메뉴 건너뛰기




Volumn 6, Issue 2, 2012, Pages 89-104

FMEA of a tailings dam

Author keywords

control measures; detection measures; FMEA; qualitative risk analysis; tailings dam

Indexed keywords

FAILURE ANALYSIS; OPTIMIZATION; QUALITATIVE ANALYSIS; RISK ASSESSMENT; TAILINGS DAM;

EID: 84860321737     PISSN: 17499518     EISSN: 17499526     Source Type: Journal    
DOI: 10.1080/17499518.2011.615751     Document Type: Article
Times cited : (15)

References (12)
  • 1
    • 84860344232 scopus 로고    scopus 로고
    • Risk analysis methodologies
    • Portugal: Lisbon: Sociedade Portuguesa de Geotecnia (SPG) 29-30 September 2005
    • Caldeira, L., 2005. Risk analysis methodologies. In: Proceedings of 2nd Jornadas Luso-Espanholas de Geotecnia, 29-30 September 2005, Lisbon, Portugal. Lisbon: Sociedade Portuguesa de Geotecnia (SPG), 31 - 55.
    • (2005) Proceedings of 2nd Jornadas Luso-Espanholas de Geotecnia , pp. 31-55
    • Caldeira, L.1
  • 2
    • 0026051315 scopus 로고
    • Textured geomembrane for the staged raising of Cerro do Lobo Dam
    • 17th ICOLD Congress, Special Issue
    • Cambridge, M. and Maranha das Neves, E, 1991. Textured geomembrane for the staged raising of Cerro do Lobo Dam, Water Power & Dam Construction, 17th ICOLD Congress, Special Issue. 57, 57 - 64.
    • (1991) Water Power & Dam Construction , vol.57 , pp. 57-64
    • Cambridge, M.1    Maranha das Neves, E.2
  • 3
    • 0034290495 scopus 로고    scopus 로고
    • A method for assessing the relative likelihood of failure of embankment dams by piping
    • Foster, M., Fell, R. and Spannagle, M. 2000a. A method for assessing the relative likelihood of failure of embankment dams by piping. Canadian Geotechnical Journal, 37: 1025-1061.
    • (2000) Canadian Geotechnical Journal , vol.37 , pp. 1025-1061
    • Foster, M.1    Fell, R.2    Spannagle, M.3
  • 4
    • 0034290459 scopus 로고    scopus 로고
    • The statistics of embankment dam failures and accidents
    • Foster, M., Fell, R. and Spannagle, M. 2000b. The statistics of embankment dam failures and accidents. Canadian Geotechnical Journal, 37(5): 1000-1024.
    • (2000) Canadian Geotechnical Journal , vol.37 , Issue.5 , pp. 1000-1024
    • Foster, M.1    Fell, R.2    Spannagle, M.3
  • 6
    • 84860329039 scopus 로고    scopus 로고
    • Cerro do Lobo dam. 4th Construction phase - Construction of the heightening project of the dam between elevations 252 and 255
    • Hidroprojecto
    • Hidroprojecto, 2002. Cerro do Lobo dam. 4th Construction phase - Construction of the heightening project of the dam between elevations 252 and 255. Final design.
    • (2002) Final design
  • 7
    • 4544362046 scopus 로고    scopus 로고
    • Tailings dams. Risk of dangerous occurrences. Lessons learnt from practical experiences
    • International Commission on Large Dams (ICOLD)
    • International Commission on Large Dams (ICOLD), 2001. Tailings dams. Risk of dangerous occurrences. Lessons learnt from practical experiences. Bulletin n. 121, 144p.
    • (2001) Bulletin n. , vol.121 , pp. 144
  • 8
    • 84860333297 scopus 로고    scopus 로고
    • Item toolkit
    • Item Toolkit. User manual, version 5.2
    • Item Toolkit, 2002. Item toolkit. User manual, version 5.2. Copyright© Item software.
    • (2002) Copyright© Item software
  • 12
    • 56249098343 scopus 로고    scopus 로고
    • Phased construction of the Barragem de Cerro do Lobo
    • Spain: Paris: International Comission of Large Dams 18-23 May 2006
    • Toscano, M., and Cambridge, M., 2006. Phased construction of the Barragem de Cerro do Lobo. In: Proceedings of the 22nd Congress of ICOLD, 18-23 May 2006, Barcelona, Spain. Paris: International Comission of Large Dams.
    • (2006) In: Proceedings of the 22nd Congress of ICOLD
    • Toscano, M.1    Cambridge, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.