메뉴 건너뛰기




Volumn 25, Issue 3, 2012, Pages 68-80

Assessing the Economic Value of Transmission in Alberta's Restructured Electricity Market

Author keywords

[No Author keywords available]

Indexed keywords


EID: 84860612144     PISSN: 10406190     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.tej.2012.03.003     Document Type: Article
Times cited : (8)

References (26)
  • 1
    • 85171825347 scopus 로고    scopus 로고
    • Sioshansi and Wolfgang Pfaffenberger, Eds., ELECTRICITY MARKET REFORM: AN INTERNATIONAL PERSPECTIVE (Elsevier, 2006); Chi-Keung Woo, Debra Lloyd and Asher Tishler, Electricity Market Reform Failures: UK, Norway, Alberta and California, 31 ENERGY POLICY 1103-1115 (2003); Chi-Keung Woo, Larry C.H. Chow and Noam Lior, Eds., ELECTRICITY MARKET REFORM AND DEREGULATION, 31 ENERGY
    • Fereidoon P. Sioshansi and Wolfgang Pfaffenberger, Eds., ELECTRICITY MARKET REFORM: AN INTERNATIONAL PERSPECTIVE (Elsevier, 2006); Chi-Keung Woo, Debra Lloyd and Asher Tishler, Electricity Market Reform Failures: UK, Norway, Alberta and California, 31 ENERGY POLICY 1103-1115 (2003); Chi-Keung Woo, Larry C.H. Chow and Noam Lior, Eds., ELECTRICITY MARKET REFORM AND DEREGULATION, 31 ENERGY 745-1114 (2006).
    • (2006) , pp. 745-1114
    • Fereidoon, P.1
  • 2
    • 85171820938 scopus 로고    scopus 로고
    • Costs of Electricity Deregulation, 31 ENERGY
    • Chi-Keung Woo, Michael King, Asher Tishler and Larry C.H. Chow, Costs of Electricity Deregulation, 31 ENERGY 747-768 (2006).
    • (2006) , pp. 747-768
    • Woo, C.-K.1    King, M.2    Tishler, A.3    Chow, L.C.H.4
  • 3
    • 85171825298 scopus 로고    scopus 로고
    • Electricity Derivatives and Risk Management, 31 ENERGY 940-953 (2006); Chi-Keung Woo, Ira Horowitz, Brian Horii and Rouslan I. Karimov, The Efficient Frontier for Spot and Forward Purchases: An Application to Electricity, 55 J. OPERATIONAL RES. SOC.
    • Shijie Deng and Shmuel S. Oren, Electricity Derivatives and Risk Management, 31 ENERGY 940-953 (2006); Chi-Keung Woo, Ira Horowitz, Brian Horii and Rouslan I. Karimov, The Efficient Frontier for Spot and Forward Purchases: An Application to Electricity, 55 J. OPERATIONAL RES. SOC. 1130-1136 (2004)
    • (2004) , pp. 1130-1136
    • Deng, S.1    Oren, S.S.2
  • 4
    • 85171814367 scopus 로고    scopus 로고
    • Efficient Frontiers for Electricity Procurement by An LDC with Multiple Purchase Options, 34 OMEGA 70-80
    • Chi-Keung Woo, Ira Horowitz, Arne Olson, Brian Horii and Carmen Baskette, Efficient Frontiers for Electricity Procurement by An LDC with Multiple Purchase Options, 34 OMEGA 70-80 (2006).
    • (2006)
    • Woo, C.-K.1    Horowitz, I.2    Olson, A.3    Horii, B.4    Baskette, C.5
  • 5
    • 85171824096 scopus 로고    scopus 로고
    • Congestion Management in Competitive Power Market: A Bibliographical Survey, 76 ELECTRIC POWER SYS. RES. 153-164 (2005); Steven Stoft, POWER SYSTEM ECONOMICS (IEEE, 2002); Cameron Lusztig, Peter Feldberg, Ren Orans and Arne Olson, A Survey of Transmission Tariffs in North America, 31 ENERGY
    • Ashwani Kumar, S.C. Srivastava and S.N. Singh, Congestion Management in Competitive Power Market: A Bibliographical Survey, 76 ELECTRIC POWER SYS. RES. 153-164 (2005); Steven Stoft, POWER SYSTEM ECONOMICS (IEEE, 2002); Cameron Lusztig, Peter Feldberg, Ren Orans and Arne Olson, A Survey of Transmission Tariffs in North America, 31 ENERGY 1017-1039 (2006).
    • (2006) , pp. 1017-1039
    • Ashwani Kumar, S.C.1    Singh, S.S.N.2
  • 6
    • 85171819138 scopus 로고    scopus 로고
    • Transmission Investment and Expansion Planning in A Restructured Electricity Market, 31 ENERGY
