메뉴 건너뛰기




Volumn 26, Issue 2, 2012, Pages 259-269

Integrating simulation and ant colony optimization to improve the service facility layout in a station

Author keywords

Facilities; Pedestrians; Planning; Simulation

Indexed keywords

ANT COLONY OPTIMIZATION (ACO); FACILITY LAYOUT; HIGH-SPEED RAILWAYS; INTEGRATED MODELS; PEDESTRIANS; QUANTITATIVE EVALUATION; SIMULATION; SURROUNDING ENVIRONMENT;

EID: 84859528111     PISSN: 08873801     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CP.1943-5487.0000128     Document Type: Article
Times cited : (26)

References (53)
  • 1
    • 33646265738 scopus 로고    scopus 로고
    • Application of an ant algorithm for layout optimization of tree networks
    • 0305-215X, 10.1080/03052150600557783
    • Afshar, M. H., and Mario, M. A. (2006). Application of an ant algorithm for layout optimization of tree networks. Eng. Optim. 0305-215X, 38 (3), 353-369. 10.1080/03052150600557783
    • (2006) Eng. Optim. , vol.38 , Issue.3 , pp. 353-369
    • Afshar, M.H.1    Mario, M.A.2
  • 2
    • 0037799606 scopus 로고    scopus 로고
    • Development of an object-oriented pedestrian traffic flow simulation environment for transport terminal planning
    • 0197-6729, 10.1002/atr.5670370104
    • Anagnostopoulos, D., Karlaftis, M. G., and Nikolaidou, M. (2003). Development of an object-oriented pedestrian traffic flow simulation environment for transport terminal planning. J. Adv. Transp. 0197-6729, 37 (1), 83-103. 10.1002/atr.5670370104
    • (2003) J. Adv. Transp. , vol.37 , Issue.1 , pp. 83-103
    • Anagnostopoulos, D.1    Karlaftis, M.G.2    Nikolaidou, M.3
  • 3
    • 16244381382 scopus 로고    scopus 로고
    • Optimization of architectural layout by the improved genetic algorithm
    • 1392-3730.
    • Baušys, R., and Pankrašovait, I. (2005). Optimization of architectural layout by the improved genetic algorithm. J. Civil Eng. Manage. 1392-3730, 11 (1), 13-21.
    • (2005) J. Civil Eng. Manage. , vol.11 , Issue.1 , pp. 13-21
    • Baušys, R.1    Pankrašovait, I.2
  • 5
    • 58949090464 scopus 로고    scopus 로고
    • Construction imitating ants: Resource-unconstrained scheduling with artificial ants
    • 0926-5805 10.1016/j.autcon.2008.09.005
    • Christodoulou, S. (2009). Construction imitating ants: resource-unconstrained scheduling with artificial ants. Autom. Constr., 18 (3), 285-293. 0926-5805 10.1016/j.autcon.2008.09.005
    • (2009) Autom. Constr. , vol.18 , Issue.3 , pp. 285-293
    • Christodoulou, S.1
  • 6
    • 73349109790 scopus 로고    scopus 로고
    • Scheduling resource-constrained projects with ant colony optimization artificial agents
    • 0887-3801 10.1061/(ASCE)0887-3801(2010)24:1(45)
    • Christodoulou, S. (2010). Scheduling resource-constrained projects with ant colony optimization artificial agents. J. Comput. Civ. Eng., 24 (1), 45-55. 0887-3801 10.1061/(ASCE)0887-3801(2010)24:1(45)
    • (2010) J. Comput. Civ. Eng. , vol.24 , Issue.1 , pp. 45-55
    • Christodoulou, S.1
  • 7
    • 77954009880 scopus 로고    scopus 로고
    • Pipe routing through ant colony optimization
