메뉴 건너뛰기




Volumn 43, Issue 6, 2012, Pages 1146-1156

Reliability-based measures for a system with an uncertain parameter environment

Author keywords

Availability; Mean time to failure; Membership functions; Uncertain parameters; Unreliable service station

Indexed keywords

CRISP INTERVAL; EXPONENTIAL DISTRIBUTIONS; FUZZY ENVIRONMENTS; MEAN TIME TO FAILURE; NONLINEAR PROGRAMS; NUMERICAL EXAMPLE; PARAMETER SPACES; REPAIRABLE SYSTEMS; SYSTEM CHARACTERISTICS; UNCERTAIN PARAMETERS; UNRELIABLE SERVICE STATION;

EID: 84859359113     PISSN: 00207721     EISSN: 14645319     Source Type: Journal    
DOI: 10.1080/00207721.2010.545489     Document Type: Article
Times cited : (13)

References (38)
  • 1
    • 70350572885 scopus 로고    scopus 로고
    • On the use of uncertainty importance measures in reliability and risk analysis
    • Aven, T., and Nøkland, T.E. (2010), 'On the Use of Uncertainty Importance Measures in Reliability and Risk Analysis', Reliability Engineering and System Safety, 95, 127-133.
    • (2010) Reliability Engineering and System Safety , vol.95 , pp. 127-133
    • Aven, T.1    Nøkland, T.E.2
  • 2
    • 0000042191 scopus 로고    scopus 로고
    • System failure engineering and fuzzy methodology: An introductory overview
    • Cai, K.Y. (1996), 'System Failure Engineering and Fuzzy Methodology: An Introductory Overview', Fuzzy Sets and Systems, 83, 113-133.
    • (1996) Fuzzy Sets and Systems , vol.83 , pp. 113-133
    • Cai, K.Y.1
  • 3
    • 36049046129 scopus 로고    scopus 로고
    • Fuzzy universal generating functions for multi-state system reliability assessment
    • DOI 10.1016/j.fss.2007.06.004, PII S0165011407002692
    • Ding, Y., and Lisnianski, A. (2008), 'Fuzzy Universal Generating Functions for Multi-state System Reliability Assessment', Fuzzy Sets and Systems, 159, 307-324. (Pubitemid 350086689)
    • (2008) Fuzzy Sets and Systems , vol.159 , Issue.3 , pp. 307-324
    • Ding, Y.1    Lisnianski, A.2
  • 4
    • 57749171830 scopus 로고    scopus 로고
    • Fuzzy multi-state systems: General definitions, and performance assessment
    • Ding, Y., Zuo, M.J., Lisnianski, A., and Tian, Z. (2008), 'Fuzzy Multi-state Systems: General Definitions, and Performance Assessment', IEEE Transactions on Reliability, 57, 589-594.
    • (2008) IEEE Transactions on Reliability , vol.57 , pp. 589-594
    • Ding, Y.1    Zuo, M.J.2    Lisnianski, A.3    Tian, Z.4
  • 7
    • 0033371059 scopus 로고    scopus 로고
    • Discrete Markov chains - An analytical tool for productivity analysis of surface mining systems
    • Gupta, S., and Bhattacharya, J. (1999), 'Discrete Markov Chains-An Analytical Tool for Productivity Analysis of Surface Mining Systems', International Journal of Surface Mining, Reclamation and Environment, 13, 111-116. (Pubitemid 30054569)
    • (1999) International Journal of Surface Mining, Reclamation and Environment , vol.13 , Issue.3 , pp. 111-116
    • Gupta, S.1    Bhattacharya, J.2
  • 8
    • 35948965969 scopus 로고    scopus 로고
    • Reliability analysis of a conveyor system using hybrid data
    • DOI 10.1002/qre.843
    • Gupta, S., and Bhattacharya, J. (2007), 'Reliability Analysis of a Conveyor System Using Hybrid Data', Quality and Reliability Engineering International, 23, 867-882. (Pubitemid 350072700)
    • (2007) Quality and Reliability Engineering International , vol.23 , Issue.7 , pp. 867-882
    • Gupta, S.1    Bhattacharya, J.2
  • 10
    • 59749086248 scopus 로고    scopus 로고