    • Felix F. Wu, F.L. Zheng and F.S. Wen, Transmission Investment and Expansion Planning in A Restructured Electricity Market, 31 ENERGY 954-966 (2006).
    • (2006) , pp. 954-966
    • Felix, F.1    Wu, F.L.2    Zheng3    Wen, F.S.4
  • 7
    • 85171816746 scopus 로고    scopus 로고
    • PJM, PJM Regional Transmission Planning Process
    • PJM, PJM Regional Transmission Planning Process (2011), at http://www.pjm.com/media/documents/manuals/archive/m14b/ARCHIVED%20m14b% 20v19.ashx; WarrenLasher, Transmission Planning in the ERCOT Interconnection (2011), at: http://www.ercot.com/content/news/presentations/2011/ERCOT% 20Transmission%20Planning%20NARUC%2011-14-11.pdf; Howard Tarler, Reliability Needs Assessment (RNA) Overview (2010), at http://www.nyiso.com/public/webdocs/services/planning/reliability-assess ments/Reliability-Forum-H-Tarler-100410.pdf; ISO/RTO Planning Committee, ISO/RTO Electric System Planning Current Practices, Expansion Plans, and Planning Issues(2006), at http://www.ieso.ca/imoweb/pubs/ircp/iso-rto/iso-rtoelectric-system-plann ing.pdf.
    • (2011)
  • 8
    • 85171818469 scopus 로고    scopus 로고
    • WarrenLasher, Transmission Planning in the ERCOT Interconnection
    • WarrenLasher, Transmission Planning in the ERCOT Interconnection (2011), at: http://www.ercot.com/content/news/presentations/2011/ERCOT%20Transmissio n%20Planning%20NARUC%2011-14-11.pdf
    • (2011)
  • 9
    • 85171821175 scopus 로고    scopus 로고
    • Reliability Needs Assessment (RNA) Overview
    • Howard Tarler, Reliability Needs Assessment (RNA) Overview (2010), at http://www.nyiso.com/public/webdocs/services/planning/reliability_assess ments/Reliability_Forum_H_Tarler_100410.pdf; ISO/RTO Planning Committee, ISO/RTO Electric System Planning Current Practices, Expansion Plans, and Planning Issues(2006), at http://www.ieso.ca/imoweb/pubs/ircp/iso-rto/iso-rtoelectric-system-plann ing.pdf.
    • (2010)
    • Howard, T.1
  • 10
    • 85171826008 scopus 로고    scopus 로고
    • ISO/RTO Planning Committee, ISO/RTO Electric System Planning Current Practices, Expansion Plans, and Planning Issues
    • ISO/RTO Planning Committee, ISO/RTO Electric System Planning Current Practices, Expansion Plans, and Planning Issues(2006), at http://www.ieso.ca/imoweb/pubs/ircp/iso-rto/iso-rtoelectric-system-plann ing.pdf.
    • (2006)
  • 11
    • 85171822881 scopus 로고    scopus 로고
    • AESO, Draft 2011 Long-Term Transmission Plan (Alberta Electric System Operator, 2011), at ; AESO, Draft 2011 Long-Term Transmission Plan Appendices (Alberta Electric System Operator
    • AESO, Draft 2011 Long-Term Transmission Plan (Alberta Electric System Operator, 2011), at http://www.aeso.ca/transmission/22021.html; AESO, Draft 2011 Long-Term Transmission Plan Appendices (Alberta Electric System Operator, 2011), at http://www.aeso.ca/transmission/22021.html.
    • (2011)
  • 12
    • 85171818748 scopus 로고    scopus 로고
    • Government of Alberta, Investing in our Economy: North-South Transmission Reinforcement (Government of Alberta, 2012)
    • Government of Alberta, Investing in our Economy: North-South Transmission Reinforcement (Government of Alberta, 2012), at http://www.energy.gov.ab.ca/Electricity/pdfs/InvestCTRCresp.pdf.
  • 13
    • 85171825009 scopus 로고    scopus 로고
    • EDC Associates, 2010 Alberta Electric Industry Study (EDC Associates, 2011)
    • EDC Associates, 2010 Alberta Electric Industry Study (EDC Associates, 2011), at http://www.edcassociates.com/Alberta_Annual_Study(TOC).pdf.
  • 14
    • 85171813487 scopus 로고    scopus 로고
