메뉴 건너뛰기




Volumn , Issue , 2005, Pages

Risk factors leading to cost over-run in highway projects

Author keywords

Client; Estimating; Government; Highways; Risk

Indexed keywords

AUSTRALIA; CLIENT; CONSTRUCTION INNOVATION; CONSTRUCTION PROJECTS; COOPERATIVE RESEARCH CENTRES; COST OVERRUNS; ESTIMATING; GOVERNMENT; HIGHWAY CONSTRUCTION; HIGHWAY PROJECTS; HIGHWAYS; POSSIBLE SOLUTIONS; PROJECT COST; PUBLIC DATA; QUEENSLAND; RISK FACTORS;

EID: 84859041090     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (6)

References (25)
  • 1
  • 5
    • 9144241597 scopus 로고    scopus 로고
    • National Cooperative Highway Research Program Synthesis of Highway Practice: 214. Washington, D.C, Transportation Research Board, National Research Council
    • Bramble, B. B. and M. D. Cipollini (1998). Resolution of disputes to avoid construction claims. National Cooperative Highway Research Program Synthesis of Highway Practice: 214. Washington, D.C, Transportation Research Board, National Research Council.
    • (1998) Resolution of Disputes to Avoid Construction Claims
    • Bramble, B.B.1    Cipollini, M.D.2
  • 6
    • 0036162657 scopus 로고    scopus 로고
    • Reasons for cost and schedule increases for engineering design projects
    • January 2002
    • Chang, A. S.-T. (2002). "Reasons for cost and schedule increases for engineering design projects." Journal of Management in Engineering January 2002.
    • (2002) Journal of Management in Engineering
    • Chang, A.S.-T.1
  • 7
    • 84859082750 scopus 로고
    • 1995 Offshore Technology Conference Proceedings, Houston, TX
    • Curole, M. A. (1995). Mars Risk Management Program. 1995 Offshore Technology Conference Proceedings, Houston, TX.
    • (1995) Mars Risk Management Program
    • Curole, M.A.1
  • 8
    • 0003035899 scopus 로고    scopus 로고
    • The dark side of planning: Rationality and 'realrationalisation
    • S. Mandelbaum, L. Mazza and Burchell R: eds. New Brunswick, N.J., Centre for Urban Policy Research Press
    • Flyvbjerg, B. (1996). The dark side of planning: Rationality and 'realrationalisation'. Explorations in planning theory. S. Mandelbaum, L. Mazza and Burchell R: eds. New Brunswick, N.J., Centre for Urban Policy Research Press: 383-94.
    • (1996) Explorations in Planning Theory , pp. 383-394
    • Flyvbjerg, B.1
  • 11
    • 0000794253 scopus 로고    scopus 로고
    • Neural network model for parametric cost estimation of highway projects
    • May/June 1998
    • Hegazy, T. and A. Ayed (1998). "Neural network model for parametric cost estimation of highway projects." Journal of Construction Engineering and Management May/June 1998: 210-18.
    • (1998) Journal of Construction Engineering and Management , pp. 210-218
    • Hegazy, T.1    Ayed, A.2
  • 13
    • 0007799737 scopus 로고    scopus 로고
    • Common categories and causes of construction claims
    • Kumaraswamy, M. M. (1997). "Common categories and causes of construction claims." Construction Law Journal 13(1): 21-34.
    • (1997) Construction Law Journal , vol.13 , Issue.1 , pp. 21-34
    • Kumaraswamy, M.M.1
  • 15
    • 14544291098 scopus 로고    scopus 로고
    • Programmatic cost risk analysis for highway megaprojects
    • Molenaar, K. R. (2005). "Programmatic cost risk analysis for highway megaprojects." Journal of Construction Engineering and Management 131(3): 343-53.
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.3 , pp. 343-353
    • Molenaar, K.R.1
  • 16
    • 0004158280 scopus 로고
    • National Audit Office/Department of Transport London, National Audit Office
    • National Audit Office/Department of Transport (1992). Contracting for roads. London, National Audit Office.
    • (1992) Contracting for Roads
  • 17
    • 0033041518 scopus 로고    scopus 로고
    • How reliable are estimates of infrastructure costs/ A comparative analysis
    • Nijkamp, P. and B. Ubbels (1999). "How reliable are estimates of infrastructure costs/ A comparative analysis." International Journal of Transport Economics 26(1): 23-53.
    • (1999) International Journal of Transport Economics , vol.26 , Issue.1 , pp. 23-53
    • Nijkamp, P.1    Ubbels, B.2
  • 20
    • 0342762131 scopus 로고
    • Knowledge based approaches to construction risk analysis
    • CIB W55 and W95, Laboratorio Nacional de Engenharia Civil, Lisboa, Portugal
    • Raftery, J. and S. T. Ng (1993). Knowledge Based Approaches to Construction Risk Analysis. International Symposium on Electronic Evaluation and the Built Environment, CIB W55 and W95, Laboratorio Nacional de Engenharia Civil, Lisboa, Portugal.
    • (1993) International Symposium on Electronic Evaluation and the Built Environment
    • Raftery, J.1    Ng, S.T.2
  • 23
    • 14744304262 scopus 로고    scopus 로고
    • Risk allocation and risk handling of highway projects in Taiwan
    • Wang, M.-T. and H.-Y. Chou (2003). "Risk allocation and risk handling of highway projects in Taiwan." Journal of Management in Engineering 19(2): 60-68.
    • (2003) Journal of Management in Engineering , vol.19 , Issue.2 , pp. 60-68
    • Wang, M.-T.1    Chou, H.-Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.