-
1
-
-
3042755044
-
How useful is quantitative risk assessment?
-
DOI 10.1111/j.0272-4332.2004.00455.x
-
Apostolakis, G. 2004. How useful is Quantitative Risk Assessement?, Risk Analysis 24(3): 515-520. (Pubitemid 38857623)
-
(2004)
Risk Analysis
, vol.24
, Issue.3
, pp. 515-520
-
-
Apostolakis, G.E.1
-
2
-
-
84861699637
-
Risk analysis of six potentially hazardous industrial objects in the rijnmond area, A pilot study
-
Dordrecht
-
COVO Report. 1982. Risk Analysis of Six Potentially Hazardous Industrial Objects in the Rijnmond Area, A Pilot Study, Reidel Publ. Co, Dordrecht.
-
(1982)
COVO Report. Reidel Publ. Co
-
-
-
3
-
-
84865563921
-
Directive on minimum safety requirements for tunnels in the trans-European road network
-
EC, (30.4.2004
-
EC, 2004. Directive on minimum safety requirements for tunnels in the trans-European road network, Official Journal of the European Union, L 167 (30.4.2004).
-
(2004)
Official Journal of the European Union
, vol.L 167
-
-
-
4
-
-
84861710275
-
Transport of dangerous goods through road tunnels quantitative risk assessment model
-
INERIS, Verneuil-en-Halatte, France, (v. 3.60 and v. 3.61)
-
INERIS. 2005. Transport of Dangerous goods through road tunnels Quantitative Risk Assessment Model (v. 3.60 and v. 3.61) Reference Manual, Verneuil-en-Halatte, France.
-
(2005)
Reference Manual
-
-
-
5
-
-
23644434375
-
Actual time tunnel safety - A new approach
-
Khoury, G.A. and Molag, M. 2005. Actual time tunnel safety-A new approach, Tunnels and Tunelling International 37(7): 46-48. (Pubitemid 41131284)
-
(2005)
Tunnels and Tunnelling International
, vol.37
, Issue.7
, pp. 46-48
-
-
Khoury, G.A.1
Molag, M.2
-
7
-
-
33646897691
-
Risk management for SMEs: Tools to use and how
-
DOI 10.1080/09537280500285136, PII X1756512671
-
Leopoulos, V., Kirytopoulos, K. and Malandrakis, C. 2006. Risk management for SMEs: Tools to use and how, Production Planning and Control 17(3): 322-332. (Pubitemid 43791645)
-
(2006)
Production Planning and Control
, vol.17
, Issue.3
, pp. 322-332
-
-
Leopoulos, V.N.1
Kirytopoulos, K.A.2
Malandrakis, C.3
-
11
-
-
77954146288
-
-
PIARC., World Road Association (PIARC), France
-
PIARC. 2008. Risk analysis for road tunnels, World Road Association (PIARC), France.
-
(2008)
Risk Analysis for Road Tunnels
-
-
-
12
-
-
0003673417
-
-
Nuclear Regulatory Commission Document WASH-1400, NUREG 75/014
-
Rasmussen, N.C. 1975. Reactor Safety Study, Nuclear Regulatory Commission Document WASH-1400, NUREG 75/014.
-
(1975)
Reactor Safety Study
-
-
Rasmussen, N.C.1
-
13
-
-
34848848718
-
Incorporating uncertainty in optimal investment decisions
-
Rentizelas, A., Tziralis, G. and Kirytopoulos, K. 2007. Incorporating uncertainty in optimal investment decisions, World Review of Entrepreneurship, Management and Sustainable Development 3(3-4): 273-283.
-
(2007)
World Review of Entrepreneurship, Management and Sustainable Development
, vol.3
, Issue.3-4
, pp. 273-283
-
-
Rentizelas, A.1
Tziralis, G.2
Kirytopoulos, K.3
-
14
-
-
84861687004
-
Appendix 1: Tools for probabilistic risk assessment
-
SAFE-T
-
SAFE-T. 2008. Appendix 1: Tools for Probabilistic risk assessment, SAFE-T research project report.
-
(2008)
SAFE-T Research Project Report
-
-
-
15
-
-
69249152565
-
Holistic investment assessment: Optimization, risk appraisal and decision making
-
Tziralis, G., Kirytopoulos, K., Rentizelas, A. and Tatsiopoulos, I. 2009. Holistic investment assessment: Optimization, risk appraisal and decision making, Managerial and Decision Economics 30(6): 393-403.
-
(2009)
Managerial and Decision Economics
, vol.30
, Issue.6
, pp. 393-403
-
-
Tziralis, G.1
Kirytopoulos, K.2
Rentizelas, A.3
Tatsiopoulos, I.4
|