메뉴 건너뛰기




Volumn 50, Issue 3, 2012, Pages 831-841

Minimising schedule cost via simulation optimisation: An application in pipe manufacturing

Author keywords

batch scheduling; cost improvement; simulation optimisation

Indexed keywords

BATCH-SCHEDULING; COST IMPROVEMENTS; COST SAVING; DELIVERY COSTS; FINISHED GOODS; HOLDING COSTS; IN-PIPE; MANUFACTURING EXECUTION SYSTEM; MANUFACTURING FACILITY; PRODUCTION LINE; SIMULATION OPTIMISATION;

EID: 84859957742     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2010.545447     Document Type: Article
Times cited : (13)

References (16)
  • 1
    • 67349193270 scopus 로고    scopus 로고
    • Criteria selection and analysis for single machine dynamic on-line scheduling with multiple objectives and sequence-dependent setups
    • Ang, A., Sivakumar, A., and Qi, C., 2009. Criteria selection and analysis for single machine dynamic on-line scheduling with multiple objectives and sequence-dependent setups. Computers & Industrial Engineering, 56, 1223-1231.
    • (2009) Computers & Industrial Engineering , vol.56 , pp. 1223-1231
    • Ang, A.1    Sivakumar, A.2    Qi, C.3
  • 2
    • 0035546218 scopus 로고    scopus 로고
    • A genetic approach to the scheduling of preventive maintenance tasks on a single product manufacturing production line
    • DOI 10.1016/S0925-5273(01)00120-7, PII S0925527301001207
    • Cavory, G., Dupas, R., and Goncalves, G., 2001. A genetic approach to the scheduling of preventive maintenance tasks on a single product manufacturing production line. International Journal of Production Economics, 74, 135-146. (Pubitemid 32998199)
    • (2001) International Journal of Production Economics , vol.74 , Issue.1-3 , pp. 135-146
    • Cavory, G.1    Dupas, R.2    Goncalves, G.3
  • 3
    • 0036069575 scopus 로고    scopus 로고
    • The state of the art in simulation study on FMS scheduling: A comprehensive survey
    • DOI 10.1007/s001700200095
    • Chan, F., Chan, H., and Lau, C., 2002. The state of the art in simulation study on FMS scheduling: A comprehensive survey. International Journal of Advanced Manufacturing Technology, 19, 830-849. (Pubitemid 34777331)
    • (2002) International Journal of Advanced Manufacturing Technology , vol.19 , Issue.11 , pp. 830-849
    • Chan, F.T.S.1    Chan, H.K.2    Lau, H.C.W.3
  • 4
    • 0035565786 scopus 로고    scopus 로고
    • Using genetic algorithms and heuristics for job shop scheduling with sequence-dependent setup times
    • DOI 10.1023/A:1014990729837
    • Cheung, W. and Zhou, H., 2001. Using genetic algorithms and heuristics for job shop scheduling with sequence-dependent setup times. Annals of Operations Research, 107, 65-81. (Pubitemid 33634450)
    • (2001) Annals of Operations Research , vol.107 , Issue.1-4 , pp. 65-81
    • Cheung, W.1    Zhou, H.2
  • 5
    • 0035307346 scopus 로고    scopus 로고
    • A combined dispatching criteria approach to scheduling semiconductor manufacturing systems
    • DOI 10.1016/S0360-8352(01)00008-0, PII S0360835201000080
    • Dabbas, R., Chen, H., Fowler, J., and Shunk, D., 2001. A combined dispatching criteria approach to scheduling semiconductor manufacturing systems. Computers & Industrial Engineering, 39, 3, 307-324. (Pubitemid 32380884)
    • (2001) Computers and Industrial Engineering , vol.39 , Issue.3-4 , pp. 307-324
    • Dabbas, R.M.1    Chen, H.-N.2    Fowler, J.W.3    Shunk, D.4
  • 6
    • 0001586811 scopus 로고    scopus 로고
    • On-line simulation: Need and evolving research requirements
    • J. Banks, ed. New York: John Wiley & Son, Inc.
    • Davis, W., 1998. On-line simulation: Need and evolving research requirements. In: J. Banks, ed. Handbook of simulation. New York: John Wiley & Son, Inc.
    • (1998) Handbook of Simulation
    • Davis, W.1
  • 7
    • 0029505630 scopus 로고
    • Simulation-based real time scheduling: Review of recent developments
    • C. Alexopoulos, K. Kang, W.R. Lilegdon and D. Goldsman, eds., 3-6 December 1995, Arlington, VA. Piscataway, New Jersey: Institute of Electrical and Electronic Engineers
    • Harmonosky, C., 1995. Simulation-based real time scheduling: Review of recent developments. In: C. Alexopoulos, K. Kang, W.R. Lilegdon and D. Goldsman, eds. Proceedings of the 1995 winter simulation conference, 3-6 December 1995, Arlington, VA. Piscataway, New Jersey: Institute of Electrical and Electronic Engineers. 220-225.
    • (1995) Proceedings of the 1995 Winter Simulation Conference , pp. 220-225
    • Harmonosky, C.1
  • 8
    • 0026365483 scopus 로고
    • Real-time control of a manufacturing cell using knowledge-based simulation
