메뉴 건너뛰기




Volumn 26, Issue 2, 2012, Pages 396-410

Improving lifting motion planning and re-planning of cranes with consideration for safety and efficiency

Author keywords

Cranes; Motion planning; Re planning; Safety and efficiency

Indexed keywords

CONSTRUCTION EQUIPMENT; CRANES; EFFICIENCY; SAFETY ENGINEERING;

EID: 84862831470     PISSN: 14740346     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.aei.2012.01.003     Document Type: Article
Times cited : (100)

References (41)
  • 1
    • 84862830064 scopus 로고    scopus 로고
    • Master thesis submitted to the Department of Building, Civil and Environmental Engineering at Concordia University
    • H. AlBahnassi, Real-time motion planning and simulation of cranes in construction, Master thesis submitted to the Department of Building, Civil and Environmental Engineering at Concordia University, 2009.
    • (2009) Real-time Motion Planning and Simulation of Cranes in Construction
    • Albahnassi, H.1
  • 2
    • 18144425787 scopus 로고    scopus 로고
    • Collision free path planning of cooperative crane manipulators using genetic algorithm
    • DOI 10.1061/(ASCE)0887-3801(2005)19:2(182)
    • M.S.A.D. Ali, N.R. Babu, and K. Varghese Collision free path planning of cooperative crane manipulators using genetic algorithm Journal of Computing in Civil Engineering, ASCE 19 2 2005 182 193 (Pubitemid 40609905)
    • (2005) Journal of Computing in Civil Engineering , vol.19 , Issue.2 , pp. 182-193
    • Deen Ali, M.S.A.1    Babu, N.R.2    Varghese, K.3
  • 3
    • 84862789125 scopus 로고    scopus 로고
    • June 25, 2010
    • Autodesk Softimage, 2010. Available from: (June 25, 2010).
    • (2010) Autodesk Softimage
  • 4
    • 33845637940 scopus 로고    scopus 로고
    • Anytime path planning and replanning in dynamic environments
    • DOI 10.1109/ROBOT.2006.1642056, 1642056, Proceedings 2006 IEEE International Conference on Robotics and Automation, ICRA 2006
    • J. Berg, D. Ferguson, J. Kuffner, Anytime path planning and replanning in dynamic environments, in: Proceedings of the 2006 IEEE International Conference on Robotics and Automation, May 2006, Orlando, Florida, US, 2006, pp. 2366-2371. (Pubitemid 44940419)
    • (2006) Proceedings - IEEE International Conference on Robotics and Automation , vol.2006 , pp. 2366-2371
    • Van Den Berg, J.1    Ferguson, D.2    Kuffner, J.3
  • 5
    • 72149104769 scopus 로고    scopus 로고
    • Automated recognition of 3D CAD model objects in laser scans and calculation of as-built dimensions for dimensional compliance control in construction
    • F. Bosche Automated recognition of 3D CAD model objects in laser scans and calculation of as-built dimensions for dimensional compliance control in construction Advanced Engineering Informatics 24 1 2010 107 118
    • (2010) Advanced Engineering Informatics , vol.24 , Issue.1 , pp. 107-118
    • Bosche, F.1
  • 7
    • 84862779894 scopus 로고    scopus 로고
    • Computer Science Department Carnegie Mellon University June 25, 2010
    • J.R. Bruce, Robot Motion Planning, Computer Science Department Carnegie Mellon University, 2004. Available from: (June 25, 2010).
    • (2004) Robot Motion Planning
    • Bruce, J.R.1
  • 9
    • 84862825111 scopus 로고    scopus 로고
    • June 25, 2010
    • Cranimax, 2010. Available from: (June 25, 2010).
    • Cranimax, 2010
  • 11
    • 33845669601 scopus 로고    scopus 로고
    • Replanning with RRTs
    • DOI 10.1109/ROBOT.2006.1641879, 1641879, Proceedings 2006 IEEE International Conference on Robotics and Automation, ICRA 2006
    • D. Ferguson, N. Kalra, A. Stentz, Replanning with RRTs,in: Proceedings of the 2006 IEEE International Conference on Robotics and Automation, May 2006, Orlando, Florida, US, 2006, pp. 1243-1248. (Pubitemid 44940242)
    • (2006) Proceedings - IEEE International Conference on Robotics and Automation , vol.2006 , pp. 1243-1248
    • Ferguson, D.1    Kalra, N.2    Stentz, A.3
  • 14
