Volumn 60, Issue 9-12, 2012, Pages 1099-1110

Scheduling identical parallel machines with machine eligibility restrictions to minimize total weighted flowtime in automobile gear manufacturing

Author keywords

Heuristic algorithms; Mathematical model; Parallel machines; Scheduling

Indexed keywords

BOTTLENECK OPERATIONS; COMPUTATIONAL ANALYSIS; COMPUTATIONAL EXPERIMENT; COMPUTATIONAL TIME; GEAR MANUFACTURING; IDENTICAL PARALLEL MACHINES; LARGE SIZES; MACHINE ELIGIBILITY RESTRICTIONS; NP-HARD; OPTIMAL SOLUTIONS; PARALLEL MACHINE; PRE-HEAT TREATMENT; PROBLEM INSTANCES; RELEASE TIME; SCHEDULING PROBLEM; SEQUENCE-DEPENDENT SETUP TIME; WEIGHTED FLOWTIME;

EID: 84861703325     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-011-3653-3     Document Type: Article
Times cited : (40)

References (34)
  • 1
    • 0033114757 scopus 로고    scopus 로고
    • A review of scheduling research involving setup considerations
    • Allahverdi A, Gupta JND, Aldowaisan T (1999) A review of scheduling research involving setup considerations. Omega 27 (2):219-239
    • (1999) Omega , vol.27 , Issue.2 , pp. 219-239
    • Allahverdi, A.1    Gupta, J.N.D.2    Aldowaisan, T.3
  • 3
    • 34047181001 scopus 로고    scopus 로고
    • Parallel machine total tardiness scheduling with a new hybrid metaheuristic approach
    • DOI 10.1016/j.cor.2006.02.009, PII S0305054806000463
    • Anghinolfi D, Paolucci M (2007) Parallel machine total tardiness scheduling with a new hybrid metaheuristic approach. Comput Oper Res 34(11):3471-3490 (Pubitemid 46517867)
    • (2007) Computers and Operations Research , vol.34 , Issue.11 , pp. 3471-3490
    • Anghinolfi, D.1    Paolucci, M.2
  • 4
    • 34249066737 scopus 로고    scopus 로고
    • Minimizing total tardiness in parallel machine scheduling with setup times: An adaptive memory-based GRASP approach
    • DOI 10.1016/j.ejor.2006.09.077, PII S0377221706010204
    • Armentano VA, Filho MFF (2007) Minimizing total tardiness in parallel machine scheduling with setup times: an adaptive memory-based GRASP approach. Eur J Oper Res 183(1):100-114 (Pubitemid 46803136)
    • (2007) European Journal of Operational Research , vol.183 , Issue.1 , pp. 100-114
    • Armentano, V.A.1    De Franca Filho, M.F.2
  • 5
    • 0033079828 scopus 로고    scopus 로고
    • Early/tardy scheduling with sequence dependent setups on uniform parallel machines
    • DOI 10.1016/S0305-0548(98)00051-3, PII S0305054898000513
    • Balakrishnan N, Kanet JJ, Sridhiran SV (1999) Early/tardy scheduling with sequence dependent setups on uniform parallel machines. Comput Oper Res 26(2):127-141 (Pubitemid 29346480)
    • (1999) Computers and Operations Research , vol.26 , Issue.2 , pp. 127-141
    • Balakrishnan, N.1    Kanet, J.J.2    Sridharan, S.V.3
  • 6
    • 0347092029 scopus 로고    scopus 로고
    • A tabu search algorithm for parallel machine total tardiness problem
    • DOI 10.1016/S0305-0548(02)00198-3
    • Bilge Ü, Kiraç F, Kurtulan M, Pekgün P (2004) A tabu search algorithm for parallel machine total tardiness problem. Comput Oper Res 31(3):397-414 (Pubitemid 38092934)
    • (2004) Computers and Operations Research , vol.31 , Issue.3 , pp. 397-414
    • Bilge, U.1    Kirac, F.2    Kurtulan, M.3    Pekgun, P.4
  • 7
    • 55949093907 scopus 로고    scopus 로고
    • Manufacturing of cylindrical gears by generating cutting process: A critical synthesis of analysis methods
