메뉴 건너뛰기




Volumn 137, Issue 2, 2012, Pages 284-291

Experimental results for the allocation of buffers in closed serial production lines

Author keywords

Buffer allocation; Closed; Production line design; Simulation experiment

Indexed keywords

BUFFER ALLOCATION; CLOSED; CLOSED PRODUCTION LINE; PRODUCTION LINE; PRODUCTION LINE DESIGN; SERIAL PRODUCTION LINE; SIMULATION EXPERIMENTS;

EID: 84862782132     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2012.02.011     Document Type: Article
Times cited : (28)

References (25)
  • 2
    • 0023981046 scopus 로고
    • The role or work in-process inventory in serial production lines
    • R. Conway, W. Maxwell, J.O. McClain, and L.J. Thomas The role or work in-process inventory in serial production lines Operations Research 36 1988 229 241 (Pubitemid 18648488)
    • (1988) Operations Research , vol.36 , Issue.2 , pp. 229-241
    • Conway, R.1    Maxwell, W.2    McClain, J.O.3    Thomas, L.J.4
  • 3
    • 34249834508 scopus 로고
    • Manufacturing flow line systems: A review of models and analytical results
    • Y. Dallery, and S.B. Gershwin Manufacturing flow line systems: a review of models and analytical results Queueing Systems: Theory and Applications 12 1992 3 94
    • (1992) Queueing Systems: Theory and Applications , vol.12 , pp. 3-94
    • Dallery, Y.1    Gershwin, S.B.2
  • 4
    • 0018328573 scopus 로고
    • The effect of inequality of interstage buffer capacities and operation time variability on the efficiency of production line systems
    • T. El-Rayah The effect of inequality of interstage buffer capacities and operation time variability on the efficiency of production line systems International Journal of Production Research 17 1979 77 89 (Pubitemid 9456561)
    • (1979) Int J Prod Res , vol.17 , Issue.1 , pp. 77-89
    • El-Rayah, T.1
  • 5
    • 0037085111 scopus 로고    scopus 로고
    • Buffer capacity for accommodating machine downtime in serial production lines
    • DOI 10.1080/00207540110091703
    • E. Enginarlar, J. Li, S.M. Meerkov, and R.Q. Zhang Buffer capacity for accommodating machine downtime in serial production lines International Journal of Production Research 40 2002 601 624 (Pubitemid 34593817)
    • (2002) International Journal of Production Research , vol.40 , Issue.3 , pp. 601-624
    • Enginarlar, E.1    Li, J.2    Meerkov, S.M.3    Zhang, R.Q.4
  • 6
    • 0001337659 scopus 로고
    • The effects of breakdowns and interstage storage on production line capacity
    • M. Freeman The effects of breakdowns and interstage storage on production line capacity The Journal of Industrial Engineering 15 1964 194 200
    • (1964) The Journal of Industrial Engineering , vol.15 , pp. 194-200
    • Freeman, M.1
  • 7
    • 0030192549 scopus 로고    scopus 로고
    • Modeling and analysis of closed-loop production lines with unreliable machines and finite buffers
    • Y. Frein, C. Commault, and Y. Dallery Modeling and analysis of closed-loop production lines with unreliable machines and finite buffers IIE Transactions 28 1996 545 554 (Pubitemid 126760590)
    • (1996) IIE Transactions (Institute of Industrial Engineers) , vol.28 , Issue.7 , pp. 545-554
    • Frein, Y.1    Commault, C.2    Dallery, Y.3
  • 8
    • 34249315492 scopus 로고    scopus 로고
    • An approximate analytical method for evaluating the performance of closed-loop flow systems with unreliable machines and finite buffers
    • DOI 10.1080/00207540500385980, PII 779020706
    • S.B. Gershwin, and L.M. Werner An approximate analytical method for evaluating the performance of closed loop flow systems with unreliable machines and finite buffers International Journal of Production Research 45 14 2007 3085 3111 (Pubitemid 46809093)
    • (2007) International Journal of Production Research , vol.45 , Issue.14 , pp. 3085-3111
    • Gershwin, S.B.1    Werner, L.M.2
  • 9
    • 0001012830 scopus 로고
    • The effect of the coefficient of variation of operation times on the allocation of storage space in production line systems
    • F. Hillier, and K. So The effect of the coefficient of variation of operation times on the allocation of storage space in production line systems IIE Transactions 23 1991 198 206
    • (1991) IIE Transactions , vol.23 , pp. 198-206
    • Hillier, F.1    So, K.2
  • 10
    • 0026239015 scopus 로고
