-
1
-
-
37549000571
-
Reliability based simulation-optimization model for multi reservoir hydropower system operations: Khersan experience
-
Afzali R, Mousavi SJ, Ghaheri A (2008) Reliability based simulation-optimization model for multi reservoir hydropower system operations: Khersan experience. J Water Resour Plann Manag 134(1): 24-33.
-
(2008)
J Water Resour Plann Manag
, vol.134
, Issue.1
, pp. 24-33
-
-
Afzali, R.1
Mousavi, S.J.2
Ghaheri, A.3
-
2
-
-
21044444591
-
Genetic algorithm for optimal operating policy of a multipurpose reservoir
-
Ahmed JA, Sarma AK (2005) Genetic algorithm for optimal operating policy of a multipurpose reservoir. Water Resour Manag 19(2): 145-161.
-
(2005)
Water Resour Manag
, vol.19
, Issue.2
, pp. 145-161
-
-
Ahmed, J.A.1
Sarma, A.K.2
-
3
-
-
10244252692
-
Modeling uncertainties in short-term reservoir operation using fuzzy sets and a genetic algorithm
-
Akter T, Simonovic SP (2004) Modeling uncertainties in short-term reservoir operation using fuzzy sets and a genetic algorithm. Hydrolog Sci J 49(6): 1079-1081.
-
(2004)
Hydrolog Sci J
, vol.49
, Issue.6
, pp. 1079-1081
-
-
Akter, T.1
Simonovic, S.P.2
-
4
-
-
84861482441
-
Improving stochastic reservoir optimization models with long term mean inflow forecast
-
doi: 10. 1007/s11269-012-0025-1
-
Alcigeimes BC, Billib M (2012) Improving stochastic reservoir optimization models with long term mean inflow forecast. Water Resour Manag. doi: 10. 1007/s11269-012-0025-1.
-
(2012)
Water Resour Manag
-
-
Alcigeimes, B.C.1
Billib, M.2
-
5
-
-
50149114498
-
Integrating long- and short-term reservoir operation models via stochastic and deterministic optimization: case study in Japan
-
Alcigeimes BC, Suzuki K, Akihiro K (2008) Integrating long- and short-term reservoir operation models via stochastic and deterministic optimization: case study in Japan. J Water Resour Plann Manag 134(5): 440-448.
-
(2008)
J Water Resour Plann Manag
, vol.134
, Issue.5
, pp. 440-448
-
-
Alcigeimes, B.C.1
Suzuki, K.2
Akihiro, K.3
-
6
-
-
0037687647
-
Optimization of large scal hydropower system operation
-
Barros MTL, Tsai FT-C, Yang Shu-li, Lopes JEG, Yeh WW-G (2003) Optimization of large scal hydropower system operation. J Water Resour Plann Manag 129(3): 178-188.
-
(2003)
J Water Resour Plann Manag
, vol.129
, Issue.3
, pp. 178-188
-
-
Barros, M.T.L.1
Tsai, F.T.-C.2
Yang, S.-L.3
Lopes, J.E.G.4
Yeh, W.W.-G.5
-
7
-
-
22944478981
-
Optimizing the reservoir operating rule curves by genetic algorithms
-
Chang F-J, Chen L, Chang Li Chiu (2005) Optimizing the reservoir operating rule curves by genetic algorithms. Hydrolog Process 19(11): 2277-2289.
-
(2005)
Hydrolog Process
, vol.19
, Issue.11
, pp. 2277-2289
-
-
Chang, F.-J.1
Chen, L.2
Chang, L.C.3
-
8
-
-
44649106898
-
Optimizing hydropower reservoir operation using hybrid genetic algorithm and chaos
-
Cheng C-T, Wang W-C, Xu D-M, Chau KW (2007) Optimizing hydropower reservoir operation using hybrid genetic algorithm and chaos. Water Resour Manag 22(7): 895-909.
