메뉴 건너뛰기




Volumn , Issue , 2010, Pages 167-172

Quantitative operational risk analysis for dangerous goods transportation through cut and cover road tunnels

Author keywords

[No Author keywords available]

Indexed keywords

COVER TUNNELS; DANGEROUS GOODS; DANGEROUS GOODS TRANSPORTATIONS; OPERATIONAL RISKS; QRA MODEL; QUANTITATIVE RISK ANALYSIS; RESEARCH QUESTIONS; ROAD TUNNEL; SYSTEMIC APPROACH;

EID: 84861658770     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (4)

References (15)
  • 1
    • 3042755044 scopus 로고    scopus 로고
    • How useful is quantitative risk assessment?
    • DOI 10.1111/j.0272-4332.2004.00455.x
    • Apostolakis, G. 2004. How useful is Quantitative Risk Assessement?, Risk Analysis 24(3): 515-520. (Pubitemid 38857623)
    • (2004) Risk Analysis , vol.24 , Issue.3 , pp. 515-520
    • Apostolakis, G.E.1
  • 2
    • 84861699637 scopus 로고
    • Risk analysis of six potentially hazardous industrial objects in the rijnmond area, A pilot study
    • Dordrecht
    • COVO Report. 1982. Risk Analysis of Six Potentially Hazardous Industrial Objects in the Rijnmond Area, A Pilot Study, Reidel Publ. Co, Dordrecht.
    • (1982) COVO Report. Reidel Publ. Co
  • 3
    • 84865563921 scopus 로고    scopus 로고
    • Directive on minimum safety requirements for tunnels in the trans-European road network
    • EC, (30.4.2004
    • EC, 2004. Directive on minimum safety requirements for tunnels in the trans-European road network, Official Journal of the European Union, L 167 (30.4.2004).
    • (2004) Official Journal of the European Union , vol.L 167
  • 4
    • 84861710275 scopus 로고    scopus 로고
    • Transport of dangerous goods through road tunnels quantitative risk assessment model
    • INERIS, Verneuil-en-Halatte, France, (v. 3.60 and v. 3.61)
    • INERIS. 2005. Transport of Dangerous goods through road tunnels Quantitative Risk Assessment Model (v. 3.60 and v. 3.61) Reference Manual, Verneuil-en-Halatte, France.
    • (2005) Reference Manual
  • 5
    • 23644434375 scopus 로고    scopus 로고
    • Actual time tunnel safety - A new approach
    • Khoury, G.A. and Molag, M. 2005. Actual time tunnel safety-A new approach, Tunnels and Tunelling International 37(7): 46-48. (Pubitemid 41131284)
    • (2005) Tunnels and Tunnelling International , vol.37 , Issue.7 , pp. 46-48
    • Khoury, G.A.1    Molag, M.2
  • 7
    • 33646897691 scopus 로고    scopus 로고
    • Risk management for SMEs: Tools to use and how
    • DOI 10.1080/09537280500285136, PII X1756512671
    • Leopoulos, V., Kirytopoulos, K. and Malandrakis, C. 2006. Risk management for SMEs: Tools to use and how, Production Planning and Control 17(3): 322-332. (Pubitemid 43791645)
    • (2006) Production Planning and Control , vol.17 , Issue.3 , pp. 322-332
    • Leopoulos, V.N.1    Kirytopoulos, K.A.2    Malandrakis, C.3
  • 10
  • 11
    • 77954146288 scopus 로고    scopus 로고
    • PIARC., World Road Association (PIARC), France
    • PIARC. 2008. Risk analysis for road tunnels, World Road Association (PIARC), France.
    • (2008) Risk Analysis for Road Tunnels
  • 12
    • 0003673417 scopus 로고
    • Nuclear Regulatory Commission Document WASH-1400, NUREG 75/014
    • Rasmussen, N.C. 1975. Reactor Safety Study, Nuclear Regulatory Commission Document WASH-1400, NUREG 75/014.
    • (1975) Reactor Safety Study
    • Rasmussen, N.C.1
  • 14
    • 84861687004 scopus 로고    scopus 로고
    • Appendix 1: Tools for probabilistic risk assessment
    • SAFE-T
    • SAFE-T. 2008. Appendix 1: Tools for Probabilistic risk assessment, SAFE-T research project report.
    • (2008) SAFE-T Research Project Report


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.