characterizing the structure of optimal strategies in infinite horizon dynamic programs," J. Optimi. Theory and Applic., vol. 36, no. 3, pp. 419-432, Mar. 1982.
    • (1982) J. Optimi. Theory and Applic. , vol.36 , Issue.3 , pp. 419-432
    • Porteus, E.L.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.