-
2
-
-
33846823924
-
Evaluation, prioritization and selection of transportation investment projects in New York City
-
Berechman, J., Paaswell, R.E., Evaluation, prioritization and selection of transportation investment projects in New York City. Transportation 32 (2005), 223–249.
-
(2005)
Transportation
, vol.32
, pp. 223-249
-
-
Berechman, J.1
Paaswell, R.E.2
-
3
-
-
28244450350
-
On a paradox of traffic planning
-
Braess, D., Nagurney, A., Wakolbinger, T., On a paradox of traffic planning. Transportation Science 39 (2005), 446–450.
-
(2005)
Transportation Science
, vol.39
, pp. 446-450
-
-
Braess, D.1
Nagurney, A.2
Wakolbinger, T.3
-
4
-
-
74449085566
-
The broader effects of transportation infrastructure: spatial econometrics and productivity approaches
-
Cohen, J.P., The broader effects of transportation infrastructure: spatial econometrics and productivity approaches. Transportation Research Part E: Logistics and Transportation Review 46 (2010), 317–326.
-
(2010)
Transportation Research Part E: Logistics and Transportation Review
, vol.46
, pp. 317-326
-
-
Cohen, J.P.1
-
5
-
-
79956188225
-
Our nation's highways, 2008
-
Accessed 03.06.11
-
FHWA (US Department of Transportation, Federal Highway Administration), Our nation's highways, 2008. 2008 http://www.fhwa.dot.gov/policyinformation/pubs/pl08021/index.cfm Accessed 03.06.11.
-
(2008)
-
-
-
6
-
-
85043729240
-
Highway safety improvement manual
-
FHWA-SA-09–029 Accessed 05.08.11
-
FHWA (US Department of Transportation, Federal Highway Administration), Highway safety improvement manual. FHWA-SA-09–029, January, 2010 http://safety.fhwa.dot.gov/hsip/resources/fhwasa09029/index.cfm#toc Accessed 05.08.11.
-
(2010)
-
-
-
7
-
-
77950104166
-
Development of a prioritization methodology for maintaining Virginia's bridge infrastructure
-
Charlottesville, VA
-
Gokey, J., Klein, N., Mackey, C., Santos, J., Pillutla, A., Tucker, S., Development of a prioritization methodology for maintaining Virginia's bridge infrastructure. Systems and information engineering design symposium (SIEDS, 2009), 2009, 252–257 Charlottesville, VA.
-
(2009)
Systems and information engineering design symposium (SIEDS, 2009)
, pp. 252-257
-
-
Gokey, J.1
Klein, N.2
Mackey, C.3
Santos, J.4
Pillutla, A.5
Tucker, S.6
-
9
-
-
34547893425
-
Equity metrics with risk, performance, and cost objectives for the prioritization of transportation projects
-
Joshi, N.N., Lambert, J.H., Equity metrics with risk, performance, and cost objectives for the prioritization of transportation projects. IEEE Transactions on Engineering Management 54:3 (1999), 539–547.
-
(1999)
IEEE Transactions on Engineering Management
, vol.54
, Issue.3
, pp. 539-547
-
-
Joshi, N.N.1
Lambert, J.H.2
-
10
-
-
0006962437
-
Prioritization methods for strategic planning and road work programming in a new highway development and management tool
-
Kerali, H.R., Mannisto, V., Prioritization methods for strategic planning and road work programming in a new highway development and management tool. Transportation Research Record: Journal of the Transportation Research Board 1655 (2007), 49–54.
-
(2007)
Transportation Research Record: Journal of the Transportation Research Board
, vol.1655
, pp. 49-54
-
-
Kerali, H.R.1
Mannisto, V.2
-
11
-
-
1842480349
-
Need-based project prioritization: alternative to cost-benefit analysis
-
Kulkarni, R.B., Miller, D., Ingram, R.M., Wong, C.W., Lorenz, J., Need-based project prioritization: alternative to cost-benefit analysis. Journal of Transportation Engineering (ASCE), March/April, 2004, 150–158.
