-
1
-
-
49849094402
-
A summary of demand response in electricity markets
-
Albadi M.H., El-Saadany E.F. A summary of demand response in electricity markets. Electr Power Syst Res 2008, 78:1989-1996.
-
(2008)
Electr Power Syst Res
, vol.78
, pp. 1989-1996
-
-
Albadi, M.H.1
El-Saadany, E.F.2
-
2
-
-
0034186763
-
An factoring the elasticity of demand in electricity prices
-
Kirschen Daniel S., Strbac Goran, Cumperayot Pariya, Mendes Dilemar de Paiva An factoring the elasticity of demand in electricity prices. IEEE Trans Power Syst 2000, 15:612-617.
-
(2000)
IEEE Trans Power Syst
, vol.15
, pp. 612-617
-
-
Kirschen, D.S.1
Strbac, G.2
Cumperayot, P.3
Mendes, D.D.P.4
-
3
-
-
33947424407
-
The demand elasticity impacts on the strategic bidding behavior of the electricity producers
-
Bompard E., Ma Y., Napoli R., Abrate G. The demand elasticity impacts on the strategic bidding behavior of the electricity producers. IEEE Trans Power Syst 2007, 22:188-197.
-
(2007)
IEEE Trans Power Syst
, vol.22
, pp. 188-197
-
-
Bompard, E.1
Ma, Y.2
Napoli, R.3
Abrate, G.4
-
4
-
-
19944391385
-
Technique to evaluate nodal reliability indices and nodal prices of restructured power systems
-
Wang P., Ding Y., Xiao Y. Technique to evaluate nodal reliability indices and nodal prices of restructured power systems. IEE Proc Gener Transm Distrib 2005, 152:390-396.
-
(2005)
IEE Proc Gener Transm Distrib
, vol.152
, pp. 390-396
-
-
Wang, P.1
Ding, Y.2
Xiao, Y.3
-
5
-
-
35348867511
-
Reliability enhancement of a deregulated power system considering demand response
-
Goel L., Qiuwei Wu, Peng Wang Reliability enhancement of a deregulated power system considering demand response. IEEE Meet Power Eng Soc General Meet 2006, 6.
-
(2006)
IEEE Meet Power Eng Soc General Meet
, pp. 6
-
-
Goel, L.1
Qiuwei, W.2
Peng, W.3
-
7
-
-
68349141645
-
Quantifying the effect of demand response on electricity markets
-
Chua-Liang Su, Kirschen D. Quantifying the effect of demand response on electricity markets. IEEE Trans Power Syst 2009, 24:1199-1207.
-
(2009)
IEEE Trans Power Syst
, vol.24
, pp. 1199-1207
-
-
Chua-Liang, S.1
Kirschen, D.2
-
8
-
-
77957814044
-
Methods for customer and demand response policies selection in new electricity markets
-
Valero S., Ortiz M., Senabre C., Alvarez C., Franco F.J.G., Gabaldon A. Methods for customer and demand response policies selection in new electricity markets. IET Gener Transm Distrib 2007, 1:104-110.
-
(2007)
IET Gener Transm Distrib
, vol.1
, pp. 104-110
-
-
Valero, S.1
Ortiz, M.2
Senabre, C.3
Alvarez, C.4
Franco, F.J.G.5
Gabaldon, A.6
-
10
-
-
33846786720
-
Optimal pricing of default customers in electrical distribution systems: effect behavior performance of demand response models
-
Yustaa J.M., Khodrb H.M., Urdanetab A.J. Optimal pricing of default customers in electrical distribution systems: effect behavior performance of demand response models. Electr Power Syst Res 2007, 77:4486-4558.
-
(2007)
Electr Power Syst Res
, vol.77
, pp. 4486-4558
-
-
Yustaa, J.M.1
Khodrb, H.M.2
Urdanetab, A.J.3
-
11
-
-
85021249174
-
-
NYISO Day-Ahead Demand Reduction Program Manual. <>.
-
NYISO Day-Ahead Demand Reduction Program Manual. <>. http://www.nyiso.com/public/markets_operations/market_data/demand_response.
-
-
-
-
12
-
-
85021229682
-
-
NYISO Emergency Demand Reduction Program Manual. <>.
-
NYISO Emergency Demand Reduction Program Manual. <>. http://www.nyiso.com/public/markets_operations/market_data/demand_response.
-
-
-
-
15
-
-
0037189704
-
A new method for unit commitment with ramping constraints
-
Fan Wei, Guan Xiaohong, Zhai Qiaozhu A new method for unit commitment with ramping constraints. Electr Power Syst Res 2002, 62:215-224.
-
(2002)
Electr Power Syst Res
, vol.62
, pp. 215-224
-
-
Fan, W.1
Guan, X.2
Zhai, Q.3
-
16
-
-
85037929173
-
Application of the ant colony search algorithm to short-term generation scheduling problem of thermal units, 1998
-
August
-
Yu In-Keun, Chou CS, Song YH. Application of the ant colony search algorithm to short-term generation scheduling problem of thermal units, 1998. In: International conference on power system technology proceedings, vol. 1, August; 1998. p. 552-6.
-
(1998)
International conference on power system technology proceedings
, vol.1
, pp. 552-556
-
-
Yu, I.-K.1
Chou, C.S.2
Song, Y.H.3
-
18
-
-
39749190065
-
Short term hydroelectric power system scheduling with wind turbine generators using the multi-pass iteration particle swarm optimization approach
-
Lee Tsung-Ying Short term hydroelectric power system scheduling with wind turbine generators using the multi-pass iteration particle swarm optimization approach. Energy Convers Manage 2008, 49:751-760.
-
(2008)
Energy Convers Manage
, vol.49
, pp. 751-760
-
-
Lee, T.-Y.1
-
19
-
-
0032592961
-
A report prepared by the reliability test system task force of the application of probability methods subcommittee
-
A report prepared by the reliability test system task force of the application of probability methods subcommittee. The IEEE reliability test system-1996. IEEE Trans Power Syst 1999; 14: 1010-20.
-
(1999)
The IEEE reliability test system-1996. IEEE Trans Power Syst
, vol.14
, pp. 1010-1020
-
-
|