    • 1076-0342 10.1061/(ASCE)1076-0342(2010)16:2(149)
    • Christodoulou, S. E., and Ellinas, G. (2010). Pipe routing through ant colony optimization. J. Infrastruct. Syst., 16 (2), 149-159. 1076-0342 10.1061/(ASCE)1076-0342(2010)16:2(149)
    • (2010) J. Infrastruct. Syst. , vol.16 , Issue.2 , pp. 149-159
    • Christodoulou, S.E.1    Ellinas, G.2
  • 8
    • 34247172406 scopus 로고    scopus 로고
    • A comparison of floorplan design strategies in architecture and engineering
    • DOI 10.1016/j.autcon.2006.12.008, PII S0926580507000040
    • Del Ro-Cidoncha, M. G., Iglesias, J. E., and Martnez-Palacios, J. (2007). A comparison of floorplan design strategies in architecture and engineering. Autom. Constr., 16 (5), 559-568. 0926-5805 10.1016/j.autcon.2006.12.008 (Pubitemid 46584786)
    • (2007) Automation in Construction , vol.16 , Issue.5 , pp. 559-568
    • Del Rio-Cidoncha, M.G.1    Iglesias, J.E.2    Martinez-Palacios, J.3
  • 9
    • 33845405527 scopus 로고    scopus 로고
    • Optimization of the quadratic assignment problem using an ant colony algorithm
    • DOI 10.1016/j.amc.2006.05.073, PII S0096300306005753
    • Demirel, N., and Toksari, M. D. (2006). Optimization of the quadratic assignment problem using an ant colony algorithm. Appl. Math. Comput., 183 (1), 427-435. 0096-3003 10.1016/j.amc.2006.05.073 (Pubitemid 44908620)
    • (2006) Applied Mathematics and Computation , vol.183 , Issue.1 , pp. 427-435
    • Demirel, N.C.1    Toksari, M.D.2
  • 10
    • 0031122887 scopus 로고    scopus 로고
    • Ant colony system: A cooperative learning approach to the traveling salesman problem
    • PII S1089778X97033031
    • Dorigo, M., and Gambardella, L. M. (1997). Ant colony system: a cooperative learning approach to the traveling salesman problem. IEEE Trans. Evol. Comput., 1 (1), 53-66. 1089-778X 10.1109/4235.585892 (Pubitemid 127771018)
    • (1997) IEEE Transactions on Evolutionary Computation , vol.1 , Issue.1 , pp. 53-66
    • Dorigo, M.1    Gambardella, L.M.2
  • 13
    • 1942442125 scopus 로고    scopus 로고
    • Maintenance and repair decision making for infrastructure facilities without a deterioration model
    • DOI 10.1061/(ASCE)1076-0342(2004)10:1(1)
    • Durango-Cohen, P. L. (2004). Maintenance and repair decision making for infrastructure facilities without a deterioration model. J. Infrastruct. Syst. 1076-0342, 10 (1), 1-8. 10.1061/(ASCE)1076-0342(2004)10:1(1) (Pubitemid 38492868)
    • (2004) Journal of Infrastructure Systems , vol.10 , Issue.1 , pp. 1-8
    • Durango-Cohen, P.L.1
  • 14
    • 47749092071 scopus 로고    scopus 로고
    • New mathematical optimization model for construction site layout
    • 0733-9364, 10.1061/(ASCE)0733-9364(2008)134:8(653)
    • Easa, S. M., and Hossain, K. M. A. (2008). New mathematical optimization model for construction site layout. J. Constr. Eng. Manage. 0733-9364, 134 (8), 653-662. 10.1061/(ASCE)0733-9364(2008)134:8(653)
    • (2008) J. Constr. Eng. Manage. , vol.134 , Issue.8 , pp. 653-662
    • Easa, S.M.1    Hossain, K.M.A.2
  • 15
    • 14044260553 scopus 로고    scopus 로고