-
(2007)
Water Resour Manag
, vol.22
, Issue.7
, pp. 895-909
-
-
Cheng, C.-T.1
Wang, W.-C.2
Xu, D.-M.3
Chau, K.W.4
-
9
-
-
0021639998
-
Short-termsingle multi-purpose reservoir operation: importance of loss functions and forecast errors
-
Datta B, Burges SJ (1984) Short-termsingle multi-purpose reservoir operation: importance of loss functions and forecast errors. Water Resour Res 20(9): 1167-1186.
-
(1984)
Water Resour Res
, vol.20
, Issue.9
, pp. 1167-1186
-
-
Datta, B.1
Burges, S.J.2
-
11
-
-
7544240414
-
A chance-constrained model for the operation of the Aswan high dam
-
Duffuaa SO (1991) A chance-constrained model for the operation of the Aswan high dam. Eng Optim 17: 109-121.
-
(1991)
Eng Optim
, vol.17
, pp. 109-121
-
-
Duffuaa, S.O.1
-
12
-
-
84856019193
-
Optimal and adaptive operation of a hydropower system with unit commitment and water quality constraints
-
Ferreira AR, Teegavarapu RSV (2012) Optimal and adaptive operation of a hydropower system with unit commitment and water quality constraints. Water Resour Manag 26(3): 707-732.
-
(2012)
Water Resour Manag
, vol.26
, Issue.3
, pp. 707-732
-
-
Ferreira, A.R.1
Teegavarapu, R.S.V.2
-
13
-
-
0021892558
-
Algorithms for optimizing hydropower system operation
-
Grygier JC, Stedinger JR (1985) Algorithms for optimizing hydropower system operation. Water Resour Res 21(1): 1-10.
-
(1985)
Water Resour Res
, vol.21
, Issue.1
, pp. 1-10
-
-
Grygier, J.C.1
Stedinger, J.R.2
-
14
-
-
79960715026
-
Development of operational policy for a multi-reservoir system in India using genetic algorithm
-
Jyothiprakash V, Shanthi G, Arunkumar R (2011) Development of operational policy for a multi-reservoir system in India using genetic algorithm. Water Resour Manag 25(10): 2405-2423.
-
(2011)
Water Resour Manag
, vol.25
, Issue.10
, pp. 2405-2423
-
-
Jyothiprakash, V.1
Shanthi, G.2
Arunkumar, R.3
-
15
-
-
0026743584
-
Multi-objective optimization of reservoir systems operation
-
Ko S-K, Fontane DG, Labadie JW (1992) Multi-objective optimization of reservoir systems operation. J Am Water Resour Assoc 28(1): 111-127.
-
(1992)
J Am Water Resour Assoc
, vol.28
, Issue.1
, pp. 111-127
-
-
Ko, S.-K.1
Fontane, D.G.2
Labadie, J.W.3
-
16
-
-
1842686887
-
Optimal operation of multi-reservoir systems: state-of-the-art review
-
Labadie JW (2004) Optimal operation of multi-reservoir systems: state-of-the-art review. J Water Resour Plann Manag 130(2): 93-111.
-
(2004)
J Water Resour Plann Manag
, vol.130
, Issue.2
, pp. 93-111
-
-
Labadie, J.W.1
-
17
-
-
79960705269
-
Application of a Genetic Algorithm for the Optimization of a Complex Reservoir System in Tunisia
-
Louati MH, Sihem B, Lebdi F, Darko M (2011) Application of a Genetic Algorithm for the Optimization of a Complex Reservoir System in Tunisia. Water Resour Manag 25(10): 2387-2404.
-
(2011)
Water Resour Manag
, vol.25
, Issue.10
, pp. 2387-2404
-
-
Louati, M.H.1
Sihem, B.2
Lebdi, F.3
Darko, M.4
-
18
-
-
33750403562
-
Optimal reservoir operation using multi-objective evolutionary algorithm
-
Reddy JM, Kumar DN (2006) Optimal reservoir operation using multi-objective evolutionary algorithm. Water Resour Manag 20(6): 861-878.
