메뉴 건너뛰기




Volumn 34, Issue , 2012, Pages 498-506

A network-based approach for evaluating and ranking transportation roadway projects

Author keywords

Network robustness; Network topology; Network trip robustness (NTR); Project prioritization; System based performance evaluation; Transportation

Indexed keywords


EID: 84858725597     PISSN: 01436228     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.apgeog.2012.01.010     Document Type: Article
Times cited : (23)

References (21)
  • 1
    • 84255168540 scopus 로고    scopus 로고
    • Integrating travel demand model and benefit-cost analysis for evaluation of new capacity highway projects
    • An, M., Casper, C., Integrating travel demand model and benefit-cost analysis for evaluation of new capacity highway projects. Transportation Research Record: Journal of the Transportation Research Board 2244 (2011), 34–40.
    • (2011) Transportation Research Record: Journal of the Transportation Research Board , vol.2244 , pp. 34-40
    • An, M.1    Casper, C.2
  • 2
    • 33846823924 scopus 로고    scopus 로고
    • Evaluation, prioritization and selection of transportation investment projects in New York City
    • Berechman, J., Paaswell, R.E., Evaluation, prioritization and selection of transportation investment projects in New York City. Transportation 32 (2005), 223–249.
    • (2005) Transportation , vol.32 , pp. 223-249
    • Berechman, J.1    Paaswell, R.E.2
  • 4
    • 74449085566 scopus 로고    scopus 로고
    • The broader effects of transportation infrastructure: spatial econometrics and productivity approaches
    • Cohen, J.P., The broader effects of transportation infrastructure: spatial econometrics and productivity approaches. Transportation Research Part E: Logistics and Transportation Review 46 (2010), 317–326.
    • (2010) Transportation Research Part E: Logistics and Transportation Review , vol.46 , pp. 317-326
    • Cohen, J.P.1
  • 5
    • 79956188225 scopus 로고    scopus 로고
    • Our nation's highways, 2008
    • Accessed 03.06.11
    • FHWA (US Department of Transportation, Federal Highway Administration), Our nation's highways, 2008. 2008 http://www.fhwa.dot.gov/policyinformation/pubs/pl08021/index.cfm Accessed 03.06.11.
    • (2008)
  • 6
    • 85043729240 scopus 로고    scopus 로고
    • Highway safety improvement manual
    • FHWA-SA-09–029 Accessed 05.08.11
    • FHWA (US Department of Transportation, Federal Highway Administration), Highway safety improvement manual. FHWA-SA-09–029, January, 2010 http://safety.fhwa.dot.gov/hsip/resources/fhwasa09029/index.cfm#toc Accessed 05.08.11.
    • (2010)
  • 9
    • 34547893425 scopus 로고    scopus 로고
    • Equity metrics with risk, performance, and cost objectives for the prioritization of transportation projects
    • Joshi, N.N., Lambert, J.H., Equity metrics with risk, performance, and cost objectives for the prioritization of transportation projects. IEEE Transactions on Engineering Management 54:3 (1999), 539–547.
    • (1999) IEEE Transactions on Engineering Management , vol.54 , Issue.3 , pp. 539-547
    • Joshi, N.N.1    Lambert, J.H.2
  • 10
    • 0006962437 scopus 로고    scopus 로고
    • Prioritization methods for strategic planning and road work programming in a new highway development and management tool
    • Kerali, H.R., Mannisto, V., Prioritization methods for strategic planning and road work programming in a new highway development and management tool. Transportation Research Record: Journal of the Transportation Research Board 1655 (2007), 49–54.
    • (2007) Transportation Research Record: Journal of the Transportation Research Board , vol.1655 , pp. 49-54
    • Kerali, H.R.1    Mannisto, V.2
  • 13
    • 33646550868 scopus 로고    scopus 로고
    • Network robustness index: a new method for identifying critical links and evaluating the performance of transportation networks
    • Scott, D.M., Novak, D.C., Aultman-Hall, L., Guo, F., Network robustness index: a new method for identifying critical links and evaluating the performance of transportation networks. Journal of Transport Geography 14 (2006), 215–227.
    • (2006) Journal of Transport Geography , vol.14 , pp. 215-227
    • Scott, D.M.1    Novak, D.C.2    Aultman-Hall, L.3    Guo, F.4
  • 14
    • 85043726425 scopus 로고    scopus 로고
    • It's time to reinvent the circ highway
    • The Burlington Free Press Accessed 05.07.11
    • Searles, B., It's time to reinvent the circ highway. 2011, The Burlington Free Press http://www.burlingtonfreepress.com/article/20110705/OPINION02/107050304/It-s-time-reinvent-Circ-Highway Accessed 05.07.11.
    • (2011)
    • Searles, B.1
  • 17
    • 84895397527 scopus 로고    scopus 로고
    • Application of the network robustness index to identifying critical road-network links in Chittenden County, Vermont
    • Technical Report No. 10–009 by the University of Vermont Transportation Research Center, June
    • Sullivan, J.L., Novak, D.C., Aultman-Hall, L., Application of the network robustness index to identifying critical road-network links in Chittenden County, Vermont. 2010 Technical Report No. 10–009 by the University of Vermont Transportation Research Center, June.
    • (2010)
    • Sullivan, J.L.1    Novak, D.C.2    Aultman-Hall, L.3
  • 18
    • 77952099590 scopus 로고    scopus 로고
    • Identifying critical road links and measuring system-wide robustness in transportation networks with isolating links: a link-based capacity-reduction approach
    • Sullivan, J.L., Novak, D.C., Aultman-Hall, L., Scott, D.M., Identifying critical road links and measuring system-wide robustness in transportation networks with isolating links: a link-based capacity-reduction approach. Transportation Research Part A: Policy and Practice 44 (2010), 323–336.
    • (2010) Transportation Research Part A: Policy and Practice , vol.44 , pp. 323-336
    • Sullivan, J.L.1    Novak, D.C.2    Aultman-Hall, L.3    Scott, D.M.4
  • 19
    • 85043723084 scopus 로고    scopus 로고
    • Infrastructure 2008: A competitive advantage says 2008 marks critical juncture in U.S. infrastructure investment, development
    • Accessed 02.09.11
    • Urban Land Institute, Infrastructure 2008: A competitive advantage says 2008 marks critical juncture in U.S. infrastructure investment, development. 2008 http://www.marketwire.com/press-release/Infrastructure-2008-A-Competitive-Advantage-Says-2008-Marks-Critical-Juncture-US-Infrastructure-849759.htm Accessed 02.09.11.
    • (2008)
    • Urban Land Institute1
  • 20
    • 85043723777 scopus 로고    scopus 로고
    • Transportation project prioritization and project selection at the Vermont agency of transportation (VTrans)
    • Accessed 01.09.11
    • Vermont Agency of Transportation (VTrans), Transportation project prioritization and project selection at the Vermont agency of transportation (VTrans). 2008 http://www.aot.state.vt.us/planning/Documents/Planning/Project%20Prioritization.pdf Accessed 01.09.11.
    • (2008)
  • 21
    • 63349092313 scopus 로고    scopus 로고
    • Robust improvement schemes for road networks under demand uncertainty
    • Yin, Y., Madanat, S.M., Lu, X.Y., Robust improvement schemes for road networks under demand uncertainty. European Journal of Operational Research 198 (2009), 470–479.
    • (2009) European Journal of Operational Research , vol.198 , pp. 470-479
    • Yin, Y.1    Madanat, S.M.2    Lu, X.Y.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.