Volumn 9780203968918, Issue , 2006, Pages 30-56

Readiness assessment for concurrent engineering in construction

Author keywords

[No Author keywords available]

Indexed keywords

ENGINEERING; INDUSTRIAL ENGINEERING;

EID: 84861051638     PISSN: None     EISSN: None     Source Type: Book    
DOI: 10.4324/9780203968918     Document Type: Chapter
Times cited : (5)

References (39)
  • 5
    • 0033692029 scopus 로고    scopus 로고
    • Improving Product Introduction Through Appropriate Organisation: The Development of the SIMPLOFI Positioning Tool
    • Brookes, N. J., Backhouse, C. J. and Burns, N. D. (2000), Improving Product Introduction Through Appropriate Organisation: The Development of the SIMPLOFI Positioning Tool, Proceedings of the I MECH E Part B Journal of Engineering Manufacture, Vol. 214, No. 5, pp. 339-364.
    • (2000) Proceedings of the I MECH E Part B Journal of Engineering Manufacture , vol.214 , Issue.5 , pp. 339-364
    • Brookes, N.J.1    Backhouse, C.J.2    Burns, N.D.3
  • 6
    • 84919518715 scopus 로고    scopus 로고
    • Concurrent Engineering - The Agenda for Success, Medhat, S. (ed.), Research Studies Press Ltd
    • Brooks, B. M. and Foster, S. G. (1997), Implementing Concurrent Engineering, Concurrent Engineering - The Agenda for Success, Medhat, S. (ed.), Research Studies Press Ltd.
    • (1997) Implementing Concurrent Engineering
    • Brooks, B.M.1    Foster, S.G.2
  • 9
    • 84919506592 scopus 로고
    • Submitted by: CE Research Centre, West Virginia University, October 1992
    • CERC Technical Report (1992), Process Issues in Implementing Concurrent Engineering, Submitted by: CE Research Centre, West Virginia University, October 1992.
    • (1992) Process Issues in Implementing Concurrent Engineering
  • 10
    • 85024223606 scopus 로고    scopus 로고
    • Advances in Concurrent Engineering, Proceedings of 3rd ISPE International Conference on Concurrent Engineering: Research and Applications, University of Toronto, Ontario, Canada, 26-28 August 1996
    • Chen, G. (1996), The Organisational Management Framework for Implementation of Concurrent Engineering In the Chinese Context, Advances in Concurrent Engineering, Proceedings of 3rd ISPE International Conference on Concurrent Engineering: Research and Applications, University of Toronto, Ontario, Canada, 26-28 August 1996, pp. 165-171.
    • (1996) The Organisational Management Framework for Implementation of Concurrent Engineering In the Chinese Context , pp. 165-171
    • Chen, G.1
  • 11
    • 0042652182 scopus 로고    scopus 로고
    • A Readiness Assessment Methodology for Implementing Concurrent Engineering, Advances in Concurrent Engineering
    • University of Toronto, Ontario, Canada, 26-28 August 1996
    • Componation P. J. and Byrd Jr, J. (1996), A Readiness Assessment Methodology for Implementing Concurrent Engineering, Advances in Concurrent Engineering, Proceedings of 3rd ISPE International Conference on Concurrent Engineering: Research and Applications, University of Toronto, Ontario, Canada, 26-28 August 1996, pp. 150-156.
    • (1996) Proceedings of 3rd ISPE International Conference on Concurrent Engineering: Research and Applications , pp. 150-156
    • Componation, P.J.1    Byrd, J.2
  • 12
    • 85032848960 scopus 로고    scopus 로고
    • Web Page of the CONCUR Project
    • CONCUR (1999), Web Page of the CONCUR Project: http://ivope.ivo.fi/concur
    • (1999)
  • 15
    • 84919518714 scopus 로고    scopus 로고
    • Enabling Collaboration for Virtual Construction Project Teams
    • in Concurrent Engineering in Construction, Anumba, C. J. and Evbuomwan, N. F. O. (eds), IStructE, London, 3-4 July 1997
    • Duke, A. K. and Anumba, C. J. (1997), Enabling Collaboration for Virtual Construction Project Teams, in Concurrent Engineering in Construction: Proceedings of 1st International Conference, Anumba, C. J. and Evbuomwan, N. F. O. (eds), IStructE, London, 3-4 July 1997, pp. 163-172.
    • (1997) Proceedings of 1st International Conference , pp. 163-172
    • Duke, A.K.1    Anumba, C.J.2
  • 16
    • 0003732501 scopus 로고    scopus 로고
    • Report of the Construction Task Force on the Scope for Improving the Quality and Efficiency of UK Construction Industry, Department of the Environment, Transport and the Regions, London
    • Egan, J. (1998), Rethinking Construction, Report of the Construction Task Force on the Scope for Improving the Quality and Efficiency of UK Construction Industry, Department of the Environment, Transport and the Regions, London.
    • (1998) Rethinking Construction
    • Egan, J.1
  • 18
    • 27144445827 scopus 로고    scopus 로고
    • Linking Construction Process Improvement to Business Benefit
    • University of Salford, 9-10 March 2000
    • Finnemore, M. and Sarshar, M. (2000), Linking Construction Process Improvement to Business Benefit, Bizarre Fruit 2000 Conference, University of Salford, 9-10 March 2000, pp. 94-106.
    • (2000) Bizarre Fruit 2000 Conference , pp. 94-106
    • Finnemore, M.1    Sarshar, M.2
  • 20
    • 84919518705 scopus 로고    scopus 로고
    • Improving Business Performance in Construction through Integration and Concurrent Engineering