    • Geneticalgorithm-based optimal apportionment of reliability and redundancy under multiple objectives
    • Huang, H.Z., Qu, J., and Zuo, M.J. (2009), 'Geneticalgorithm-based Optimal Apportionment of Reliability and Redundancy Under Multiple Objectives', IIE Transactions, 41, 287-298.
    • (2009) IIE Transactions , vol.41 , pp. 287-298
    • Huang, H.Z.1    Qu, J.2    Zuo, M.J.3
  • 13
    • 53349091918 scopus 로고    scopus 로고
    • Reliability-based measure for a system with standbys subject to switching failures
    • Ke, J.-B., Lee, W.-C., and Ke, J.-C. (2008), 'Reliability-based Measure for a System with Standbys Subject to Switching Failures', Engineering Computations, 25, 694-706.
    • (2008) Engineering Computations , vol.25 , pp. 694-706
    • Ke, J.-B.1    Lee, W.-C.2    Ke, J.-C.3
  • 14
    • 74449085047 scopus 로고    scopus 로고
    • Simulation inferences for an availability system with general repair distribution and imperfect fault coverage
    • Ke, J.-C., Su, Z.-L., Wang, K.-H., and Hsu, Y.-L. (2010), 'Simulation Inferences for an Availability System with General Repair Distribution and Imperfect Fault Coverage', Simulation Modelling Practice and Theory, 18, 338-347.
    • (2010) Simulation Modelling Practice and Theory , vol.18 , pp. 338-347
    • Ke, J.-C.1    Su, Z.-L.2    Wang, K.-H.3    Hsu, Y.-L.4
  • 16
    • 75649098221 scopus 로고    scopus 로고
    • Bayesian assessing for a repairable system with standby imperfect switching and reboot delay
    • Lee, S.-L., Ke, J.-C., and Hsu, Y.-L. (2009), 'Bayesian Assessing for a Repairable System with Standby Imperfect Switching and Reboot Delay', International Journal of Systems Science, 40, 1149-1159.
    • (2009) International Journal of Systems Science , vol.40 , pp. 1149-1159
    • Lee, S.-L.1    Ke, J.-C.2    Hsu, Y.-L.3
  • 17
    • 67949112661 scopus 로고    scopus 로고
    • Redundancy analysis for repairable multi-state system by using combined stochastic processes methods and universal generating function technique
    • Lisnianski, A., and Ding, Y. (2009), 'Redundancy Analysis for Repairable Multi-state System by Using Combined Stochastic Processes Methods and Universal Generating Function Technique', Reliability Engineering and System Safety, 94, 1788-1795.
    • (2009) Reliability Engineering and System Safety , vol.94 , pp. 1788-1795
    • Lisnianski, A.1    Ding, Y.2
  • 18
    • 77951098701 scopus 로고    scopus 로고
    • Reliability assessment for fuzzy multi-state systems
    • Liu, Y., and Huang, H.Z. (2010), 'Reliability Assessment for Fuzzy Multi-state Systems', International Journal of Systems Science, 41, 365-379.
    • (2010) International Journal of Systems Science , vol.41 , pp. 365-379
    • Liu, Y.1    Huang, H.Z.2
  • 19
    • 77954344179 scopus 로고    scopus 로고
    • Optimal preventive maintenance policy under fuzzy bayesian reliability assessment environments
    • Liu, Y., Li, Y.F., Huang, H.Z., Zuo, M.J., and Sun, Z.Q. (2010), 'Optimal Preventive Maintenance Policy Under Fuzzy Bayesian Reliability Assessment Environments', IIE Transactions, 42, 734-745.
    • (2010) IIE Transactions , vol.42 , pp. 734-745
    • Liu, Y.1    Li, Y.F.2    Huang, H.Z.3    Zuo, M.J.4    Sun, Z.Q.5
  • 21
    • 77949484924 scopus 로고    scopus 로고
    • Hybrid probabilistic fuzzy and non-probabilistic model of structural reliability
    • Ni, Z., and Qiu, Z.P. (2010), 'Hybrid Probabilistic Fuzzy and Non-probabilistic Model of Structural Reliability', Computers and Industrial Engineering, 58, 463-467.