    • 40849134303 scopus 로고    scopus 로고
    • Building information modelling - Experts' views on standardisation and industry deployment
    • DOI 10.1016/j.aei.2007.03.001, PII S1474034607000201
    • R. Howard, and B.C. Bjork Building information modelling-experts' views on standardisation and industry deployment Advanced Engineering Informatics 22 2 2008 271 280 (Pubitemid 351391925)
    • (2008) Advanced Engineering Informatics , vol.22 , Issue.2 , pp. 271-280
    • Howard, R.1    Bjork, B.-C.2
  • 16
    • 33744547057 scopus 로고    scopus 로고
    • Planning and visualization for automated robotic crane erection processes in construction
    • DOI 10.1016/j.autcon.2005.06.008, PII S0926580505000713
    • S.C. Kang, and E. Miranda Planning and visualization for automated robotic crane erection processes in construction Automation in Construction 15 2006 398 414 (Pubitemid 43817503)
    • (2006) Automation in Construction , vol.15 , Issue.4 , pp. 398-414
    • Kang, S.1    Miranda, E.2
  • 18
    • 70350060196 scopus 로고    scopus 로고
    • Three-dimensional simulation and visualization of crane assisted construction erection process
    • S.C. Kang, H.L. Chi, and E. Miranda Three-dimensional simulation and visualization of crane assisted construction erection process Journal of Computing in Civil Engineering, ASCE 23 6 2009 363 371
    • (2009) Journal of Computing in Civil Engineering, ASCE , vol.23 , Issue.6 , pp. 363-371
    • Kang, S.C.1    Chi, H.L.2    Miranda, E.3
  • 20
    • 16444365571 scopus 로고    scopus 로고
    • Construction robot path-planning for earthwork operations
    • DOI 10.1061/(ASCE)0887-3801(2003)17:2(97)
    • S.K. Kim, J.S. Russell, and K.J. Koo Construction robot path-planning for earthwork operations Journal of Computing in Civil Engineering, ASCE 17 2 2003 97 104 (Pubitemid 40475466)
    • (2003) Journal of Computing in Civil Engineering , vol.17 , Issue.2 , pp. 97-104
    • Kim, S.-K.1    Russell, J.S.2    Koo, K.-J.3
  • 23
  • 25
    • 0018533130 scopus 로고
    • Algorithm for planning collision-free paths among polyhedral obstacles
    • DOI 10.1145/359156.359164
    • T. Lozano-Pérez, and M. Wesley An algorithm for planning collision-free paths among polyhedral obstacles Communications of the ACM 22 10 1979 560 570 (Pubitemid 10424755)
    • (1979) Communications of the ACM , vol.22 , Issue.10 , pp. 560-570
    • Lozano-Perez, T.1    Wesley, M.A.2
  • 29
    • 16444376810 scopus 로고    scopus 로고
    • Automated path planning of cooperative crane lifts using heuristic search
    • DOI 10.1061/(ASCE)0887-3801(2003)17:3(197)
    • P.L. Sivakumar, K. Varghese, and N.R. Babu Automated path planning of cooperative crane lifts using heuristic search Journal of Computing in Civil Engineering, ASCE 17 3 2003 197 207 (Pubitemid 40475462)
    • (2003) Journal of Computing in Civil Engineering , vol.17 , Issue.3 , pp. 197-207
    • Sivakumar, P.L.1    Varghese, K.2    Ramesh Babu, N.3
  • 33
    • 0034325173 scopus 로고    scopus 로고
    • Interactive path planning for multi-equipment landfill operations
    • H.P. Tserng, B. Ran, and J.S. Russell Interactive path planning for multi-equipment landfill operations Automation in Construction 10 2000 155 168
    • (2000) Automation in Construction , vol.10 , pp. 155-168
    • Tserng, H.P.1    Ran, B.2    Russell, J.S.3
  • 40
    • 33847335678 scopus 로고    scopus 로고
    • Cell-based representation and analysis of spatial resources in construction simulation
    • DOI 10.1016/j.autcon.2006.07.009, PII S0926580506000781
    • C. Zhang, A. Hammad, T.M. Zayed, G. Wainer, and H. Pang Cell-based representation and analysis of spatial resources in construction simulation Journal of Automation in Construction 16 4 2007 436 448 (Pubitemid 46321513)
    • (2007) Automation in Construction , vol.16 , Issue.4 , pp. 436-448
    • Zhang, C.1    Hammad, A.2    Zayed, T.M.3    Wainer, G.4    Pang, H.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.