    • Bouzakis KD, Lili E, Michailidis N, Friderikos O (2008) Manufacturing of cylindrical gears by generating cutting process: a critical synthesis of analysis methods. CIRP Annals-Manuf Tech 57(2):676-696
    • (2008) CIRP Annals-Manuf Tech , vol.57 , Issue.2 , pp. 676-696
    • Bouzakis, K.D.1    Lili, E.2    Michailidis, N.3    Friderikos, O.4
  • 8
    • 0025474221 scopus 로고
    • A state-of-the-art review of parallelmachine scheduling research
    • Cheng TCE, Sin CCE (1990) A state-of-the-art review of parallelmachine scheduling research. Eur J Oper Res 47(3):271-292
    • (1990) Eur J Oper Res , vol.47 , Issue.3 , pp. 271-292
    • Cheng, T.C.E.1    Sin, C.C.E.2
  • 10
    • 79952663251 scopus 로고    scopus 로고
    • Heuristic algorithms for scheduling of a batch processor in automobile gear manufacturing
    • Gokhale R, Mathirajan M (2011) Heuristic algorithms for scheduling of a batch processor in automobile gear manufacturing. Int J Prod Res 49(10):2705-2728
    • (2011) Int J Prod Res , vol.49 , Issue.10 , pp. 2705-2728
    • Gokhale, R.1    Mathirajan, M.2
  • 11
    • 0018444748 scopus 로고
    • Interval estimation of a global optimum for large combinatorial problems
    • Golden BL, Alt FB (1979) Interval estimation of a global optimum for large combinatorial problems. Nav Res Logist Q 26 (1):69-77
    • (1979) Nav Res Logist Q , vol.26 , Issue.1 , pp. 69-77
    • Golden, B.L.1    Alt, F.B.2
  • 12
    • 74849101820 scopus 로고
    • Optimization and approximation in deterministic sequencing and scheduling: A survey
    • Graham RL, Lawler EL, Lenstra JK, Rinnooy Kan AHG (1979) Optimization and approximation in deterministic sequencing and scheduling: a survey. Ann Discrete Math 5(4):287-326
    • (1979) Ann Discrete Math , vol.5 , Issue.4 , pp. 287-326
    • Graham, R.L.1    Lawler, E.L.2    Lenstra, J.K.3    Rinnooy Kan, A.H.G.4
  • 13
    • 0032095739 scopus 로고    scopus 로고
    • Minimizing the sum of job earliness and tardiness in a multimachine system
    • Heady RB, Zhu Z (1998) Minimizing the sum of job earliness and tardiness in a multimachine system. Int J Prod Res 36(6):1619-1632 (Pubitemid 128553216)
    • (1998) International Journal of Production Research , vol.36 , Issue.6 , pp. 1619-1632
    • Heady, R.B.1    Zhu, Z.2
  • 14
    • 77949469644 scopus 로고    scopus 로고
    • Parallel machine scheduling with common due windows
    • Huang RH, Yang CL, Huang HT (2010) Parallel machine scheduling with common due windows. J Oper Res Soc 61 (4):640-646
    • (2010) J Oper Res Soc , vol.61 , Issue.4 , pp. 640-646
    • Huang, R.H.1    Yang, C.L.2    Huang, H.T.3
  • 15
    • 21144480574 scopus 로고
    • Improving delivery performance in gear manufacturing at Jeffrey Division of Dresser Industries
    • Hutchison J, Keong Leong G, Ward PT (1993) Improving delivery performance in gear manufacturing at Jeffrey Division of Dresser Industries. Interfaces 23(2):69-79
    • (1993) Interfaces , vol.23 , Issue.2 , pp. 69-79
    • Hutchison, J.1    Keong Leong, G.2    Ward, P.T.3
  • 16
    • 0142216509 scopus 로고    scopus 로고
    • Scheduling jobs on parallel machines: A restricted tabu search approach
    • Kim CO, Shin HJ (2003) Scheduling jobs on parallel machines: a restricted tabu search approach. Int J Adv Manuf Technol 22(3-4):278-287
