Volumn 138, Issue 4, 2012, Pages 574-584
|
Using grouting of shield tunneling to reduce settlements of overlying tunnels: Case study in Shenzhen metro construction
|
Author keywords
Automatic monitoring system; EPB shield tunneling; Existing tunnels; Grouting through segment holes; Settlement control; Simultaneous backfilling grouting
|
Indexed keywords
AUTOMATIC MONITORING-SYSTEM;
CROWDED URBAN AREAS;
DESIGN METHOD;
DURING CONSTRUCTION;
EARTH PRESSURE BALANCED SHIELDS;
EPB SHIELD TUNNELING;
EXISTING TUNNEL;
GROUTING PRACTICE;
METRO CONSTRUCTION;
METRO LINES;
MOTORING SYSTEM;
OBSERVATIONAL METHOD;
OVERLYING TUNNEL;
SETTLEMENT CONTROL;
SHIELD TUNNELING;
CONCRETE CONSTRUCTION;
GROUTING;
MORTAR;
SHIELDING;
SUBWAYS;
TUNNELS;
|
EID: 84859911273
PISSN: 07339364
EISSN: None
Source Type: Journal
DOI: 10.1061/(ASCE)CO.1943-7862.0000455 Document Type: Article |
Times cited : (58)
|
References (5)
|