    • Designing facilities management needs into infrastructure projects: Case from a major hospital
    • DOI 10.1061/(ASCE)0887-3828(2003)17:1(43)
    • Edum-Fotwe, F. T., Egbu, C., and Gibb, A. G. F. (2003). Designing facilities management needs into infrastructure projects: case from a major hospital. J. Perform. Constr. Facil. 0887-3828, 17 (1), 43-50. 10.1061/(ASCE)0887-3828(2003)17:1(43) (Pubitemid 40274612)
    • (2003) Journal of Performance of Constructed Facilities , vol.17 , Issue.1 , pp. 43-50
    • Edum-Fotwe, F.T.1    Egbu, C.2    Gibb, A.G.F.3
  • 16
    • 10644230902 scopus 로고    scopus 로고
    • Soft computing applications in infrastructure management
    • DOI 10.1061/(ASCE)1076-0342(2004)10:4(157)
    • Flintsch, G. W., and Chen, C. (2004). Soft computing applications in infrastructure management. J. Infrastruct. Syst. 1076-0342, 10 (4), 157-166. 10.1061/(ASCE)1076-0342(2004)10:4(157) (Pubitemid 39660891)
    • (2004) Journal of Infrastructure Systems , vol.10 , Issue.4 , pp. 157-166
    • Flintsch, G.W.1    Chen, C.2
  • 19
    • 0033156961 scopus 로고    scopus 로고
    • EvoSite: Evolution-based model for site layout planning
    • 0887-3801, 10.1061/(ASCE)0887-3801(1999)13:3(198)
    • Hegazy, T., and Elbeltagi, E. (1999). EvoSite: evolution-based model for site layout planning. J. Comput. Civ. Eng. 0887-3801, 13 (3), 198-206. 10.1061/(ASCE)0887-3801(1999)13:3(198)
    • (1999) J. Comput. Civ. Eng. , vol.13 , Issue.3 , pp. 198-206
    • Hegazy, T.1    Elbeltagi, E.2
  • 20
    • 35949007691 scopus 로고
    • Social force model for pedestrian dynamics
    • 1063-651X, 10.1103/PhysRevE.51.4282
    • Helbing, D., and Molnr, P. (1995). Social force model for pedestrian dynamics. Phys. Rev. E 1063-651X, 51 (5), 4282-4286. 10.1103/PhysRevE.51.4282
    • (1995) Phys. Rev. e , vol.51 , Issue.5 , pp. 4282-4286
    • Helbing, D.1    Molnr, P.2
  • 21
    • 84859522243 scopus 로고    scopus 로고
    • Discussion of Infrastructure obsolescence and design service life' by A. C. Lemer
    • 1076-0342, 10.1061/(ASCE)1076-0342(1997)3:3(127)
    • Hendrickson, C. T., and Horvath, A. (1997). Discussion of Infrastructure obsolescence and design service life' by A. C. Lemer. J. Infrastruct. Syst. 1076-0342, 3 (3), 127. 10.1061/(ASCE)1076-0342(1997)3:3(127)
    • (1997) J. Infrastruct. Syst. , vol.3 , Issue.3 , pp. 127
    • Hendrickson, C.T.1    Horvath, A.2
  • 23
    • 0032075246 scopus 로고    scopus 로고
    • An airport passenger terminal simulator: A planning and design tool
    • DOI 10.1016/S0928-4869(97)00018-9, PII S0928486997000189
    • Jim, H. K., and Chang, Z. Y. (1998). An airport passenger terminal simulator: A planning and design tool. Simul. Pract. Theory, 6 (4), 387-396. 09284869 10.1016/S0928-4869(97)00018-9 (Pubitemid 44933138)
    • (1998) Simulation Practice and Theory , vol.6 , Issue.4 , pp. 387-396
    • Hee, K.J.1    Zeph, Y.C.2
  • 24
    • 84859521320 scopus 로고    scopus 로고
    • A genetic algorithm module for spatial optimization in pedestrian simulation
    • W. W. F. Kingsch, C. Rogsch, A. Schadschneider, M. Schreckenberg, eds., Springer, Berlin.
