-
1
-
-
84859965415
-
Influence of preventive maintenance policy on manufacturing systems performances
-
1-3 July 2009, London
-
Caputo, AC, and, Salini, P. 2009. Influence of preventive maintenance policy on manufacturing systems performances. In: Proceedings of the world congress on engineering. 1-3 July 2009, London.
-
(2009)
Proceedings of the World Congress on Engineering
-
-
Caputo, A.C.1
Salini, P.2
-
2
-
-
33847060568
-
Preventive maintenance of manufacturing systems under environmental constraints
-
Dellagi, S, Rezg, N, and, Xie, X. 2007. Preventive maintenance of manufacturing systems under environmental constraints. International Journal of Production Research, 45 (5): 1233-1254.
-
(2007)
International Journal of Production Research
, vol.45
, Issue.5
, pp. 1233-1254
-
-
Dellagi, S.1
Rezg, N.2
Xie, X.3
-
3
-
-
15344350551
-
Maintenance scheduling and production control of multiple-machine manufacturing systems
-
Gharbi, A, and, Kenné, J-P. 2005. Maintenance scheduling and production control of multiple-machine manufacturing systems. Computers & Industrial Engineering, 48 (4): 693-707.
-
(2005)
Computers & Industrial Engineering
, vol.48
, Issue.4
, pp. 693-707
-
-
Gharbi, A.1
Kenné, J.-P.2
-
4
-
-
33846381038
-
Machine scheduling performance with maintenance and failure
-
Guo, Y. 2007. Machine scheduling performance with maintenance and failure. Mathematical and Computer Modelling, 45 (9/10): 1067-1080.
-
(2007)
Mathematical and Computer Modelling
, vol.45
, Issue.910
, pp. 1067-1080
-
-
Guo, Y.1
-
5
-
-
0035401086
-
The relationship between preventive maintenance and manufacturing systems performance
-
Gupta, D, Gnalay, Y, and, Srinivasan, MM. 2001. The relationship between preventive maintenance and manufacturing systems performance. European Journal of Operational Research, 132 (1): 146-162.
-
(2001)
European Journal of Operational Research
, vol.132
, Issue.1
, pp. 146-162
-
-
Gupta, D.1
Gnalay, Y.2
Srinivasan, M.M.3
-
6
-
-
0036568125
-
Integrated maintenance and production control of a deteriorating production system
-
Iravani, SMR, and, Duenyas, I. 2002. Integrated maintenance and production control of a deteriorating production system. IIE Transactions, 34 (5): 423-435.
-
(2002)
IIE Transactions
, vol.34
, Issue.5
, pp. 423-435
-
-
Iravani, S.M.R.1
Duenyas, I.2
-
7
-
-
71749107567
-
Integrating flexible-interval preventive maintenance planning with production scheduling
-
Jin, Y-L, Jiang, Z-H, and, Hou, W-R. 2009. Integrating flexible-interval preventive maintenance planning with production scheduling. International Journal of Computer Integrated Manufacturing, 22 (12): 1089-1101.
-
(2009)
International Journal of Computer Integrated Manufacturing
, vol.22
, Issue.12
, pp. 1089-1101
-
-
Jin, Y.-L.1
Jiang, Z.-H.2
Hou, W.-R.3
-
8
-
-
37549010333
-
Simultaneous control of production, preventive and corrective maintenance rates of a failure-prone manufacturing system
-
Kenne, JP, and, Nkeungoue, LJ. 2008. Simultaneous control of production, preventive and corrective maintenance rates of a failure-prone manufacturing system. Applied Numerical Mathematics, 58 (2): 180-194.
-
(2008)
Applied Numerical Mathematics
, vol.58
, Issue.2
, pp. 180-194
-
-
Kenne, J.P.1
Nkeungoue, L.J.2
-
10
-
-
35748982093
-
Multi-machine scheduling with deteriorating job and scheduled maintenance
-
Lee, W-C, and, Wu, C-C. 2008. Multi-machine scheduling with deteriorating job and scheduled maintenance. Applied Mathematical Modelling, 32 (3): 362-373.
-
(2008)
Applied Mathematical Modelling
, vol.32
, Issue.3
, pp. 362-373
-
-
Lee, W.-C.1
Wu, C.-C.2
-
11
-
-
52149122513
-
Odds-based decision-making tool for opportunistic production-maintenance synchronization
-
Levrat, E, Thomas, E, and, Iung, B. 2008. Odds-based decision-making tool for opportunistic production-maintenance synchronization. International Journal of Production Research, 46 (19): 5263-5287.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.19
, pp. 5263-5287
-
-
Levrat, E.1
Thomas, E.2
Iung, B.3
-
12
-
-
56749176201
-
A real-time decision-making of maintenance using fuzzy agent
-
Lu, K-Y, and, Sy, C-C. 2009. A real-time decision-making of maintenance using fuzzy agent. Expert Systems with Applications, 36 (2): 2691-2698.