    • (2010) Computers and Industrial Engineering , vol.58 , pp. 463-467
    • Ni, Z.1    Qiu, Z.P.2
  • 22
    • 77955917223 scopus 로고    scopus 로고
    • Using expert models in human reliability analysis - A dependence assessment method based on fuzzy logic
    • Podofillini, L., Dang, V., Zio, E., Baraldi, P., and Librizzi, M. (2010), 'Using Expert Models in Human Reliability Analysis-A Dependence Assessment Method Based on Fuzzy Logic', Risk Analysis, 30, 1277-1297.
    • (2010) Risk Analysis , vol.30 , pp. 1277-1297
    • Podofillini, L.1    Dang, V.2    Zio, E.3    Baraldi, P.4    Librizzi, M.5
  • 23
    • 0039831443 scopus 로고
    • An outline of fuzzy or possibilistic models for queueing systems
    • eds. P.P. Wang and S.K. Chang, New York: Plenum Press
    • Prade, H.M. (1980), 'An Outline of Fuzzy or Possibilistic Models for Queueing Systems', in Fuzzy Sets, eds. P.P. Wang and S.K. Chang, New York: Plenum Press.
    • (1980) Fuzzy Sets
    • Prade, H.M.1
  • 24
    • 0037401554 scopus 로고    scopus 로고
    • Lifetime and reliability estimation of repairable redundant system subject to periodic alternation
    • Seo, J.H., Jang, J.S., and Bai, D.S. (2003), 'Lifetime and Reliability Estimation of Repairable Redundant System Subject to Periodic Alternation', Reliability Engineering and System Safety, 80, 197-204.
    • (2003) Reliability Engineering and System Safety , vol.80 , pp. 197-204
    • Seo, J.H.1    Jang, J.S.2    Bai, D.S.3
  • 26
    • 84952240555 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry (i): System characteristics, performance evaluation and production planning
    • Uzsoy, R., Lee, C.-Y., and Martin-Vega, L.A. (1992), 'A Review of Production Planning and Scheduling Models in the Semiconductor Industry (I): System Characteristics, Performance Evaluation and Production Planning', IIE Transactions, 24, 47-60.
    • (1992) IIE Transactions , vol.24 , pp. 47-60
    • Uzsoy, R.1    Lee, C.-Y.2    Martin-Vega, L.A.3
  • 27
    • 0028496979 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry (ii): Shop-floor control
    • Uzsoy, R., Lee, C.-Y., and Martin-Vega, L.A. (1994), 'A review of Production Planning and Scheduling Models in the Semiconductor Industry (II): Shop-floor Control', IIE Transactions, 26, 44-55.
    • (1994) IIE Transactions , vol.26 , pp. 44-55
    • Uzsoy, R.1    Lee, C.-Y.2    Martin-Vega, L.A.3
  • 28
    • 59649111532 scopus 로고    scopus 로고
    • On reliability estimation based on fuzzy lifetime data
    • Viertl, R. (2009), 'On Reliability Estimation Based on Fuzzy Lifetime Data', Journal of Statistical Planning and Inference, 139, 1750-1755.
    • (2009) Journal of Statistical Planning and Inference , vol.139 , pp. 1750-1755
    • Viertl, R.1
  • 29
    • 67949108022 scopus 로고    scopus 로고
    • Comparative analysis of availability between three system with general repair times, reboot delay and switching failures
    • Wang, K.-H., and Chen, Y.-J. (2009), 'Comparative Analysis of Availability between Three System with General Repair Times, Reboot Delay and Switching Failures', Applied Mathematics and Computation, 215, 384-394.
    • (2009) Applied Mathematics and Computation , vol.215 , pp. 384-394
    • Wang, K.-H.1    Chen, Y.-J.2
  • 30
    • 54049100077 scopus 로고    scopus 로고
    • A conditionbased replacement and spare provisioning policy for deteriorating systems with uncertain deterioration to failure