    • (2003) Int J Adv Manuf Technol , vol.22 , Issue.3-4 , pp. 278-287
    • Kim, C.O.1    Shin, H.J.2
  • 18
    • 60749088380 scopus 로고    scopus 로고
    • A note on unrelated parallel machine scheduling with time-dependent processing times
    • Kuo W-H, Hsu C-J, Yang D-L (2009) A note on unrelated parallel machine scheduling with time-dependent processing times. J Oper Res Soc 60(3):431-434
    • (2009) J Oper Res Soc , vol.60 , Issue.3 , pp. 431-434
    • Kuo, W.-H.1    Hsu, C.-J.2    Yang, D.-L.3
  • 19
    • 0035841877 scopus 로고    scopus 로고
    • Heuristic scheduling of parallel machines with sequence-dependent set-up times
    • DOI 10.1080/00207540110064938
    • Kurz ME, Askin RG (2001) Heuristic scheduling of parallel machines with sequence-dependent set-up times. Int J Prod Res 39 (16):3747-3769 (Pubitemid 35165511)
    • (2001) International Journal of Production Research , vol.39 , Issue.16 , pp. 3747-3769
    • Kurz, M.E.1    Askin, R.G.2
  • 21
    • 1142268165 scopus 로고    scopus 로고
    • Bottleneck-focused scheduling for a hybrid flowshop
    • Lee G-C, Kim Y-D, Choi S-W (2004) Bottleneck-focused scheduling for a hybrid flowshop. Int J Prod Res 42(1):165-181
    • (2004) Int J Prod Res , vol.42 , Issue.1 , pp. 165-181
    • Lee, G.-C.1    Kim, Y.-D.2    Choi, S.-W.3
  • 22
    • 34047130624 scopus 로고    scopus 로고
    • Scheduling unrelated parallel machines with sequence-dependent setups
    • DOI 10.1016/j.cor.2006.02.006, PII S0305054806000438
    • Logendran R, McDonell B, Smucker B (2007) Scheduling unrelated parallel machines with sequence-dependent setups. Comput Oper Res 34(11):3420-3438 (Pubitemid 46517865)
    • (2007) Computers and Operations Research , vol.34 , Issue.11 , pp. 3420-3438
    • Logendran, R.1    McDonell, B.2    Smucker, B.3
  • 23
    • 33646200244 scopus 로고    scopus 로고
    • Minimizing total weighted tardiness on heterogeneous batch processing machines with incompatible job families
    • Mathirajan M, Sivakumar AI (2006) Minimizing total weighted tardiness on heterogeneous batch processing machines with incompatible job families. Int J Adv Manuf Technol 28(9-10):1038-1047
    • (2006) Int J Adv Manuf Technol , vol.28 , Issue.9-10 , pp. 1038-1047
    • Mathirajan, M.1    Sivakumar, A.I.2
  • 25
    • 0029404198 scopus 로고
    • Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times
    • Ovacik IM, Uzsoy R (1995) Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times. Int J Prod Res 33(11):3173-3192
    • (1995) Int J Prod Res , vol.33 , Issue.11 , pp. 3173-3192
    • Ovacik, I.M.1    Uzsoy, R.2
  • 26
    • 0031382706 scopus 로고    scopus 로고
    • Advanced manufacturing system for automotive components production
    • Pelagagge PM (1997) Advanced manufacturing system for automotive components production. Ind Manag Data Syst 97 (8):327-334 (Pubitemid 127489206)
    • (1997) Industrial Management and Data Systems , vol.97 , Issue.8 , pp. 327-334
    • Pelagagge, P.M.1
  • 27
    • 41449109607 scopus 로고    scopus 로고
    • Scheduling jobs on parallel machines with setup times and ready times
    • DOI 10.1016/j.cie.2007.08.011, PII S036083520700229X
    • Pfund M, Fowler JW, Gadkari A, Chen Y (2008) Scheduling jobs on parallel machines with setup times and ready times. Comput Ind Eng 54(4):764-782 (Pubitemid 351458378)
