메뉴 건너뛰기




Volumn 4, Issue 2, 2012, Pages

Wind energy assessment for five locations in Saudi Arabia

Author keywords

[No Author keywords available]

Indexed keywords

CAPACITY FACTORS; HUB HEIGHT; MINIMUM COST; PERFORMANCE PARAMETERS; SAUDI ARABIA; TURBINE PARAMETERS; WEIBULL PARAMETERS; WIND ENERGY ASSESSMENT; WIND SPEED;

EID: 84860491264     PISSN: 19417012     EISSN: None     Source Type: Journal    
DOI: 10.1063/1.4705116     Document Type: Conference Paper
Times cited : (21)

References (19)
  • 1
    • 33847636287 scopus 로고    scopus 로고
    • Performance evaluation of pairing between sites and wind turbines
    • DOI 10.1016/j.renene.2006.07.003, PII S0960148106002199
    • S.-Y. Hu and J.-H. Cheng, Performance evaluation of pairing between sites and wind turbines., Renewable Energy 32, 1934-1947 (2007). 10.1016/j.renene. 2006.07.003 (Pubitemid 46366699)
    • (2007) Renewable Energy , vol.32 , Issue.11 , pp. 1934-1947
    • Hu, S.-y.1    Cheng, J.-h.2
  • 2
    • 0345411893 scopus 로고    scopus 로고
    • Previsional estimation of the energy output of windgenerators
    • DOI 10.1016/S0960-1481(03)00197-6
    • R. Pallabazzer, Provisional estimation of the energy output of wind generators., Renewable Energy 29, 413-420 (2004). 10.1016/S0960-1481(03)00197-6 (Pubitemid 37471007)
    • (2004) Renewable Energy , vol.29 , Issue.3 , pp. 413-420
    • Pallabazzer, R.1
  • 3
    • 33747355234 scopus 로고    scopus 로고
    • A geographic analysis of wind turbine placement in Northern California
    • 10.1016/j.enpol.2005.03.004
    • L. C. Rodman and R. K. Meentemeyer, A geographic analysis of wind turbine placement in Northern California., Energy Policy J. 34, 2137-2149 (2006). 10.1016/j.enpol.2005.03.004
    • (2006) Energy Policy J. , vol.34 , pp. 2137-2149
    • Rodman, L.C.1    Meentemeyer, R.K.2
  • 4
    • 32044444887 scopus 로고    scopus 로고
    • Evaluation of wind energy potential and electricity generation on the coast of Mediterranean Sea in Egypt
    • DOI 10.1016/j.renene.2005.06.015, PII S0960148105001795
    • A. S. Ahmed Shata and R. Hanitsch, Evaluation of wind energy potential and electricity generation on the coast of Mediterranean Sea in Egypt., Renewable Energy 31, 1183-1202 (2006). 10.1016/j.renene.2005.06.015 (Pubitemid 43199554)
    • (2006) Renewable Energy , vol.31 , Issue.8 , pp. 1183-1202
    • Ahmed Shata, A.S.1    Hanitsch, R.2
  • 5
    • 33745915238 scopus 로고    scopus 로고
    • The potential of electricity generation on the east coast of Red Sea in Egypt
    • DOI 10.1016/j.renene.2005.09.026, PII S0960148105002843
    • A. S. Ahmed Shata and R. Hanitsch, The potential of electricity generation on the east coast of Red Sea in Egypt., Renewable Energy 31, 1597-1615 (2006). 10.1016/j.renene.2005.09.026 (Pubitemid 44051883)
    • (2006) Renewable Energy , vol.31 , Issue.10 , pp. 1597-1615
    • Ahmed Shata, A.S.1    Hanitsch, R.2
  • 6
    • 35548930663 scopus 로고    scopus 로고
    • Electricity generation and wind potential assessment at Hurghada, Egypt
    • DOI 10.1016/j.renene.2007.06.001, PII S0960148107001796
    • A. S. Ahmed Shata and R. Hanitsch, Electricity generation and wind potential assessment at Hurghada, Egypt., Renewable Energy 33, 141-148 (2008). 10.1016/j.renene.2007.06.001 (Pubitemid 350008065)
    • (2008) Renewable Energy , vol.33 , Issue.1 , pp. 141-148
    • Ahmed Shata, A.S.1    Hanitsch, R.2
  • 7
    • 0036525986 scopus 로고    scopus 로고
    • Wind power cost assessment at twenty locations in the Kingdom of Saudi Arabia
    • DOI 10.1016/S0960-1481(02)00063-0, PII S0960148102000630
    • S. Rehman, T. O. Halawani, and M. Mohandes, Wind power cost assessment at twenty locations in the Kingdom of Saudi Arabia., Renewable Energy 28, 573-583 (2003). 10.1016/S0960-1481(02)00063-0 (Pubitemid 35302116)
