1
-
-
0034244118
-
Optimal response of a thermal unit to an electricity spot market
-
Arroyo J.M., Conejo A.J. Optimal response of a thermal unit to an electricity spot market. IEEE Trans Power Syst 2000, 15:1098-1104.
-
(2000)
IEEE Trans Power Syst
, vol.15
, pp. 1098-1104
-
-
Arroyo, J.M.1
Conejo, A.J.2
-
2
-
-
0030750056
-
Equity and efficiency of unit commitment in competitive electricity markets
-
Johnson J.B., Oren S.S., Svoboda A.J. Equity and efficiency of unit commitment in competitive electricity markets. Utilities Policy 1997, 6:9-19.
-
(1997)
Utilities Policy
, vol.6
, pp. 9-19
-
-
Johnson, J.B.1
Oren, S.S.2
Svoboda, A.J.3
-
3
-
-
28244479344
-
Price-based unit commitment: a case of Lagrangian relaxation versus mixed integer programming
-
Li T., Shahidehpour M. Price-based unit commitment: a case of Lagrangian relaxation versus mixed integer programming. IEEE Trans Power Syst 2005, 20:2015-2025.
-
(2005)
IEEE Trans Power Syst
, vol.20
, pp. 2015-2025
-
-
Li, T.1
Shahidehpour, M.2
-
5
-
-
2542598480
-
Unit Commitment - a bibliographical survey
-
Padhy N.P. Unit Commitment - a bibliographical survey. IEEE Trans Power Syst 2004, 19:1196-1205.
-
(2004)
IEEE Trans Power Syst
, vol.19
, pp. 1196-1205
-
-
Padhy, N.P.1
-
6
-
-
28244453699
-
The conditions for obtaining feasible solutions to security-constrained unit commitment problems
-
Guan X.H., Guo S.G. The conditions for obtaining feasible solutions to security-constrained unit commitment problems. IEEE Trans Power Syst 2005, 20:1746-1756.
-
(2005)
IEEE Trans Power Syst
, vol.20
, pp. 1746-1756
-
-
Guan, X.H.1
Guo, S.G.2
-
7
-
-
2542640865
-
A solution to the unit-commitment problem using integer-coded genetic algorithm
-
Damousis I.G., Bakirtzis A.G., Dokopoulos P.S. A solution to the unit-commitment problem using integer-coded genetic algorithm. IEEE Trans Power Syst 2004, 19:1165-1172.
-
(2004)
IEEE Trans Power Syst
, vol.19
, pp. 1165-1172
-
-
Damousis, I.G.1
Bakirtzis, A.G.2
Dokopoulos, P.S.3
-
8
-
-
0038519486
-
A fast technique for unit commitment problem by extended priority list
-
Senjyu T., Shimabukuro K., Uezato K., Funabashi T. A fast technique for unit commitment problem by extended priority list. IEEE Trans Power Syst 2003, 18:882-888.
-
(2003)
IEEE Trans Power Syst
, vol.18
, pp. 882-888
-
-
Senjyu, T.1
Shimabukuro, K.2
Uezato, K.3
Funabashi, T.4
-
9
-
-
0033222003
-
An evolutionary programming solution to the unit commitment problem
-
Juste K.A., Kita H., Tanaka E., Hasegawa J. An evolutionary programming solution to the unit commitment problem. IEEE Trans Power Syst 1999, 14:1452-1459.
-
(1999)
IEEE Trans Power Syst
, vol.14
, pp. 1452-1459
-
-
Juste, K.A.1
Kita, H.2
Tanaka, E.3
Hasegawa, J.4
-
10
-
-
33747623533
-
A computationally efficient mixed-integer linear formulation for the thermal unit commitment problem
-
Carrion M., Arroyo J.M. A computationally efficient mixed-integer linear formulation for the thermal unit commitment problem. IEEE Trans Power Syst 2006, 21:1371-1378.
-
(2006)
IEEE Trans Power Syst
, vol.21
, pp. 1371-1378
-
-
Carrion, M.1
Arroyo, J.M.2
-
11
-
-
0029252684
-
Generalized unit commitment problem
-
Baldick R. Generalized unit commitment problem. IEEE Trans Power Syst 1995, 10:465-473.
-
(1995)
IEEE Trans Power Syst
, vol.10
, pp. 465-473
-
-
Baldick, R.1
-
12
-
-
0032640594
-
Unit commitment with transmission security and voltage constraints
-
Ma H.L., Shahidehpour S.M. Unit commitment with transmission security and voltage constraints. IEEE Trans Power Syst 1999, 14:757-764.
-
(1999)
IEEE Trans Power Syst
, vol.14
, pp. 757-764
-
-
Ma, H.L.1
Shahidehpour, S.M.2
-
13
-
-
0029356616
-
Short-term generation scheduling with transmission and environmental constraints using augmented Lagrangian relaxation
-
Wang S.J., Shahidepour S.M. Short-term generation scheduling with transmission and environmental constraints using augmented Lagrangian relaxation. IEEE Trans Power Syst 1995, 10:1294-1301.