    • Poznan, Poland, 12-13 April 2000, see web site
    • Khalfan, M. M. A. (2000), Improving Business Performance in Construction through Integration and Concurrent Engineering, Business Information Systems 2000 Conference, Poznan, Poland, 12-13 April 2000, see web site: http://www.bis.pozn.com
    • (2000) Business Information Systems 2000 Conference
    • Khalfan, M.M.A.1
  • 21
    • 84919539921 scopus 로고    scopus 로고
    • Readiness Assessment for Concurrent Engineering in Construction
    • University of Salford, UK, 9-10 March 2000
    • Khalfan, M. M. A. and Anumba, C. J. (2000a), Readiness Assessment for Concurrent Engineering in Construction, Bizarre Fruit 2000 Conference, University of Salford, UK, 9-10 March 2000, pp. 42-54.
    • (2000) Bizarre Fruit 2000 Conference , pp. 42-54
    • Khalfan, M.M.A.1    Anumba, C.J.2
  • 23
    • 0009882580 scopus 로고    scopus 로고
    • A Comparative Review of Concurrent Engineering Readiness Assessment Tools and Models
    • Lyon, France, 17-20 July 2000
    • Khalfan, M. M. A. and Anumba, C. J. (2000c), A Comparative Review of Concurrent Engineering Readiness Assessment Tools and Models, Concurrent Engineering 2000 Conference, Lyon, France, 17-20 July 2000, pp. 578-585.
    • (2000) Concurrent Engineering 2000 Conference , pp. 578-585
    • Khalfan, M.M.A.1    Anumba, C.J.2
  • 26
    • 0004178374 scopus 로고
    • Final Report on Joint Review of Procurement and Contractual Agreements in the UK Construction Industry, HMSO, London
    • Latham, M. (1994), Constructing the Team, Final Report on Joint Review of Procurement and Contractual Agreements in the UK Construction Industry, HMSO, London.
    • (1994) Constructing the Team
    • Latham, M.1
  • 30
    • 84919518703 scopus 로고    scopus 로고
    • Concurrent Engineering - The Agenda for Success, Medhat, S. (ed.), Research Studies Press Ltd
    • Paul, J. and Burns, C. (1997), Implementing a Business Process Re-engineering Programme, Concurrent Engineering - The Agenda for Success, Medhat, S. (ed.), Research Studies Press Ltd.
    • (1997) Implementing a Business Process Re-engineering Programme
    • Paul, J.1    Burns, C.2
  • 32
    • 0003804578 scopus 로고    scopus 로고
    • Construction Collaborative Engineering in a Concurrent Multi-actor Environment, in Concurrent Engineering in Construction
    • Anumba, C. J. and Evbuomwan, N. F. O. (eds), IStructE, London, 3-4 July 1997
    • Rezgui, Y., Cooper, G., Yip, J. and Brandon, P. (1997), Construction Collaborative Engineering in a Concurrent Multi-actor Environment, in Concurrent Engineering in Construction: Proceedings of 1st International Conference, Anumba, C. J. and Evbuomwan, N. F. O. (eds), IStructE, London, 3-4 July 1997, pp. 183-194.
    • (1997) Proceedings of 1st International Conference , pp. 183-194
    • Rezgui, Y.1    Cooper, G.2    Yip, J.3    Brandon, P.4
  • 33
    • 84919518701 scopus 로고    scopus 로고
    • Ver. 1.0, Salford University, July 1998
    • SPICE Questionnaire (1998), Key Construction Process Questionnaire, Ver. 1.0, Salford University, July 1998.
    • (1998) Key Construction Process Questionnaire
  • 35
    • 84986007533 scopus 로고    scopus 로고
    • The Integration of Tools for Concurrent Design and Fabrication of Steel Structures, in Concurrent Engineering in Construction
    • Anumba, C. J. and Evbuomwan, N. F. O. (eds), IStructE, London, 3-4 July 1997
    • Wailes, M. K., Tizani, W., Nethercot, D. A. and Smith, N. J. (1997), The Integration of Tools for Concurrent Design and Fabrication of Steel Structures, in Concurrent Engineering in Construction: Proceedings of 1st International Conference, Anumba, C. J. and Evbuomwan, N. F. O. (eds), IStructE, London, 3-4 July 1997, pp. 100-108.
    • (1997) Proceedings of 1st International Conference , pp. 100-108
    • Wailes, M.K.1    Tizani, W.2    Nethercot, D.A.3    Smith, N.J.4
  • 36
    • 0003227484 scopus 로고
    • The Role of Concurrent Engineering in Weapons System Acquisition
    • Institute for Defence Analyses, Alexandria, VA
    • Winner, R. I., Pennell, J. P., Bertrend, H. E. and Slusarczuk, M. M. G. (1988), The Role of Concurrent Engineering in Weapons System Acquisition, IDA Report R-338, Institute for Defence Analyses, Alexandria, VA.
    • (1988) IDA Report
    • Winner, R.I.1    Pennell, J.P.2    Bertrend, H.E.3    Slusarczuk, M.M.G.4
  • 38
    • 0003352967 scopus 로고
    • Case Study Research: Design and Methods
    • Sage Publications, 1989
    • Yin, R. K. (1989), Case Study Research: Design and Methods, Applied Social Research Methods Series, Vol. 5, Sage Publications, 1989.
    • (1989) Applied Social Research Methods Series , vol.5
    • Yin, R.K.1
  • 39
    • 84919518699 scopus 로고    scopus 로고
    • Department of Manufacturing Engineering, Loughborough University, Lecture Notes, Section 2
    • Young, R. I. M. (1999), Organisational Issues in Concurrent Engineering, Department of Manufacturing Engineering, Loughborough University, Lecture Notes, Section 2, pp. 8-15.
    • (1999) Organisational Issues in Concurrent Engineering , pp. 8-15
    • Young, R.I.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.