    • ''We did this by assuming that if the two HVDC lines are built, dispatch will be unconstrained. If the two HVDC lines are not built, then dispatch of generation in the north might be constrained by limits on the north-south transmission line. We compared the difference in the cost of generation between the HVDC and no HVDC cases to determine the advantage of adding the two HVDC lines. If this advantage is less than the cost of installing the two HVDC lines, then the generation-only solution is least costly.'' Jeffery Church and John MacCormack, Evidence submitted to Alberta Utilities Commission, Application No. 1607067, Proceeding ID 1045, Western Alberta Transmission Line Application (The Wilson Law Office, 2011) at 3.
    • ''We did this by assuming that if the two HVDC lines are built, dispatch will be unconstrained. If the two HVDC lines are not built, then dispatch of generation in the north might be constrained by limits on the north-south transmission line. We compared the difference in the cost of generation between the HVDC and no HVDC cases to determine the advantage of adding the two HVDC lines. If this advantage is less than the cost of installing the two HVDC lines, then the generation-only solution is least costly.'' Jeffery Church and John MacCormack, Evidence submitted to Alberta Utilities Commission, Application No. 1607067, Proceeding ID 1045, Western Alberta Transmission Line Application (The Wilson Law Office, 2011) at 3.
  • 15
    • 85171820770 scopus 로고    scopus 로고
    • AESO, Alberta Wholesale Market Price Cap (Alberta Electric System Operator
    • AESO, Alberta Wholesale Market Price Cap (Alberta Electric System Operator, 2009), at http://www.aeso.ca/downloads/2009-06-25_Price_Cap_Discussion_Paper_-_Fin al.pdf.
    • (2009)
  • 17
    • 85171823782 scopus 로고    scopus 로고
    • MSA, Quarterly Report: July-Sept. 2011 (Market Surveillance Administrator, 2011) at 7
    • MSA, Quarterly Report: July-Sept. 2011 (Market Surveillance Administrator, 2011) at 7, at http://albertamsa.ca/uploads/pdf/Archive/2011/MSA%20Q3-11%20Report%20113 011.pdf.
  • 18
    • 85171821364 scopus 로고    scopus 로고
    • Pfeifenberger and Kathleen Spees, Evaluation of Market Fundamentals and Challenges to Long-Term System Adequacy in Alberta's Electricity Market (Brattle Group, 2011), at
    • Johannes P. Pfeifenberger and Kathleen Spees, Evaluation of Market Fundamentals and Challenges to Long-Term System Adequacy in Alberta's Electricity Market (Brattle Group, 2011), at http://www.brattle.org/_documents/UploadLibrary/Upload943.pdf.
    • Johannes, P.1
  • 19
    • 85171817161 scopus 로고    scopus 로고
    • Anticipation for Efficient Electricity Transmission Network Investments, PROCEEDINGS OF FIRST INT'L. SCIENTIFIC CONFERENCE ON ''BUILDING NETWORKS FOR A BRIGHTER FUTURE''
    • Vincent Rious, Phillipe Dessante and Jean-Michel Glachant, Anticipation for Efficient Electricity Transmission Network Investments, PROCEEDINGS OF FIRST INT'L. SCIENTIFIC CONFERENCE ON ''BUILDING NETWORKS FOR A BRIGHTER FUTURE'' (2008), at http://hal-supelec.archives-ouvertes.fr/docs/00/33/92/54/PDF/anticipatio n_trans_inv.pdf.
    • (2008)
    • Vincent, R.1    Phillipe, D.2    Jean-Michel, G.3
  • 20
    • 85171817239 scopus 로고    scopus 로고
    • Avoided Cost Estimation and Post-Reform Funding Allocation for California's Energy Efficiency Programs, 31 ENERGY
    • Carmen Baskette, Brian Horii, Eli Kollman and Snuller Price, Avoided Cost Estimation and Post-Reform Funding Allocation for California's Energy Efficiency Programs, 31 ENERGY 1084-1099 (2006).
    • (2006) , pp. 1084-1099
    • Carmen, B.1    Brian, H.2    Eli, K.3    Snuller, P.4
  • 21
    • 85171822238 scopus 로고    scopus 로고
    • Alberta Energy Resources Conservation Board (ERCB), Alberta's Energy Reserves 2008 and Supply/Demand Outlook