-
(1995)
IEEE Trans Power Syst
, vol.10
, pp. 1294-1301
-
-
Wang, S.J.1
Shahidepour, S.M.2
-
14
-
-
0029356615
-
A direct method for security-constrained unit commitment
-
Shaw J.J. A direct method for security-constrained unit commitment. IEEE Trans Power Syst 1995, 10:1329-1342.
-
(1995)
IEEE Trans Power Syst
, vol.10
, pp. 1329-1342
-
-
Shaw, J.J.1
-
15
-
-
33646379100
-
AC contingency dispatch based on security-constrained unit commitment
-
Fu Y., Shahidehpour M. AC contingency dispatch based on security-constrained unit commitment. IEEE Trans Power Syst 2006, 21:897-908.
-
(2006)
IEEE Trans Power Syst
, vol.21
, pp. 897-908
-
-
Fu, Y.1
Shahidehpour, M.2
-
16
-
-
0027647348
-
Effects of ramp-rate limits on unit commitment and economic dispatch
-
Wang C., Shahidehpour S.M. Effects of ramp-rate limits on unit commitment and economic dispatch. IEEE Trans Power Syst 1993, 8:1341-1350.
-
(1993)
IEEE Trans Power Syst
, vol.8
, pp. 1341-1350
-
-
Wang, C.1
Shahidehpour, S.M.2
-
17
-
-
0032637159
-
Revenue adequate bidding strategies in competitive electricity markets
-
Li C., Svoboda A., Guan X., Singh H. Revenue adequate bidding strategies in competitive electricity markets. IEEE Trans Power Syst 1999, 14:492-497.
-
(1999)
IEEE Trans Power Syst
, vol.14
, pp. 492-497
-
-
Li, C.1
Svoboda, A.2
Guan, X.3
Singh, H.4
-
18
-
-
0034427822
-
Energy delivery capacity and generation scheduling in the deregulated electric power market
-
Guan X., Gao F., Svoboda A. Energy delivery capacity and generation scheduling in the deregulated electric power market. IEEE Trans Power Syst 2000, 15:1275-1280.
-
(2000)
IEEE Trans Power Syst
, vol.15
, pp. 1275-1280
-
-
Guan, X.1
Gao, F.2
Svoboda, A.3
-
20
-
-
75749129453
-
Optimization based scheduling for a class of production systems with integer constraints
-
Guan X., Zhai Q., Feng Y., Gao F. Optimization based scheduling for a class of production systems with integer constraints. Sci China Ser E - Technol Sci 2009, 52:3533-3544.
-
(2009)
Sci China Ser E - Technol Sci
, vol.52
, pp. 3533-3544
-
-
Guan, X.1
Zhai, Q.2
Feng, Y.3
Gao, F.4
-
22
-
-
32144453660
-
A novel approach for unit commitment problem via an effective hybrid particle swarm optimization
-
Ting T.O., Rao M.V.C., Loo C.K. A novel approach for unit commitment problem via an effective hybrid particle swarm optimization. IEEE Trans Power Syst 2006, 21:411-418.
-
(2006)
IEEE Trans Power Syst
, vol.21
, pp. 411-418
-
-
Ting, T.O.1
Rao, M.V.C.2
Loo, C.K.3
-
23
-
-
79955528582
-
An advanced quantum-inspired evolutionary algorithm for unit commitment
-
Chung C.Y., Han Y., Wong K.P. An advanced quantum-inspired evolutionary algorithm for unit commitment. IEEE Trans Power Syst 2011, 26:847-854.
-
(2011)
IEEE Trans Power Syst
, vol.26
, pp. 847-854
-
-
Chung, C.Y.1
Han, Y.2
Wong, K.P.3
-
24
-
-
67650510211
-
Research on the model and algorithms for hydrothermal scheduling
-
PhD dissertation, [in Chinese].
-
Zhai Q. Research on the model and algorithms for hydrothermal scheduling. PhD dissertation, Xi'an Jiaotong University, Xi'an; 2005 [in Chinese].
-
(2005)
Xi'an Jiaotong University, Xi'an
-
-
Zhai, Q.1
-
25
-
-
0030082567
-
A generic algorithm solution to the Unit Commitment problem
-
Kazarlis S.A., Bakirtzis A.G. A generic algorithm solution to the Unit Commitment problem. IEEE Trans Power Syst 1996, 11:83-92.
-
(1996)
IEEE Trans Power Syst
, vol.11
, pp. 83-92
-
-
Kazarlis, S.A.1
Bakirtzis, A.G.2
-
26
-
-
84881330453
-
-
US Eastern Wind dataset. National Renewable Energy Laboratory. <>
-
US Eastern Wind dataset. National Renewable Energy Laboratory. <>; 2006. http://www.nrel.gov/wind/integrationdatasets/eastern/data.html.
-
(2006)
-
-
-
27
-
-
84881360459
-
-
Potpmac Economics. state of the market report for the MISO electricity markets; 2011. <>.
-
Potpmac Economics. 2010 state of the market report for the MISO electricity markets; 2011. <>. http://www.potomaceconomics.com/markets_monitored/midwest_iso.
-
(2010)
-
-
|