    • Effect of machine breakdowns and interstage storage on the performance of production line systems
    • F. Hillier, and K. So The effect of machine breakdowns and interstage storage on the performance of production line systems International Journal of Production Research 29 1991 2043 2055 (Pubitemid 21693196)
    • (1991) International Journal of Production Research , vol.29 , Issue.10 , pp. 2043-2055
    • Hillier Frederick, S.1    So Kut, C.2
  • 11
    • 0027251210 scopus 로고
    • Notes: Toward characterizing the optimal allocation of storage space in production line systems with variable processing times
    • F. Hillier, K. So, and R. Boling Notes: toward characterizing the optimal allocation of storage space in production line systems with variable processing times Management Science 39 1993 126 132
    • (1993) Management Science , vol.39 , pp. 126-132
    • Hillier, F.1    So, K.2    Boling, R.3
  • 12
    • 0033640431 scopus 로고    scopus 로고
    • Characterizing the optimal allocation of storage space in production line systems with variable processing times
    • DOI 10.1023/A:1007633112170
    • M. Hillier Characterizing the optimal allocation of storage space in production line systems with variable processing times IIE Transactions 32 2000 1 8 (Pubitemid 32210834)
    • (2000) IIE Transactions (Institute of Industrial Engineers) , vol.32 , Issue.1 , pp. 1-8
    • Hillier, M.S.1
  • 14
    • 0000285320 scopus 로고    scopus 로고
    • Empirical evaluation of exponential and independence assumptions in queueing models of manufacturing systems
    • R. Inman Empirical evaluation of exponential and independence assumptions in queueing models of manufacturing systems Production and Operations Management 8 1999 409 432
    • (1999) Production and Operations Management , vol.8 , pp. 409-432
    • Inman, R.1
  • 15
    • 0036646891 scopus 로고    scopus 로고
    • An upper bound for carriers in a three-workstation closed serial production system operating under production blocking
    • DOI 10.1109/TAC.2002.800653, PII 1011092002800653
    • D.S. Kim, F. Lin, and D.M. Kulkarni An upper bound for the carrier number in a closed serial production system operating under production blocking IEEE Transactions on Automatic Control 47 2002 1134 1138 (Pubitemid 34835339)
    • (2002) IEEE Transactions on Automatic Control , vol.47 , Issue.7 , pp. 1134-1138
    • Kim, D.S.1    Kulkarni, D.M.2    Lin, F.3
  • 18
    • 0018433897 scopus 로고
    • The reversibility property of production lines
    • E. Muth The reversibility property of production lines Management Science 25 1979 152 158
    • (1979) Management Science , vol.25 , pp. 152-158
    • Muth, E.1
  • 19
    • 0035277752 scopus 로고    scopus 로고
    • Minimizing WIP inventory in reliable production lines
    • DOI 10.1016/S0925-5273(00)00056-6
    • H.T. Papadopoulos, and M.I. Vidalis Minimizing WIP inventory in reliable production lines International Journal of Production Economics 70 2001 185 197 (Pubitemid 32264331)
    • (2001) International Journal of Production Economics , vol.70 , Issue.2 , pp. 185-197
    • Papadopoulos, H.T.1    Vidalis, M.I.2
  • 20
    • 0000816262 scopus 로고
    • Buffer allocation in unbalanced three-station serial lines
    • S. Powell Buffer allocation in unbalanced three-station serial lines International Journal of Production Research 32 1994 2201 2217
    • (1994) International Journal of Production Research , vol.32 , pp. 2201-2217
    • Powell, S.1
  • 24
    • 70449639984 scopus 로고    scopus 로고
    • A new method for the placement of buffers in serial production lines
    • H.A. Vergara, and D.S. Kim. A new method for the placement of buffers in serial production lines International Journal of Production Research 47 16 2009 4437 4456
    • (2009) International Journal of Production Research , vol.47 , Issue.16 , pp. 4437-4456
    • Vergara, H.A.1    Kim, D.S.2
  • 25
    • 0032351556 scopus 로고    scopus 로고
    • Buffer allocation in unreliable production lines using a knowledge based system
    • G. Vouros, and H. Papadopoulos Buffer allocation in unreliable production lines using a knowledge based system Computers and Operations Research 25 1998 1055 1067
    • (1998) Computers and Operations Research , vol.25 , pp. 1055-1067
    • Vouros, G.1    Papadopoulos, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.