    • Wang, L., Chu, J., and Mao, W.J. (2009), 'A Conditionbased Replacement and Spare Provisioning Policy for Deteriorating Systems with Uncertain Deterioration to Failure', European Journal of Operational Research, 194, 184-205.
    • (2009) European Journal of Operational Research , vol.194 , pp. 184-205
    • Wang, L.1    Chu, J.2    Mao, W.J.3
  • 31
    • 33846650926 scopus 로고    scopus 로고
    • Reliability and sensitivity analysis of a repairable system with warm standbys and r unreliable service stations
    • 1223-1232
    • Wang, K.-H., Ke, J.-B., and Lee, W.-C. (2007), 'Reliability and Sensitivity Analysis of a Repairable System with Warm Standbys and R Unreliable Service Stations', International Journal of Advanced Manufacturing Technology, 31, 11-12, 1223-1232.
    • (2007) International Journal of Advanced Manufacturing Technology , vol.31 , pp. 11-12
    • Wang, K.-H.1    Ke, J.-B.2    Lee, W.-C.3
  • 32
    • 0031541831 scopus 로고    scopus 로고
    • Fuzzy reliability analysis based on closed fuzzy numbers
    • Wu, H.C. (1997), 'Fuzzy Reliability Analysis Based on Closed Fuzzy Numbers', Information Sciences, 103, 35-159.
    • (1997) Information Sciences , vol.103 , pp. 35-159
    • Wu, H.C.1
  • 33
    • 2342624094 scopus 로고    scopus 로고
    • Fuzzy reliability estimation using bayesian approach
    • Wu, H.-C. (2004), 'Fuzzy Reliability Estimation Using Bayesian Approach', Computers and Industrial Engineering, 46, 467-493.
    • (2004) Computers and Industrial Engineering , vol.46 , pp. 467-493
    • Wu, H.-C.1
  • 34
    • 16644375684 scopus 로고    scopus 로고
    • Bayesian study of a two-component system with common-cause shock failures
    • DOI 10.1142/S0217595905000480
    • Yadavalli, V.S.S., Bekker, A., and Pauw, J. (2005), 'Bayesian Study of a Two-component System with Common-cause Shock Failures', Asia-Pacific Journal of Operational Research, 22, 105-119. (Pubitemid 40479476)
    • (2005) Asia-Pacific Journal of Operational Research , vol.22 , Issue.1 , pp. 105-119
    • Yadavalli, V.S.S.1    Bekker, A.2    Pauw, J.3
  • 35
    • 0036874572 scopus 로고    scopus 로고
    • Asymptotic confidence limits for the steady-state availability of a two-unit parallel system with preparation time for the repair facility
    • Yadavalli, V.S.S., Botha, M., and Bekker, A. (2002), 'Asymptotic Confidence Limits for the Steady-state Availability of a Two-unit Parallel System with Preparation Time for the Repair Facility', Asia-Pacific Journal of Operational Research, 19, 249-256.
    • (2002) Asia-Pacific Journal of Operational Research , vol.19 , pp. 249-256
    • Yadavalli, V.S.S.1    Botha, M.2    Bekker, A.3
  • 36
    • 49349133217 scopus 로고
    • Fuzzy sets as a basis for a theory of possibility
    • Zadeh, L.A. (1978), 'Fuzzy Sets as a Basis for a Theory of Possibility', Fuzzy Sets and Systems, 1, 3-28.
    • (1978) Fuzzy Sets and Systems , vol.1 , pp. 3-28
    • Zadeh, L.A.1
  • 38
    • 70349470960 scopus 로고    scopus 로고
    • A data-driven fuzzy approach for predicting the remaining useful life in dynamic failure scenarios of a nuclear system
    • Zio, E., and Di Maio, F. (2010), 'A Data-driven Fuzzy Approach for Predicting the Remaining Useful Life in Dynamic Failure Scenarios of a Nuclear System', Reliability Engineering and System Safety, 95, 49-57.
    • (2010) Reliability Engineering and System Safety , vol.95 , pp. 49-57
    • Zio, E.1    Di Maio, F.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.