    • Kellenberger, L., and Mller, R. (2010). A genetic algorithm module for spatial optimization in pedestrian simulation. Pedestrian and Evacuation Dynamics 2008, W. W. F. Kingsch, C. Rogsch, A. Schadschneider, M. Schreckenberg, eds., Springer, Berlin, 359-370.
    • (2010) Pedestrian and Evacuation Dynamics 2008 , pp. 359-370
    • Kellenberger, L.1    Mller, R.2
  • 25
    • 70349334592 scopus 로고    scopus 로고
    • Conjoining MMAS to GA to solve construction site layout planning problem
    • 0733-9364, 10.1061/(ASCE)0733-9364(2009)135:10(1049)
    • Lam, K. C., Ning, X., and Lam, M. C. K. (2009). Conjoining MMAS to GA to solve construction site layout planning problem. J. Constr. Eng. Manage. 0733-9364, 135 (10), 1049-1057. 10.1061/(ASCE)0733-9364(2009)135:10(1049)
    • (2009) J. Constr. Eng. Manage. , vol.135 , Issue.10 , pp. 1049-1057
    • Lam, K.C.1    Ning, X.2    Lam, M.C.K.3
  • 26
    • 70349288290 scopus 로고    scopus 로고
    • Optimizing schedule for improving the traffic impact of work zone on roads
    • 0926-5805, 10.1016/j.autcon.2009.05.004
    • Lee, H. Y. (2009). Optimizing schedule for improving the traffic impact of work zone on roads. Autom. Constr. 0926-5805, 18 (8), 1034-1044. 10.1016/j.autcon.2009.05.004
    • (2009) Autom. Constr. , vol.18 , Issue.8 , pp. 1034-1044
    • Lee, H.Y.1
  • 27
    • 84857356888 scopus 로고    scopus 로고
    • Legion International, London.
    • Legion Studio user manual. (2006). Legion International, London.
    • (2006) Legion Studio User Manual
  • 28
    • 0033880829 scopus 로고    scopus 로고
    • Genetic search for solving construction site-level unequal-area facility layout problems
    • DOI 10.1016/S0926-5805(99)00006-0
    • Li, H., and Love, P. E. D. (2000). Genetic search for solving construction site-level unequal-area facility layout problems. Autom. Constr. 0926-5805, 9 (2), 217-226. 10.1016/S0926-5805(99)00006-0 (Pubitemid 30541681)
    • (2000) Automation in construction , vol.9 , Issue.2 , pp. 217-226
    • Li, H.1    Love, P.E.D.2
  • 29
    • 34347354239 scopus 로고    scopus 로고
    • Supporting the design of office layout meeting ergonomics requirements
    • DOI 10.1016/j.apergo.2006.10.003, PII S0003687006001554
    • Margaritis, S., and Marmaras, N. (2007). Supporting the design of office layout meeting ergonomics requirements. Appl. Ergon. 0003-6870, 38 (6), 781-790. 10.1016/j.apergo.2006.10.003 (Pubitemid 47016346)
    • (2007) Applied Ergonomics , vol.38 , Issue.6 , pp. 781-790
    • Margaritis, S.1    Marmaras, N.2
  • 30
    • 34250635139 scopus 로고    scopus 로고
    • KB-GA-based hybrid system for layout planning of multistory buildings
    • DOI 10.1061/(ASCE)0887-3801(2007)21:4(229)
    • Mashood, P. K., Krishnamoorthy, C. S., and Ramamurthy, K. (2007). KB-GA-based hybrid system for layout planning of multistory buildings. J. Comput. Civ. Eng. 0887-3801, 21 (4), 229-237. 10.1061/(ASCE)0887-3801(2007)21: 4(229) (Pubitemid 46935004)
    • (2007) Journal of Computing in Civil Engineering , vol.21 , Issue.4 , pp. 229-237
    • Mashood, P.K.1    Krishnamoorthy, C.S.2    Ramamurthy, K.3
  • 31
    • 4344695708 scopus 로고    scopus 로고
    • Genetic algorithms for construction site layout in project planning
    • DOI 10.1061/(ASCE)0733-9364(2002)128:5(418)