    • (2008) Computers and Industrial Engineering , vol.54 , Issue.4 , pp. 764-782
    • Pfund, M.1    Fowler, J.W.2    Gadkari, A.3    Chen, Y.4
  • 28
    • 33750318951 scopus 로고    scopus 로고
    • Application of virtual manufacturing in generation of gears
    • DOI 10.1007/s00170-005-0170-2
    • Pohit G (2006) Application of virtual manufacturing in generation of gears. Int J Adv Manuf Technol 31(1-2):85-91 (Pubitemid 44631985)
    • (2006) International Journal of Advanced Manufacturing Technology , vol.31 , Issue.1-2 , pp. 85-91
    • Pohit, G.1
  • 29
    • 30844470431 scopus 로고    scopus 로고
    • Heuristics for the unrelated parallel machine scheduling problem with setup times
    • DOI 10.1007/s10845-005-5514-0
    • Rabadi G, Moraga RJ, Al-Salem A (2006) Heuristics for the unrelated parallel machine scheduling problem with setup times. J Intell Manuf 17(1):85-97 (Pubitemid 43107327)
    • (2006) Journal of Intelligent Manufacturing , vol.17 , Issue.1 , pp. 85-97
    • Rabadi, G.1    Moraga, R.J.2    Al-Salem, A.3
  • 30
    • 0035335852 scopus 로고    scopus 로고
    • Experimental evaluation of heuristic optimization algorithms: A tutorial
    • DOI 10.1023/A:1011319115230
    • Rardin RL, Uzsoy R (2001) Experimental evaluation of heuristic optimization algorithms: a tutorial. J Heuristics 7(3):261-304 (Pubitemid 32517559)
    • (2001) Journal of Heuristics , vol.7 , Issue.3 , pp. 261-304
    • Rardin, R.L.1    Uzsoy, R.2
  • 31
    • 0033166361 scopus 로고    scopus 로고
    • Parallel machine scheduling with earliness and tardiness penalties
    • DOI 10.1016/S0305-0548(98)00090-2, PII S0305054898000902
    • Sivrikaya-Şerifoglu F, Ulusoy G (1999) Parallel machine scheduling with earliness and tardiness penalties. Comput Oper Res 26 (8):773-787 (Pubitemid 29351336)
    • (1999) Computers and Operations Research , vol.26 , Issue.8 , pp. 773-787
    • Sivrikaya-Srifoglu, F.1    Ulusoy, G.2
  • 32
    • 0037464639 scopus 로고    scopus 로고
    • Static scheduling research to minimize weighted and unweighted tardiness: A state-of-the-art survey
    • Sen T, Sulek JM, Dileepan P (2003) Static scheduling research to minimize weighted and unweighted tardiness: a state-of-the-art survey. Int J Prod Econ 83(1):1-12
    • (2003) Int J Prod Econ , vol.83 , Issue.1 , pp. 1-12
    • Sen, T.1    Sulek, J.M.2    Dileepan, P.3
  • 33
    • 33846885666 scopus 로고    scopus 로고
    • Minimizing total tardiness in an unrelated parallel-machine scheduling problem
    • DOI 10.1057/palgrave.jors.2602141, PII 2602141
    • Shim S-O, Kim Y-D (2007) Minimizing total tardiness in an unrelated parallel-machine scheduling problem. J Oper Res Soc 58(3):346-354 (Pubitemid 46221052)
    • (2007) Journal of the Operational Research Society , vol.58 , Issue.3 , pp. 346-354
    • Shim, S.-O.1    Kim, Y.-D.2
  • 34
    • 13644282519 scopus 로고    scopus 로고
    • Scheduling with product family set-up times: An application in TFT LCD manufacturing
    • DOI 10.1080/00207540410001708461
    • Shin HJ, Leon VJ (2004) Scheduling with product family set-up times: an application in TFT LCD manufacturing. Int J Prod Res 42(20):4235-4248 (Pubitemid 40232119)
    • (2004) International Journal of Production Research , vol.42 , Issue.20 , pp. 4235-4248
    • Shin, H.J.1    Leon, V.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.