메뉴 건너뛰기




Volumn 13, Issue , 2009, Pages 1-11

Adaptive scheduling of data paths using Uppaal Tiga

Author keywords

[No Author keywords available]

Indexed keywords

IMAGE PROCESSING; SCHEDULING;

EID: 84862005625     PISSN: 20752180     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.4204/EPTCS.13.1     Document Type: Conference Paper
Times cited : (8)

References (15)
  • 3
    • 43349090712 scopus 로고    scopus 로고
    • Deliverable from the European project IST-2001-35304 Advanced Methods for Timed Systems (AMETIST)
    • AMETIST (2007). Final Project Report. Available at http://www.cs.ru.nl/F.Vaandrager/AMETIST/ final.pdf. Deliverable from the European project IST-2001-35304 Advanced Methods for Timed Systems (AMETIST).
    • (2007) Final Project Report
  • 4
    • 33746275265 scopus 로고    scopus 로고
    • Production Scheduling by Reachability Analysis - A Case Study
    • CD-ROM / Abstracts Proceedings, 4-8 April 2005, Denver, CA, USA. IEEE Computer Society
    • G. Behrmann, E. Brinksma, M. Hendriks & A. Mader (2005): Production Scheduling by Reachability Analysis - A Case Study. In: 19th International Parallel and Distributed Processing Symposium (IPDPS 2005), CD-ROM / Abstracts Proceedings, 4-8 April 2005, Denver, CA, USA. IEEE Computer Society. Available at http://doi.ieeecomputersociety.org/10.1109/IPDPS.2005.363.
    • (2005) 19th International Parallel and Distributed Processing Symposium (IPDPS 2005)
    • Behrmann, G.1    Brinksma, E.2    Hendriks, M.3    Mader, A.4
  • 12
    • 84947771104 scopus 로고
    • On the Synthesis of Discrete Controllers for Timed Systems
    • E.W. Mayr & C. Puech, editors, Springer-Verlag
    • O. Maler, A. Pnueli & J. Sifakis (1995): On the Synthesis of Discrete Controllers for Timed Systems. In: E.W. Mayr & C. Puech, editors: Proceedings STACS'95, Lecture Notes in Computer Science 900. Springer-Verlag, pp. 229-242.
    • (1995) Proceedings STACS'95, Lecture Notes in Computer Science 900 , pp. 229-242
    • Maler, O.1    Pnueli, A.2    Sifakis, J.3
  • 13
    • 30244473255 scopus 로고
    • The Scheduler's Knowledge of Uncertainty: The Missing Link
    • J. Browne, editor, Elsevier Science, New York
    • K.N. McKay, J.A. Buzacott & F.R. Safayeni (1989): The Scheduler's Knowledge of Uncertainty: The Missing Link. In: J. Browne, editor: Knowledge Based Production Management Systems. Elsevier Science, New York, pp. 171-189.
    • (1989) Knowledge Based Production Management Systems , pp. 171-189
    • McKay, K.N.1    Buzacott, J.A.2    Safayeni, F.R.3
  • 14
    • 0002748923 scopus 로고    scopus 로고
    • Job-shop scheduling theory: What is relevant?
    • K.N. McKay, F.R. Safayeni & J.A. Buzacott (1998): Job-shop scheduling theory: What is relevant? Interfaces 18(4), pp. 84-90.
    • (1998) Interfaces , vol.18 , Issue.4 , pp. 84-90
    • McKay, K.N.1    Safayeni, F.R.2    Buzacott, J.A.3
  • 15
    • 0001008727 scopus 로고    scopus 로고
    • Unifying the Theory and Practice of Production Scheduling
    • K.N. McKay & V.C.S.Wiers (1999): Unifying the Theory and Practice of Production Scheduling. Journal of Manufacturing Systems 18(4), pp. 241-255.
    • (1999) Journal of Manufacturing Systems , vol.18 , Issue.4 , pp. 241-255
    • McKay, K.N.1    Wiers, V.C.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.