    • Mawdesley, M. J., Al-jibouri, S. H., and Yang, H. (2002). Genetic algorithms for construction site layout in project planning. J. Constr. Eng. Manage. 0733-9364, 128 (5), 418-426. 10.1061/(ASCE)0733-9364(2002)128:5(418) (Pubitemid 40265526)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.5 , pp. 418-426
    • Mawdesley, M.J.1    Al-jibouri, S.H.2    Yang, H.3
  • 32
    • 23344442798 scopus 로고    scopus 로고
    • Hybrid ant systems for the dynamic facility layout problem
    • DOI 10.1016/j.cor.2004.08.008, PII S0305054804001984
    • McKendall, A. R., Jr., and Shang, J. (2006). Hybrid ant systems for the dynamic facility layout problem. Comput. Oper. Res. 0305-0548, 33 (3), 790-803. 10.1016/j.cor.2004.08.008 (Pubitemid 41101125)
    • (2006) Computers and Operations Research , vol.33 , Issue.3 , pp. 790-803
    • McKendall Jr., A.R.1    Shang, J.2
  • 33
    • 0026896683 scopus 로고
    • Emerging issues in transportation facilities management
    • 0733-947X, 10.1061/(ASCE)0733-947X(1992)118:4(477)
    • McNeil, S., Markow, M., Neumann, L., Ordway, J., and Uzarski, D. (1992). Emerging issues in transportation facilities management. J. Transp. Eng. 0733-947X, 118 (4), 477-495. 10.1061/(ASCE)0733-947X(1992)118:4(477)
    • (1992) J. Transp. Eng. , vol.118 , Issue.4 , pp. 477-495
    • McNeil, S.1    Markow, M.2    Neumann, L.3    Ordway, J.4    Uzarski, D.5
  • 34
    • 33747252173 scopus 로고    scopus 로고
    • Infrastructure condition assessment, deterioration modeling, and maintenance decision-making: Methodological advances and practical considerations
    • 1076-0342, 10.1061/(ASCE)1076-0342(2006)12:3(145)
    • Mishalani, R. G., and McCord, M. R. (2006). Infrastructure condition assessment, deterioration modeling, and maintenance decision-making: Methodological advances and practical considerations. J. Infrastruct. Syst. 1076-0342, 12 (3), 145-146. 10.1061/(ASCE)1076-0342(2006)12:3(145)
    • (2006) J. Infrastruct. Syst. , vol.12 , Issue.3 , pp. 145-146
    • Mishalani, R.G.1    McCord, M.R.2
  • 35
    • 49749102449 scopus 로고    scopus 로고
    • Optimizing construction time and cost using ant colony optimization approach
    • 0733-9364, 10.1061/(ASCE)0733-9364(2008)134:9(721)
    • Ng, S. T., and Zhang, Y. (2008). Optimizing construction time and cost using ant colony optimization approach. J. Constr. Eng. Manage. 0733-9364, 134 (9), 721-728. 10.1061/(ASCE)0733-9364(2008)134:9(721)
    • (2008) J. Constr. Eng. Manage. , vol.134 , Issue.9 , pp. 721-728
    • Ng, S.T.1    Zhang, Y.2
  • 36
    • 70449526183 scopus 로고    scopus 로고
    • Dynamic construction site layout planning using max-min ant system
    • 0926-5805, 10.1016/j.autcon.2009.09.002
    • Ning, X., Lam, K. C., and Lam, M. C. K. (2010). Dynamic construction site layout planning using max-min ant system. Autom. Constr. 0926-5805, 19 (1), 55-65. 10.1016/j.autcon.2009.09.002
    • (2010) Autom. Constr. , vol.19 , Issue.1 , pp. 55-65
    • Ning, X.1    Lam, K.C.2    Lam, M.C.K.3
  • 37
    • 0141990673 scopus 로고    scopus 로고
    • A hybrid CAD-based construction site layout planning system using genetic algorithms
    • 0926-5805, 10.1016/S0926-5805(03)00058-X
    • Osman, H. M., Georgy, M. E., and Ibrahim, M. E. (2003). A hybrid CAD-based construction site layout planning system using genetic algorithms. Autom. Constr. 0926-5805, 12 (6), 749-764. 10.1016/S0926-5805(03)00058-X
