-
1
-
-
85169523330
-
-
CAISO, Fifth Replacement FERC Electric Tariff, California Independent System Operator, at.
-
CAISO (2011), Fifth Replacement FERC Electric Tariff, California Independent System Operator, at http://www.caiso.com/Documents/CombinedPDFDocument-FifthReplacementCAISOTariff.pdf.
-
(2011)
-
-
-
2
-
-
0014974581
-
Duality in Nonlinear Programming: A Simplified Applications-Oriented Development
-
Geoffrion A.M. Duality in Nonlinear Programming: A Simplified Applications-Oriented Development. SIAM Rev. 1971, 13(1):1-37. http://www.jstor.org/stable/10.2307/2028848.
-
(1971)
SIAM Rev.
, vol.13
, Issue.1
, pp. 1-37
-
-
Geoffrion, A.M.1
-
4
-
-
34249835223
-
Contract Networks for Electric Power Transmission
-
Hogan W.W. Contract Networks for Electric Power Transmission. J. Reg. Econ. 1992, 4(3):211-242. http://www.springerlink.com/index/wh70283126518105.pdf.
-
(1992)
J. Reg. Econ.
, vol.4
, Issue.3
, pp. 211-242
-
-
Hogan, W.W.1
-
5
-
-
0036102149
-
Electricity Market Restructuring: Reforms of Reforms
-
Hogan W.W. Electricity Market Restructuring: Reforms of Reforms. J. Reg. Econ. 2002, 21(1):103-132. http://www.springerlink.com/index/M488771227KN3R02.pdf.
-
(2002)
J. Reg. Econ.
, vol.21
, Issue.1
, pp. 103-132
-
-
Hogan, W.W.1
-
6
-
-
84888844764
-
Electricity Wholesale Market Design in a Low-Carbon Future
-
RFF Press, Washington, DC, B. Moselle, J. Padilla, R. Schmalensee (Eds.)
-
Hogan W.W. Electricity Wholesale Market Design in a Low-Carbon Future. Harnessing Renewable Energy in Electric Power 2010, 113-136. RFF Press, Washington, DC. http://books.google.com/books%3Fhl=en%26amp;lr=%26amp;id=KHJIC6JdZXIC%26amp;oi=fnd%26amp;pg=PA113%26amp;dq=Electricity+Wholesale+Market+Design+in+a+Low+Carbon+Future%26amp;ots=INnkMfF9-Z%26amp;sig=G1l6p1H0_dKtmdFXzDjbNoOVjpQ, B. Moselle, J. Padilla, R. Schmalensee (Eds.).
-
(2010)
Harnessing Renewable Energy in Electric Power
, pp. 113-136
-
-
Hogan, W.W.1
-
7
-
-
85169533728
-
-
Comments on PJM's Minimum Offer Price Rule, FERC Technical Conference, Docket Nos. EL11-20-001, ER11-2875-001-002, at.
-
W.W. Hogan (2011), Comments on PJM's Minimum Offer Price Rule, FERC Technical Conference, Docket Nos. EL11-20-001, ER11-2875-001-002, at http://www.hks.harvard.edu/fs/whogan/Hogan_Statement_2011-08-25.pdf.
-
(2011)
-
-
Hogan, W.W.1
-
8
-
-
0005037996
-
Using Mathematical Programming for Electricity Spot Pricing
-
Hogan W.W., Read E.G., Ring B.J. Using Mathematical Programming for Electricity Spot Pricing. Int. Trans. Operational Res. 1996, 3(3):209-221. http://onlinelibrary.wiley.com/doi/10.1111/j.1475-3995.1996.tb00048.x/Abstract.
-
(1996)
Int. Trans. Operational Res.
, vol.3
, Issue.3
, pp. 209-221
-
-
Hogan, W.W.1
Read, E.G.2
Ring, B.J.3
-
9
-
-
85169530699
-
-
Inter-Tie Congestion Pricing, Dept. of Market Monitoring, California Independent System Operator, at.
-
K. Wells (2010), Inter-Tie Congestion Pricing, Dept. of Market Monitoring, California Independent System Operator, at http://www.caiso.com/275e/275e806242f0.pdf.
-
(2010)
-
-
Wells, K.1
|