    • Manivannan, S. and Banks, J., 1991. Real-time control of a manufacturing cell using knowledge-based simulation. In: B.L. Nelson, W.D. Kelton, and G.M. Clark, eds. Proceedings of the 1991 winter simulation conference, 8-11 December 1991, Phoenix, AZ. Piscataway, New Jersey: Institute of Electrical and Electronic Engineers. 251-260. (Pubitemid 23574486)
    • (1991) Winter Simulation Conference Proceedings , pp. 251-260
    • Manivannan, S.1    Banks Jerry2
  • 9
    • 0002312694 scopus 로고
    • Real-time simulation for decision support in continuous flow manufacturing systems
    • J.J. Swain, D. Goldsman, R.C. Crain and J.R. Wilson, eds., 13-16 December 1992, Arlington, VA. Piscataway, New Jersey: Institute of Electrical and Electronic Engineers
    • McConnell, P. and Medeiros, D., 1992. Real-time simulation for decision support in continuous flow manufacturing systems. In: J.J. Swain, D. Goldsman, R.C. Crain and J.R. Wilson, eds. Proceedings of the 1992 winter simulation conference, 13-16 December 1992, Arlington, VA. Piscataway, New Jersey: Institute of Electrical and Electronic Engineers. 936-944.
    • (1992) Proceedings of the 1992 Winter Simulation Conference , pp. 936-944
    • McConnell, P.1    Medeiros, D.2
  • 10
    • 0012258315 scopus 로고    scopus 로고
    • Multiobjective dynamic scheduling using discrete event simulation
    • DOI 10.1080/09511920150216279
    • Sivakumar, A., 2001. Multiobjective dynamic scheduling using discrete event simulation. International Journal of Computer Integrated Manufacturing, 14 (2), 154-167. (Pubitemid 33665937)
    • (2001) International Journal of Computer Integrated Manufacturing , vol.14 , Issue.2 , pp. 154-167
    • Sivakumar, A.I.1
  • 11
    • 0035396337 scopus 로고    scopus 로고
    • Automatic simulation model generation for simulation-based, real-time shop floor control
    • DOI 10.1016/S0166-3615(01)00086-0, PII S0166361501000860
    • Son, Y. and Wysk, R., 2001. Automated simulation model generation for simulation-based, real-time shop floor control. Computers in Industry, 45, 291-308. (Pubitemid 32621585)
    • (2001) Computers in Industry , vol.45 , Issue.3 , pp. 291-308
    • Son, Y.J.1    Wysk, R.A.2
  • 12
    • 0342553545 scopus 로고
    • Order-release planning using variable lead times based on a backward simulation model
    • Watson, E., Medeiros, D., and Sadowski, R., 1995. Order-release planning using variable lead times based on a backward simulation model. International Journal of Production Research, 33 (10), 2867-2888.
    • (1995) International Journal of Production Research , vol.33 , Issue.10 , pp. 2867-2888
    • Watson, E.1    Medeiros, D.2    Sadowski, R.3
  • 13
    • 66149083523 scopus 로고    scopus 로고
    • Design and validation of heuristic algorithms for simulation-based scheduling of a semiconductor backend facility
    • Weigert, G., Klemmt, A., and Horn, S., 2009. Design and validation of heuristic algorithms for simulation-based scheduling of a semiconductor backend facility. International Journal of Production Research, 47 (8), 2165-2184.
    • (2009) International Journal of Production Research , vol.47 , Issue.8 , pp. 2165-2184
    • Weigert, G.1    Klemmt, A.2    Horn, S.3
  • 14
    • 0023868237 scopus 로고
    • Multi-pass expert control system - A control/scheduling structure for flexible manufacturing cells
    • Wu, S. and Wysk, R., 1988. Multi-pass expert control system-a control/scheduling structure for flexible manufacturing cells. Journal of Manufacturing Systems, 7 (2), 107-120. (Pubitemid 18651285)
    • (1988) Journal of Manufacturing Systems , vol.7 , Issue.2 , pp. 107-120
    • Wu Szu-Yung David1    Wysk Richard, A.2
  • 15
    • 0042204356 scopus 로고    scopus 로고
    • Integrated production planning and scheduling on automobile assembly lines
    • Yan, H., Xia, Q., Zhu, M., Liu, X., and Guo, Z., 2003. Integrated production planning and scheduling on automobile assembly lines. IIE Transactions, 35 (8), 711-725.
    • (2003) IIE Transactions , vol.35 , Issue.8 , pp. 711-725
    • Yan, H.1    Xia, Q.2    Zhu, M.3    Liu, X.4    Guo, Z.5
  • 16
    • 60949107906 scopus 로고    scopus 로고
    • Simulation-based optimisation of dispatching rules for semiconductor wafer fabrication system scheduling by the response surface methodology
    • Zhang, H., Jiang, Z., and Guo, G., 2009. 'Simulation-based optimisation of dispatching rules for semiconductor wafer fabrication system scheduling by the response surface methodology'. International Journal of Advanced Manufacturing Technology, 41, 110-121.
    • (2009) International Journal of Advanced Manufacturing Technology , vol.41 , pp. 110-121
    • Zhang, H.1    Jiang, Z.2    Guo, G.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.