메뉴 건너뛰기




Volumn 3, Issue , 2012, Pages 123-128

An interval-valued fuzzy analytical hierarchy process approach and its application

Author keywords

fuzzy analytic hierarchy process; fuzzy TOPSIS; interval valued triangular fuzzy set; project selection

Indexed keywords

FUZZY AHP; FUZZY ANALYTIC HIERARCHY PROCESS; FUZZY ANALYTICAL HIERARCHY PROCESS; FUZZY TOPSIS; HYBRID METHOD; IDEAL SOLUTIONS; INDEX SYSTEMS; INTERVAL-VALUED; MULTI ATTRIBUTE DECISION MAKING; NEW MODEL; PROJECT EVALUATION; PROJECT SELECTION; RANKING OF ALTERNATIVES; TRIANGULAR FUZZY NUMBERS;

EID: 84861032114     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ICCSEE.2012.480     Document Type: Conference Paper
Times cited : (5)

References (16)
  • 2
    • 77955711587 scopus 로고    scopus 로고
    • An ANP approach for R&D project evaluation based on interdependencies between research objectives and evaluation criteria
    • Uk Jung and D. W. Seo, "An ANP approach for R&D project evaluation based on interdependencies between research objectives and evaluation criteria," Decision Support Systems, vol. 49, pp. 335-342, 2010.
    • (2010) Decision Support Systems , vol.49 , pp. 335-342
    • Jung, U.1    Seo, D.W.2
  • 3
    • 78650383476 scopus 로고    scopus 로고
    • Neurofuzzy genetic system for selection of construction project managers
    • Rashidi Abbas, Jazebi Fateme, and Brilakis Ioannis, "Neurofuzzy Genetic System for Selection of Construction Project Managers," Journal of Construction Engineering & Management, vol. 137(1), pp. 17-29, 2011.
    • (2011) Journal of Construction Engineering & Management , vol.137 , Issue.1 , pp. 17-29
    • Abbas, R.1    Fateme, J.2    Ioannis, B.3
  • 4
    • 79957587597 scopus 로고    scopus 로고
    • A fuzzy DEA and knapsack formulation integrated model for project selection
    • Ping-Teng Chang and Jung-Hua Lee, "A fuzzy DEA and knapsack formulation integrated model for project selection," Computers & Operations Research, vol. 39, pp. 112-125, 2012.
    • (2012) Computers & Operations Research , vol.39 , pp. 112-125
    • Chang, P.-T.1    Lee, J.-H.2
  • 6
    • 0000316805 scopus 로고    scopus 로고
    • Interval-valued strict preference with Zadeh triples
    • I. B, Türksen, "Interval-valued strict preference with Zadeh triples," Fuzzy Sets and Systems, vol. 78, pp. 183-195, 1996.
    • (1996) Fuzzy Sets and Systems , vol.78 , pp. 183-195
    • Türksen, I.B.1
  • 9
    • 0003795805 scopus 로고
    • PhD dissertation. Department of Industrial Engineering, Kansas State University
    • D. S. Negi, "Fuzzy analysis and optimization," PhD dissertation. Department of Industrial Engineering, Kansas State University, 1989.
    • (1989) Fuzzy Analysis and Optimization
    • Negi, D.S.1
  • 10
    • 41549152994 scopus 로고    scopus 로고
    • The interval-valued fuzzy TOPSIS methods and experimental analysis
    • T. Y. Chen and C. Y. Tsao, "The interval-valued fuzzy TOPSIS methods and experimental analysis," Fuzzy Sets and Systems, vol. 159, pp. 1410- 1428, 2007.
    • (2007) Fuzzy Sets and Systems , vol.159 , pp. 1410-1428
    • Chen, T.Y.1    Tsao, C.Y.2
  • 11
    • 58549095436 scopus 로고    scopus 로고
    • Extension of fuzzy TOPSIS method based on interval-valued fuzzy sets
    • B. Ashtiani, F. Haghighirad, A. Makui, and G. Montazer, "Extension of fuzzy TOPSIS method based on interval-valued fuzzy sets," Applied Soft Computing, vol. 9, pp. 457-461, 2009.
    • (2009) Applied Soft Computing , vol.9 , pp. 457-461
    • Ashtiani, B.1    Haghighirad, F.2    Makui, A.3    Montazer, G.4
  • 12
    • 0002296389 scopus 로고    scopus 로고
    • Extensions of the TOPSIS for group decision-making under fuzzy environment
    • C. T. Chen, "Extensions of the TOPSIS for group decision-making under fuzzy environment," Fuzzy Sets and Systems, vol. 114, pp. 1-9, 2000.
    • (2000) Fuzzy Sets and Systems , vol.114 , pp. 1-9
    • Chen, C.T.1
  • 13
    • 0026579988 scopus 로고
    • Project selection by a multiple-criteria decision making method: An example from a developing country
    • R. P. Mohanty. "Project selection by a multiple-criteria decision making method: An example from a developing country, " International Journal of Project Management, vol. 10, pp. 31-38, 1992.
    • (1992) International Journal of Project Management , vol.10 , pp. 31-38
    • Mohanty, R.P.1
  • 14
    • 3342977741 scopus 로고    scopus 로고
    • Bid/no-bid decision-making-a fuzzy linguistic approach
    • C. T. Lin and Y. T. Chen, "Bid/no-bid decision-making-a fuzzy linguistic approach." International Journal of Project Management, vol. 22, pp. 585-593, 2004.
    • (2004) International Journal of Project Management , vol.22 , pp. 585-593
    • Lin, C.T.1    Chen, Y.T.2
  • 15
    • 33745001751 scopus 로고    scopus 로고
    • Integrated project evaluation and selection using multiple-attribute decision-making technique
    • Dey Prasanta Kumar, "Integrated project evaluation and selection using multiple-attribute decision-making technique," International Journal of Production Economics, vol. 103, pp. 90-103, 2006.
    • (2006) International Journal of Production Economics , vol.103 , pp. 90-103
    • Kumar, D.P.1
  • 16
    • 67349162089 scopus 로고    scopus 로고
    • Research on project selection system of pre-evaluation of engineering design project bidding
    • Jin Wang, Yujie Xu, and Zhun Li, "Research on project selection system of pre-evaluation of engineering design project bidding," International Journal of Project Management, vol. 27, pp. 584-599, 2009.
    • (2009) International Journal of Project Management , vol.27 , pp. 584-599
    • Wang, J.1    Xu, Y.2    Li, Z.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.