-
1
-
-
79960928806
-
Alternative shut- in and pump start-up procedures for kicks taken during mpd operations
-
Denver, 5-6 April
-
Chirinos, J.E., Smith, J.R., and Bourgoyne, D.A. 2011a. Alternative Shut- In and Pump Start-Up Procedures for Kicks Taken During MPD Operations. Paper SPE 143094 presented at the IADC/SPE Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition, Denver, 5-6 April. http://dx.doi.org/ 10.2118/143094-MS.
-
(2011)
Paper SPE 143094 Presented at the IADC/SPE Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition
-
-
Chirinos, J.E.1
Smith, J.R.2
Bourgoyne, D.A.3
-
2
-
-
84863060589
-
A simplified method to estimate peak casing pressure during mpd well control
-
Denver, 30 October-2 November
-
Chirinos, J.E., Smith, J.R., and Bourgoyne, D.A. 2011b. A Simplified Method to Estimate Peak Casing Pressure During MPD Well Control. Paper SPE 147496 presented at the SPE Annual Technical Conference and Exhibition, Denver, 30 October-2 November. http://dx.doi.org/10.2118/147496-MS.
-
(2011)
Paper SPE 147496 Presented at the SPE Annual Technical Conference and Exhibition
-
-
Chirinos, J.E.1
Smith, J.R.2
Bourgoyne, D.A.3
-
3
-
-
51649111965
-
Simulations comparing different initial responses to kicks taken during managed pressure drilling
-
Orlando, Florida, USA, 4-6 March
-
Das, A.K., Smith, J.R., and Frink, P.J. 2008. Simulations Comparing Different Initial Responses to Kicks Taken During Managed Pressure Drilling. Paper SPE 112761 presented at the IADC/SPE Drilling Conference, Orlando, Florida, USA, 4-6 March. http://dx.doi.org/10.2118/112761-MS.
-
(2008)
Paper SPE 112761 Presented at the IADC/SPE Drilling Conference
-
-
Das, A.K.1
Smith, J.R.2
Frink, P.J.3
-
4
-
-
79958812515
-
Evaluation of alternative initial responses to kicks taken during managed pressure drilling
-
Davoudi, M., Smith, J.R., Patel, B., and Chirinos, J.E. 2010. Evaluation of Alternative Initial Responses to Kicks Taken during Managed Pressure Drilling. SPE Drill & Compl 26 (2): 169-181. http://dx.doi.org/10.2118/ 128424-PA.
-
(2010)
SPE Drill & Compl
, vol.26
, Issue.2
, pp. 169-181
-
-
Davoudi, M.1
Smith, J.R.2
Patel, B.3
Chirinos, J.E.4
-
8
-
-
84889928418
-
-
MMS. Report, NTL 2008-G07, Minerals Management Service GOMR, New Orleans, Louisiana 15 June 2008), (accessed October 2010)
-
MMS. 2008. Notice to Lessees and Operators of Federal Oil, Gas, and Sulphur Leases in the Outer Continental Shelf, Gulf of Mexico OCS Region: Managed Pressure Drilling Projects. Report, NTL 2008-G07, Minerals Management Service GOMR, New Orleans, Louisiana (15 June 2008), http://www.iadc.org/ committees/ubo-mpd/Documents/MMS%20NTL%202008-G07.pdf (accessed October 2010).
-
(2008)
Notice to Lessees and Operators of Federal Oil, Gas, and Sulphur Leases in the Outer Continental Shelf, Gulf of Mexico OCS Region: Managed Pressure Drilling Projects
-
-
-
9
-
-
40449084210
-
First field applications of microflux control show very positive surprises
-
Galveston, Texas, USA, 28-29 March
-
Santos, H., Catak, E., Kinder, J., Franco, E., Lage, A., and Sonnemann, P. 2007. First Field Applications of Microflux Control Show Very Positive Surprises. Paper SPE 108333 presented at the IADC/SPE Managed Pressure Drilling & Underbalanced Operations, Galveston, Texas, USA, 28-29 March. http://dx.doi.org/10.2118/108333-MS.
-
(2007)
Paper SPE 108333 Presented at the IADC/SPE Managed Pressure Drilling & Underbalanced Operations
-
-
Santos, H.1
Catak, E.2
Kinder, J.3
Franco, E.4
Lage, A.5
Sonnemann, P.6
-
10
-
-
33645399731
-
Developing the micro-flux control method - Part 1: System development, field test preparation, and results
-
Dubai, 12-14 September
-
Santos, H., Reid, P., Jones, J., and McCaskill, J. 2005. Developing the Micro-Flux Control Method - Part 1: System Development, Field Test Preparation, and Results. Paper SPE 97025 presented at the SPE/IADC Middle East Drilling Technology Conference and Exhibition, Dubai, 12-14 September. http://dx.doi.org/10.2118/97025-MS.
-
(2005)
Paper SPE 97025 Presented at the SPE/IADC Middle East Drilling Technology Conference and Exhibition
-
-
Santos, H.1
Reid, P.2
Jones, J.3
McCaskill, J.4
-
11
-
-
33645300555
-
Development and testing of a fully automated system to accurately control downhole pressure during drilling operations
-
Abu Dhabi, UAE, 20-22 October
-
van Riet, E.J., Reitsma, D., and Vandercraen, B. 2003. Development and Testing of a Fully Automated System to Accurately Control Downhole Pressure during Drilling Operations. Paper SPE 85310 presented at the SPE/IADC Middle East Drilling Technology Conference and Exhibition, Abu Dhabi, UAE, 20-22 October. http://dx.doi.org/10.2118/85310-MS.
-
(2003)
Paper SPE 85310 Presented at the SPE/IADC Middle East Drilling Technology Conference and Exhibition
-
-
Van Riet, E.J.1
Reitsma, D.2
Vandercraen, B.3
-
12
-
-
85038456054
-
-
Richardson, Texas: Textbook Series, SPE
-
Watson, D., Brittenham, T., and Moore, P.L. 2003. Advanced Well Control, Vol. 10. Richardson, Texas: Textbook Series, SPE.
-
(2003)
Advanced Well Control
, vol.10
-
-
Watson, D.1
Brittenham, T.2
Moore, P.L.3
|