-
(2009)
Expert Systems with Applications
, vol.36
, Issue.2
, pp. 2691-2698
-
-
Lu, K.-Y.1
Sy, C.-C.2
-
13
-
-
58349089245
-
Scheduling a maintenance activity to minimize total weighted completion-time
-
Mosheiov, G, and, Sarig, A. 2009. Scheduling a maintenance activity to minimize total weighted completion-time. Computers and Mathematics with Applications, 57 (4): 619-623.
-
(2009)
Computers and Mathematics with Applications
, vol.57
, Issue.4
, pp. 619-623
-
-
Mosheiov, G.1
Sarig, A.2
-
14
-
-
67649922887
-
Scheduling sequence-dependent setup time job shops with preventive maintenance
-
Naderi, B, Zandieh, M, and, Fatemi Ghomi, SMT. 2009. Scheduling sequence-dependent setup time job shops with preventive maintenance. International Journal of Advanced Manufacturing Technology, 43 (1/2): 170-181.
-
(2009)
International Journal of Advanced Manufacturing Technology
, vol.43
, Issue.12
, pp. 170-181
-
-
Naderi, B.1
Zandieh, M.2
Fatemi Ghomi, S.M.T.3
-
15
-
-
77951099765
-
Impact of the use-based maintenance policy on the performance of cellular manufacturing systems
-
Safaei, N, Banjevic, D, and, Jardine, AKS. 2010. Impact of the use-based maintenance policy on the performance of cellular manufacturing systems. International Journal of Production Research, 48 (8): 2233-2260.
-
(2010)
International Journal of Production Research
, vol.48
, Issue.8
, pp. 2233-2260
-
-
Safaei, N.1
Banjevic, D.2
Jardine, A.K.S.3
-
16
-
-
22344431748
-
Performance analysis of an FMS operating under different failure rates and maintenance policies
-
Savsar, M. 2005. Performance analysis of an FMS operating under different failure rates and maintenance policies. The International Journal of Flexible Manufacturing Systems, 16 (3): 229-249.
-
(2005)
The International Journal of Flexible Manufacturing Systems
, vol.16
, Issue.3
, pp. 229-249
-
-
Savsar, M.1
-
17
-
-
39049173098
-
Dynamic job-shop scheduling with sequence-dependent setup times: Simulation modeling and analysis
-
Viond, V, and, Sridharan, R. 2006. Dynamic job-shop scheduling with sequence-dependent setup times: Simulation modeling and analysis. International Journal of Advanced Manufacturing Technology, 36 (3/4): 355-372.
-
(2006)
International Journal of Advanced Manufacturing Technology
, vol.36
, Issue.34
, pp. 355-372
-
-
Viond, V.1
Sridharan, R.2
-
18
-
-
0037118559
-
A survey of maintenance policies of deteriorating systems
-
Wang, H. 2002. A survey of maintenance policies of deteriorating systems. European Journal of Operational Research, 139 (3): 469-489.
-
(2002)
European Journal of Operational Research
, vol.139
, Issue.3
, pp. 469-489
-
-
Wang, H.1
-
19
-
-
34548655710
-
Parallel machine scheduling with almost periodic maintenance and non-preemptive jobs to minimize makespan
-
Xu, D, Sun, K, and, Li, H. 2008. Parallel machine scheduling with almost periodic maintenance and non-preemptive jobs to minimize makespan. Computers & Operations Research, 35 (4): 1344-1349.
-
(2008)
Computers & Operations Research
, vol.35
, Issue.4
, pp. 1344-1349
-
-
Xu, D.1
Sun, K.2
Li, H.3
-
20
-
-
39449094595
-
Maintenance scheduling in manufacturing systems based on predicted machine degradation
-
Yang, Z, Djurdjanovic, D, and, Ni, J. 2008. Maintenance scheduling in manufacturing systems based on predicted machine degradation. Journal of Intelligent Manufacturing, 19 (1): 87-98.
-
(2008)
Journal of Intelligent Manufacturing
, vol.19
, Issue.1
, pp. 87-98
-
-
Yang, Z.1
Djurdjanovic, D.2
Ni, J.3
-
21
-
-
33746829075
-
Study on job shop scheduling with sequence-dependent setup times using biological immune algorithm
-
Zhou, Y, Beizhi, L, and, Yang, J. 2006. Study on job shop scheduling with sequence-dependent setup times using biological immune algorithm. International Journal of Advanced Manufacturing Technology, 30 (1/2): 105-111.
-
(2006)
International Journal of Advanced Manufacturing Technology
, vol.30
, Issue.12
, pp. 105-111
-
-
Zhou, Y.1
Beizhi, L.2
Yang, J.3
|