    • (2003) Autom. Constr. , vol.12 , Issue.6 , pp. 749-764
    • Osman, H.M.1    Georgy, M.E.2    Ibrahim, M.E.3
  • 38
    • 49549101087 scopus 로고    scopus 로고
    • Selection of the simulation software for the management of the operations at an international airport
    • 0950-7051, 10.1016/S0950-7051(03)00013-3
    • Otamendi, J., Pastor, J. M., and Garca, A. (2008). Selection of the simulation software for the management of the operations at an international airport. Simul. Modell. Pract. Theory 0950-7051, 16 (4), 191-203. 10.1016/S0950-7051(03)00013-3
    • (2008) Simul. Modell. Pract. Theory , vol.16 , Issue.4 , pp. 191-203
    • Otamendi, J.1    Pastor, J.M.2    Garca, A.3
  • 39
    • 4344700914 scopus 로고    scopus 로고
    • An accelerated-time simulation of departing passengers' flow in airport terminals
    • 0378-4754, 10.1016/j.matcom.2004.05.016
    • Roanes-Lozano, E., Laita, L. M., and Roanes-Macas, E. (2004). An accelerated-time simulation of departing passengers' flow in airport terminals. Math. Comput. Simul. 0378-4754, 67 (1-2), 163-172. 10.1016/j.matcom.2004.05.016
    • (2004) Math. Comput. Simul. , vol.67 , Issue.12 , pp. 163-172
    • Roanes-Lozano, E.1    Laita, L.M.2    Roanes-Macas, E.3
  • 40
    • 33745993946 scopus 로고    scopus 로고
    • The effect of a redesigned floor plan, occupant density and the quality of indoor climate on the cost of space, productivity and sick leave in an office building-A case study
    • DOI 10.1016/j.buildenv.2005.07.012, PII S0360132305002866
    • Saari, A., Tissari, T., Valkama, E., and Seppnen, O. (2006). The effect of a redesigned floor plan, occupant density and the quality of indoor climate on the cost of space, productivity and sick leave in an office building-a case study. Build. Environ. 0360-1323, 41 (12), 1961-1972. 10.1016/j.buildenv.2005. 07.012 (Pubitemid 44063903)
    • (2006) Building and Environment , vol.41 , Issue.12 , pp. 1961-1972
    • Saari, A.1    Tissari, T.2    Valkama, E.3    Seppanen, O.4
  • 41
    • 76649130183 scopus 로고    scopus 로고
    • Optimizing the planning of construction site security for critical infrastructure projects
    • 0926-5805, 10.1016/j.autcon.2009.10.005
    • Said, H., and El-Rayes, K. (2010). Optimizing the planning of construction site security for critical infrastructure projects. Autom. Constr. 0926-5805, 19 (2), 221-234. 10.1016/j.autcon.2009.10.005
    • (2010) Autom. Constr. , vol.19 , Issue.2 , pp. 221-234
    • Said, H.1    El-Rayes, K.2
  • 42
    • 45749148242 scopus 로고    scopus 로고
    • Optimal construction site layout considering safety and environmental aspects
    • 0733-9364, 10.1061/(ASCE)0733-9364(2008)134:7(536)
    • Sanad, H. M., Ammar, M. A., and Ibrahim, M. E. (2008). Optimal construction site layout considering safety and environmental aspects. J. Constr. Eng. Manage. 0733-9364, 134 (7), 536-544. 10.1061/(ASCE)0733-9364(2008) 134:7(536)
    • (2008) J. Constr. Eng. Manage. , vol.134 , Issue.7 , pp. 536-544
    • Sanad, H.M.1    Ammar, M.A.2    Ibrahim, M.E.3
  • 43
    • 78349288609 scopus 로고    scopus 로고
    • Passenger dynamics at airport terminal environment
    • W. W. F. Kingsch, C. Rogsch, A. Schadschneider, M. Schreckenberg, eds., Springer, Berlin.