    • Alberta Energy Resources Conservation Board (ERCB), Alberta's Energy Reserves 2008 and Supply/Demand Outlook 2009-2018 (2009), at http://www.ercb.ca/docs/products/STs/st98-2009.pdf.
    • (2009) , pp. 2009-2018
  • 22
    • 85171827814 scopus 로고    scopus 로고
    • These estimates are shown in 2010 dollars, even though the simulation results are for the year 2020, due to the WECC's convention of using 2010 dollars in its production simulation database. The U.S. dollar values in the WECC database have been converted from U.S. to Canadian dollars. The results in Table 5 show that the marginal impact of adding a first line is substantially larger than the impact of adding the second line, reflecting the law of diminishing returns.
    • These estimates are shown in 2010 dollars, even though the simulation results are for the year 2020, due to the WECC's convention of using 2010 dollars in its production simulation database. The U.S. dollar values in the WECC database have been converted from U.S. to Canadian dollars. The results in Table 5 show that the marginal impact of adding a first line is substantially larger than the impact of adding the second line, reflecting the law of diminishing returns.
  • 23
    • 85171822025 scopus 로고    scopus 로고
    • As an additional check of the results in Table 6, we estimate customer benefits in Case 1 without the MCP scaling in Step 6 of the Appendix. At the average MCP/MEC ratio of 2.10, the estimated customer benefit of the one-line expansion transmission in Case 1 is $197M in 2020, higher than the estimated revenue requirement of $157M. The estimated customer benefit of the twoline expansion is $205M in 2020, less than the estimated revenue requirement of $344M.
    • As an additional check of the results in Table 6, we estimate customer benefits in Case 1 without the MCP scaling in Step 6 of the Appendix. At the average MCP/MEC ratio of 2.10, the estimated customer benefit of the one-line expansion transmission in Case 1 is $197M in 2020, higher than the estimated revenue requirement of $157M. The estimated customer benefit of the twoline expansion is $205M in 2020, less than the estimated revenue requirement of $344M.
  • 24
    • 85171820836 scopus 로고    scopus 로고
    • Even if the shortage cost function is linear in shortage size, the findings described below remain valid.
    • Even if the shortage cost function is linear in shortage size, the findings described below remain valid.
  • 25
    • 85171817459 scopus 로고    scopus 로고
    • An obvious example of lower economic growth is that less transmission expansion would reduce direct and indirect employment and spending. Moreover, generation development may be discouraged by the lack of fair access to transmission capacity required by new generation. Finally, higher electricity prices may hamper Alberta's GDP growth.
    • An obvious example of lower economic growth is that less transmission expansion would reduce direct and indirect employment and spending. Moreover, generation development may be discouraged by the lack of fair access to transmission capacity required by new generation. Finally, higher electricity prices may hamper Alberta's GDP growth.
  • 26
    • 85171819117 scopus 로고    scopus 로고
    • For a similar case in point, see Chi-Keung Woo, Arne Olson and Ren Orans, Benchmarking the Price Reasonableness of An Electricity Tolling Agreement, 17(5) ELEC. J.
    • For a similar case in point, see Chi-Keung Woo, Arne Olson and Ren Orans, Benchmarking the Price Reasonableness of An Electricity Tolling Agreement, 17(5) ELEC. J. 65-75 (2004).
    • (2004) , pp. 65-75


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.