-
(2004)
Journal of Transportation Engineering (ASCE), March/April
, pp. 150-158
-
-
Kulkarni, R.B.1
Miller, D.2
Ingram, R.M.3
Wong, C.W.4
Lorenz, J.5
-
13
-
-
33646550868
-
Network robustness index: a new method for identifying critical links and evaluating the performance of transportation networks
-
Scott, D.M., Novak, D.C., Aultman-Hall, L., Guo, F., Network robustness index: a new method for identifying critical links and evaluating the performance of transportation networks. Journal of Transport Geography 14 (2006), 215–227.
-
(2006)
Journal of Transport Geography
, vol.14
, pp. 215-227
-
-
Scott, D.M.1
Novak, D.C.2
Aultman-Hall, L.3
Guo, F.4
-
14
-
-
85043726425
-
It's time to reinvent the circ highway
-
The Burlington Free Press Accessed 05.07.11
-
Searles, B., It's time to reinvent the circ highway. 2011, The Burlington Free Press http://www.burlingtonfreepress.com/article/20110705/OPINION02/107050304/It-s-time-reinvent-Circ-Highway Accessed 05.07.11.
-
(2011)
-
-
Searles, B.1
-
16
-
-
0034433168
-
Prioritizing major transportation improvement projects
-
Speicher, D., Schwartz, M., Mar, T., Prioritizing major transportation improvement projects. Transportation Research Record: Journal of the Transportation Research Board 1706 (2000), 38–45.
-
(2000)
Transportation Research Record: Journal of the Transportation Research Board
, vol.1706
, pp. 38-45
-
-
Speicher, D.1
Schwartz, M.2
Mar, T.3
-
17
-
-
84895397527
-
Application of the network robustness index to identifying critical road-network links in Chittenden County, Vermont
-
Technical Report No. 10–009 by the University of Vermont Transportation Research Center, June
-
Sullivan, J.L., Novak, D.C., Aultman-Hall, L., Application of the network robustness index to identifying critical road-network links in Chittenden County, Vermont. 2010 Technical Report No. 10–009 by the University of Vermont Transportation Research Center, June.
-
(2010)
-
-
Sullivan, J.L.1
Novak, D.C.2
Aultman-Hall, L.3
-
18
-
-
77952099590
-
Identifying critical road links and measuring system-wide robustness in transportation networks with isolating links: a link-based capacity-reduction approach
-
Sullivan, J.L., Novak, D.C., Aultman-Hall, L., Scott, D.M., Identifying critical road links and measuring system-wide robustness in transportation networks with isolating links: a link-based capacity-reduction approach. Transportation Research Part A: Policy and Practice 44 (2010), 323–336.
-
(2010)
Transportation Research Part A: Policy and Practice
, vol.44
, pp. 323-336
-
-
Sullivan, J.L.1
Novak, D.C.2
Aultman-Hall, L.3
Scott, D.M.4
-
19
-
-
85043723084
-
Infrastructure 2008: A competitive advantage says 2008 marks critical juncture in U.S. infrastructure investment, development
-
Accessed 02.09.11
-
Urban Land Institute, Infrastructure 2008: A competitive advantage says 2008 marks critical juncture in U.S. infrastructure investment, development. 2008 http://www.marketwire.com/press-release/Infrastructure-2008-A-Competitive-Advantage-Says-2008-Marks-Critical-Juncture-US-Infrastructure-849759.htm Accessed 02.09.11.
-
(2008)
-
-
Urban Land Institute1
-
20
-
-
85043723777
-
Transportation project prioritization and project selection at the Vermont agency of transportation (VTrans)
-
Accessed 01.09.11
-
Vermont Agency of Transportation (VTrans), Transportation project prioritization and project selection at the Vermont agency of transportation (VTrans). 2008 http://www.aot.state.vt.us/planning/Documents/Planning/Project%20Prioritization.pdf Accessed 01.09.11.
-
(2008)
-
-
-
21
-
-
63349092313
-
Robust improvement schemes for road networks under demand uncertainty
-
Yin, Y., Madanat, S.M., Lu, X.Y., Robust improvement schemes for road networks under demand uncertainty. European Journal of Operational Research 198 (2009), 470–479.
-
(2009)
European Journal of Operational Research
, vol.198
, pp. 470-479
-
-
Yin, Y.1
Madanat, S.M.2
Lu, X.Y.3
|