    • Schultz, M., Schulz, C., and Fricke, H. (2010). Passenger dynamics at airport terminal environment. Pedestrian and Evacuation Dynamics 2008, W. W. F. Kingsch, C. Rogsch, A. Schadschneider, M. Schreckenberg, eds., Springer, Berlin, 381-396.
    • (2010) Pedestrian and Evacuation Dynamics 2008 , pp. 381-396
    • Schultz, M.1    Schulz, C.2    Fricke, H.3
  • 44
    • 75949098313 scopus 로고    scopus 로고
    • Methods for the prediction of intermediate activities by office occupants
    • 0360-1323, 10.1016/j.buildenv.2009.11.018
    • Tabak, V., and de Vries, B. (2010). Methods for the prediction of intermediate activities by office occupants. Build. Environ. 0360-1323, 45 (6), 1366-1372. 10.1016/j.buildenv.2009.11.018
    • (2010) Build. Environ. , vol.45 , Issue.6 , pp. 1366-1372
    • Tabak, V.1    De Vries, B.2
  • 45
    • 0026189990 scopus 로고
    • Robust taboo search for the quadratic assignment problem
    • Taillard, E. (1991). Robust taboo search for the quadratic assignment problem. Parallel Comput. 0167-8191, 17 (4-5), 443-455. 10.1016/S0167-8191(05) 80147-4 (Pubitemid 21695811)
    • (1991) Parallel Computing , vol.17 , Issue.4-5 , pp. 443-455
    • Taillard, E.1
  • 46
    • 0035154182 scopus 로고    scopus 로고
    • Parallel Ant Colonies for the quadratic assignment problem
    • DOI 10.1016/S0167-739X(99)00124-7
    • Talbi, E. G., Roux, O., Fonlupt, C., and Robillard, D. (2001). Parallel ant colonies for the quadratic assignment problem. Future Gener. Comput. Syst. 0167-739X, 17 (4), 441-449. 10.1016/S0167-739X(99)00124-7 (Pubitemid 32092215)
    • (2001) Future Generation Computer Systems , vol.17 , Issue.4 , pp. 441-449
    • Talbi, E.-G.1    Roux, O.2    Fonlupt, C.3    Robillard, D.4
  • 47
    • 2342435265 scopus 로고    scopus 로고
    • Site layout planning using nonstructural fuzzy decision support system
    • DOI 10.1061/(ASCE)0733-9364(2002)128:3(220)
    • Tam, C. M., Tong, T. K. L., Leung, A. W. T., and Chiu, G. W. C. (2002). Site layout planning using nonstructural fuzzy decision support system. J. Constr. Eng. Manage. 0733-9364, 128 (3), 220-231. 10.1061/(ASCE)0733-9364(2002) 128:3(220) (Pubitemid 40265547)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.3 , pp. 220-231
    • Tam, C.M.1    Tong, T.K.L.2    Leung, A.W.T.3    Chiu, G.W.C.4
  • 48
    • 1642339701 scopus 로고    scopus 로고
    • Determination of service levels for passenger orientation in Hong Kong International Airport
    • DOI 10.1016/j.jairtraman.2003.10.011, PII S0969699703000851
    • Tam, M., and Lam, W. H. K. (2004). Determination of service levels for passenger orientation in Hong Kong International Airport. J. Air Transp. Manage. 0969-6997, 10 (3), 181-189. 10.1016/j.jairtraman.2003.10.011 (Pubitemid 38356047)
    • (2004) Journal of Air Transport Management , vol.10 , Issue.3 , pp. 181-189