-
(2006)
Water Resour Manag
, vol.20
, Issue.6
, pp. 861-878
-
-
Reddy, J.M.1
Kumar, D.N.2
-
19
-
-
33847134303
-
Multi-objective differential evolution with application to reservoir system optimization
-
Reddy JM, Nagesh Kumar D (2007a) Multi-objective differential evolution with application to reservoir system optimization. J Comput Civ Eng 21(2): 136-146.
-
(2007)
J Comput Civ Eng
, vol.21
, Issue.2
, pp. 136-146
-
-
Reddy, J.M.1
Nagesh Kumar, D.2
-
20
-
-
34547849986
-
Multi-objective particle swarm optimization for generating optimal trade-offs in reservoir operation
-
Wiley InterScience
-
Reddy JM, Nagesh Kumar D (2007b) Multi-objective particle swarm optimization for generating optimal trade-offs in reservoir operation. Hydrolog Process 21(21): 2897-2909, Wiley InterScience.
-
(2007)
Hydrolog Process
, vol.21
, Issue.21
, pp. 2897-2909
-
-
Reddy, J.M.1
Nagesh Kumar, D.2
-
21
-
-
58649091126
-
Performance evaluation of elitist-mutated multi-objective particle swarm optimization for integrated water resources management
-
IWA Publishing
-
Reddy JM, Nagesh Kumar D (2009) Performance evaluation of elitist-mutated multi-objective particle swarm optimization for integrated water resources management. J Hydroinformatics 11(1): 79-88, IWA Publishing.
-
(2009)
J Hydroinformatics
, vol.11
, Issue.1
, pp. 79-88
-
-
Reddy, J.M.1
Nagesh Kumar, D.2
-
22
-
-
0034298296
-
Multi-reservoir systems optimization using genetic algorithms: case study
-
Sharif M, Wardlaw R (2000) Multi-reservoir systems optimization using genetic algorithms: case study. J Comput Civ Eng 14(4): 255-263.
-
(2000)
J Comput Civ Eng
, vol.14
, Issue.4
, pp. 255-263
-
-
Sharif, M.1
Wardlaw, R.2
-
23
-
-
0030217641
-
Reservoir operation for hydropower optimization: a chance constrained approach
-
Sreenivasan KR, Vedula S (1996) Reservoir operation for hydropower optimization: a chance constrained approach. Academy proceedings in Engineering Sciences 21(4): 503-510.
-
(1996)
Academy Proceedings in Engineering Sciences
, vol.21
, Issue.4
, pp. 503-510
-
-
Sreenivasan, K.R.1
Vedula, S.2
-
24
-
-
0025473489
-
Real-time multi-purpose reservoir operation: a case study
-
Vedula S, Mohan S (1990) Real-time multi-purpose reservoir operation: a case study. Hydrolog Sci 35(4): 447-462.
-
(1990)
Hydrolog Sci
, vol.35
, Issue.4
, pp. 447-462
-
-
Vedula, S.1
Mohan, S.2
-
25
-
-
0036605213
-
A hybrid chaotic genetic algorithm for short-term hydro system scheduling
-
Yuan X, Yua Y, Zhang Y (2002) A hybrid chaotic genetic algorithm for short-term hydro system scheduling. Math Comput Simulat 59(4): 319-327.
-
(2002)
Math Comput Simulat
, vol.59
, Issue.4
, pp. 319-327
-
-
Yuan, X.1
Yua, Y.2
Zhang, Y.3
-
26
-
-
77956172377
-
Long-term stochastic reservoir operation using a noisy genetic algorithm
-
Yun R, Singh VP, Dong Z (2010) Long-term stochastic reservoir operation using a noisy genetic algorithm. Water Resour Manag 24(12): 3159-3172.
-
(2010)
Water Resour Manag
, vol.24
, Issue.12
, pp. 3159-3172
-
-
Yun, R.1
Singh, V.P.2
Dong, Z.3
|