-
1
-
-
39649091653
-
Design of Admissible Schedules for AGV Systems with Constraints: A Logic-Algebraic Approach
-
Nguyen, N.T., Grzech, A., Howlett, R.J., Jain, L.C. (eds.) KES-AMSTA 2007. Springer, Heidelberg
-
Bocewicz, G., Wójcik, R., Banaszak, Z.: Design of Admissible Schedules for AGV Systems with Constraints: A Logic-Algebraic Approach. In: Nguyen, N.T., Grzech, A., Howlett, R.J., Jain, L.C. (eds.) KES-AMSTA 2007. LNCS (LNAI), vol. 4496, pp. 578-587. Springer, Heidelberg (2007)
-
(2007)
LNCS (LNAI)
, vol.4496
, pp. 578-587
-
-
Bocewicz, G.1
Wójcik, R.2
Banaszak, Z.3
-
2
-
-
84862751915
-
Declarative approach to cyclic scheduling of multimodal processes
-
Golińska, P. (ed.) Springer, Heidelberg in print
-
Bocewicz, G., Banaszak, Z.: Declarative approach to cyclic scheduling of multimodal processes. In: Golińska, P. (ed.) EcoProduction and Logistics, vol. 1. Springer, Heidelberg (in print, 2012)
-
(2012)
EcoProduction and Logistics
, vol.1
-
-
Bocewicz, G.1
Banaszak, Z.2
-
3
-
-
77955700913
-
Complexity of cyclic scheduling problems: A state-of-the-art survey
-
Levner, E., Kats, V., Alcaide, D., Pablo, L., Cheng, T.C.E.: Complexity of cyclic scheduling problems: A state-of-the-art survey. Computers & Industrial Engineering 59(2), 352-361 (2010)
-
(2010)
Computers & Industrial Engineering
, vol.59
, Issue.2
, pp. 352-361
-
-
Levner, E.1
Kats, V.2
Alcaide, D.3
Pablo, L.4
Cheng, T.C.E.5
-
4
-
-
2942715152
-
The performance evaluation tool for automated prototyping of concurrent cyclic processes
-
Polak, M., Majdzik, P., Banaszak, Z., Wójcik, R.: The performance evaluation tool for automated prototyping of concurrent cyclic processes. Fundamenta Informaticae 60(1-4), 269-289 (2004)
-
(2004)
Fundamenta Informaticae
, vol.60
, Issue.1-4
, pp. 269-289
-
-
Polak, M.1
Majdzik, P.2
Banaszak, Z.3
Wójcik, R.4
-
5
-
-
0032042832
-
Petri net modeling and scheduling for cyclic job shops with blocking
-
Song, J.-S., Lee, T.-E.: Petri net modeling and scheduling for cyclic job shops with blocking. Computers & Industrial Engineering 34(2), 281-295 (1998)
-
(1998)
Computers & Industrial Engineering
, vol.34
, Issue.2
, pp. 281-295
-
-
Song, J.-S.1
Lee, T.-E.2
-
6
-
-
0037454059
-
A New Algorithm for Cyclic Scheduling and Design of Multipurpose Batch Plants
-
Heo, S.-K., Lee, K.-H., Lee, H.-K., Lee, I.-B., Park, J.H.: A New Algorithm for Cyclic Scheduling and Design of Multipurpose Batch Plants. Ind. Eng. Chem. Res. 42(4), 836-846 (2003)
-
(2003)
Ind. Eng. Chem. Res.
, vol.42
, Issue.4
, pp. 836-846
-
-
Heo, S.-K.1
Lee, K.-H.2
Lee, H.-K.3
Lee, I.-B.4
Park, J.H.5
-
7
-
-
34249997301
-
Research on the train operation plan of the Beijing-Tianjin inter-city railway based on periodic train diagrams
-
Wang, B., Yang, H., Zhang, Z.-H.: Research on the train operation plan of the Beijing-Tianjin inter-city railway based on periodic train diagrams. Tiedao Xuebao/ Journal of the China Railway Society 29(2), 8-13 (2007)
-
(2007)
Tiedao Xuebao/ Journal of the China Railway Society
, vol.29
, Issue.2
, pp. 8-13
-
-
Wang, B.1
Yang, H.2
Zhang, Z.-H.3
-
8
-
-
38749104007
-
-
Ph.D. Dissertation, Fachbereich Mathematik/Informatik, Universität Osnabrück
-
Von Kampmeyer, T.: Cyclic scheduling problems, Ph.D. Dissertation, Fachbereich Mathematik/Informatik, Universität Osnabrück (2006)
-
(2006)
Cyclic Scheduling Problems
-
-
Von Kampmeyer, T.1
|