    • Tam, M.-L.1    Lam, W.H.K.2
  • 49
    • 38149009704 scopus 로고    scopus 로고
    • Applying an ant colony optimization algorithm-based multiobjective approach for time-cost trade-off
    • 0733-9364, 10.1061/(ASCE)0733-9364(2008)134:2(153)
    • Xiong, Y., and Kuang, Y. (2008). Applying an ant colony optimization algorithm-based multiobjective approach for time-cost trade-off. J. Constr. Eng. Manage. 0733-9364, 134 (2), 153-156. 10.1061/(ASCE)0733-9364(2008)134:2(153)
    • (2008) J. Constr. Eng. Manage. , vol.134 , Issue.2 , pp. 153-156
    • Xiong, Y.1    Kuang, Y.2
  • 50
    • 60649114307 scopus 로고    scopus 로고
    • Integrated scheme for Olympic village traffic and parking arrangements
    • 1076-0342, 10.1061/(ASCE)1076-0342(2009)15:1(40)
    • Yannis, G., Golias, J., Spyropoulou, I., and Rogan, A. (2009). Integrated scheme for Olympic village traffic and parking arrangements. J. Infrastruct. Syst. 1076-0342, 15 (1), 40-49. 10.1061/(ASCE)1076-0342(2009)15:1(40)
    • (2009) J. Infrastruct. Syst. , vol.15 , Issue.1 , pp. 40-49
    • Yannis, G.1    Golias, J.2    Spyropoulou, I.3    Rogan, A.4
  • 51
    • 49749097235 scopus 로고    scopus 로고
    • Particle swarm optimization for construction site unequal-area layout
    • 0733-9364, 10.1061/(ASCE)0733-9364(2008)134:9(739)
    • Zhang, H., and Wang, J. Y. (2008). Particle swarm optimization for construction site unequal-area layout. J. Constr. Eng. Manage. 0733-9364, 134 (9), 739-748. 10.1061/(ASCE)0733-9364(2008)134:9(739)
    • (2008) J. Constr. Eng. Manage. , vol.134 , Issue.9 , pp. 739-748
    • Zhang, H.1    Wang, J.Y.2
  • 52
    • 0036680436 scopus 로고    scopus 로고
    • Hybrid intelligence utilization for construction site layout
    • DOI 10.1016/S0926-5805(01)00071-1, PII S0926580501000711
    • Zhang, J. P., Liu, L. H., and Coble, R. J. (2002). Hybrid intelligence utilization for construction site layout. Autom. Constr. 0926-5805, 11 (5), 511-519. 10.1016/S0926-5805(01)00071-1 (Pubitemid 34649086)
    • (2002) Automation in Construction , vol.11 , Issue.5 , pp. 511-519
    • Zhang, J.P.1    Liu, L.H.2    Coble, R.J.3
  • 53
    • 2342444431 scopus 로고    scopus 로고
    • Genetic algorithm for solving site layout problem with unequal-size and constrained facilities
    • DOI 10.1061/(ASCE)0887-3801(2002)16:2(143)
    • Zouein, P. P., Harmanani, H., and Hajar, A. (2002). Genetic algorithm for solving site layout problem with unequal-size and constrained facilities. J. Comput. Civ. Eng. 0887-3801, 16 (2), 143-151. 10.1061/(ASCE)0887-3801(2002)16: 2(143) (Pubitemid 40475289)
    • (2002) Journal of Computing in Civil Engineering , vol.16 , Issue.2 , pp. 143-151
    • Zouein, P.P.1    Harmanani, H.2    Hajar, A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.