메뉴 건너뛰기




Volumn 468-471, Issue , 2012, Pages 2559-2564

Risk analysis of BOT finance mode on hydropower projects based on analytic hierarchy process - Case study of Xi He hydropower station in Anhui Province

Author keywords

AHP method; BOT; Risk evaluation

Indexed keywords

AHP METHOD; ANHUI PROVINCE; BOT; CASCADE HYDROPOWER STATIONS; EFFECTIVE TOOL; HYDROPOWER PROJECTS; HYDROPOWER STATIONS; QUALITATIVE ANALYSIS; RISK EVALUATION;

EID: 84859228467     PISSN: 10226680     EISSN: None     Source Type: Book Series    
DOI: 10.4028/www.scientific.net/AMR.468-471.2559     Document Type: Conference Paper
Times cited : (5)

References (5)
  • 1
    • 84859230588 scopus 로고    scopus 로고
    • Kunming: Yunnan Science and Technology Press 7. (in Chinese)
    • Minzheng Wang, Songjiang Wang. BOT Project Implementation Guide [M]. Kunming: Yunnan Science and Technology Press, 2002.7. (in Chinese)
    • (2002) BOT Project Implementation Guide [M]
    • Wang, M.1    Wang, S.2
  • 5
    • 84859233672 scopus 로고    scopus 로고
    • Effect and experience about anhui province's rural hydropower construction
    • (in Chinese)
    • Yeping Xu, Youzhi Yang. Effect and experience about Anhui province's rural hydropower construction. China's water and electrification, 2010(11), p. 1 (in Chinese)
    • (2010) China's Water and Electrification , Issue.11 , pp. 1
    • Xu, Y.1    Yang, Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.