    • (2003) Renewable Energy , vol.28 , Issue.4 , pp. 573-583
    • Rehman, S.1    Halawani, T.O.2    Mohandes, M.3
  • 9
    • 68749116205 scopus 로고    scopus 로고
    • A review on reliability assessment for wind power
    • 10.1016/j.rser.2009.06.006
    • J. Wen, Y. Zheng, and F. Donghan, A review on reliability assessment for wind power., Renewable Sustainable Energy Rev. 13 (9), 2485-2494 (2009). 10.1016/j.rser.2009.06.006
    • (2009) Renewable Sustainable Energy Rev. , vol.13 , Issue.9 , pp. 2485-2494
    • Wen, J.1    Zheng, Y.2    Donghan, F.3
  • 11
    • 0004099341 scopus 로고
    • 2nd ed. (Consultancy Services, Wind Energy, Developing Countries (CWD), The Netherlands)
    • H. Lysen, Introduction to Wind Energy, 2nd ed. (Consultancy Services, Wind Energy, Developing Countries (CWD), The Netherlands, 1983), pp. 36-47.
    • (1983) Introduction to Wind Energy , pp. 36-47
    • Lysen, H.1
  • 12
    • 0023136402 scopus 로고
    • Wind speed and wind energy potential of Jordan
    • DOI 10.1016/0038-092X(87)90071-5
    • S. M. Habali, M. A. S. Hamdan, B. A. Jubran, and A. I. O. Zaid, Wind speed and wind energy potential of Jordan., Sol. Energy 38 (1), 59-70 (1987). 10.1016/0038-092X(87)90071-5 (Pubitemid 17511885)
    • (1987) Solar energy , vol.38 , Issue.1 , pp. 59-70
    • Habali, S.M.1    Hamdan, M.A.S.2    Jubran, B.A.3    Zaid Adnan, I.O.4
  • 13
    • 0023846458 scopus 로고
    • Assessment and applications of wind energy in Jordan
    • DOI 10.1016/0038-092X(88)90077-1
    • S. M. Habali, A. S. Hamdan, B. A. Jubran, and A. I. O. Zaid, Assessment and applications of wind energy in Jordan., Sol. Energy 40 (2), 99-105 (1988). 10.1016/0038-092X(88)90077-1 (Pubitemid 18561015)
    • (1988) Solar energy , vol.40 , Issue.2 , pp. 99-105
    • Habali, S.M.1    Hamdan, M.A.S.2    Jubran, B.A.3    Zaid Adnan, I.O.4
  • 14
    • 32044439783 scopus 로고
    • The potential of wind electricity generation in Bangladesh
    • 10.1016/0960-1481(91)90038-Q
    • M. Sarkar and M. Hussain, The potential of wind electricity generation in Bangladesh., Renewable Energy 1 (5), 855-857 (1991). 10.1016/0960-1481(91) 90038-Q
    • (1991) Renewable Energy , vol.1 , Issue.5 , pp. 855-857
    • Sarkar, M.1    Hussain, M.2
  • 15
    • 0027787139 scopus 로고
    • Assessment of the possibility of using three types of wind turbine in Bahrain
    • W. E. Alnaser, Assessment of the possibility of using three types of wind turbine in Bahrain., Renewable Energy 3 (2-3), 179-84 (1993). 10.1016/0960-1481(93)90017-B (Pubitemid 24385157)
    • (1993) Renewable Energy , vol.3 , Issue.2-3 , pp. 179-184
    • Alnaser, W.E.1
  • 16
    • 0029414269 scopus 로고
    • Investigation of wind power potential at Bozcaada, Turkey
    • 10.1016/0960-1481(95)00091-7
    • F. Trksoy, Investigation of wind power potential at Bozcaada, Turkey., Renewable Energy 6 (8), 917-923 (1995). 10.1016/0960-1481(95)00091-7
    • (1995) Renewable Energy , vol.6 , Issue.8 , pp. 917-923
    • Trksoy, F.1
  • 17
    • 42149186975 scopus 로고    scopus 로고
    • Wind turbine design cost and scaling model, National Renewable Energy Laboratory, December 2006
    • L. Fingersh, M. Hand, and A. Laxson, Wind turbine design cost and scaling model, Technical Report NREL/TP-500-40566, National Renewable Energy Laboratory, December 2006.
    • Technical Report NREL/TP-500-40566
    • Fingersh, L.1    Hand, M.2    Laxson, A.3
  • 19
    • 84860442081 scopus 로고    scopus 로고
    • See for more information about wind turbines and wind farms database
    • See http://www.thewindpower.net/manuturb-turbines-en.php for more information about wind turbines and wind farms database.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.