메뉴 건너뛰기




Volumn , Issue , 2011, Pages 2378-2389

A prototype simulation tool for a framework for simulation-based optimization of assembly lines

Author keywords

[No Author keywords available]

Indexed keywords

ASSEMBLY LINE; AUTOMATED GENERATION; COMPLEX ASSEMBLY; DEVELOPMENT COSTS; GENERAL-PURPOSE SIMULATORS; PRIORITY RULES; RUNTIMES; SIMULATION TOOL; SIMULATION-BASED; SIMULATION-BASED OPTIMIZATIONS;

EID: 84858051675     PISSN: 08917736     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/WSC.2011.6147948     Document Type: Conference Paper
Times cited : (8)

References (12)
  • 1
    • 1642560618 scopus 로고    scopus 로고
    • Practical Introduction to Simulation Optimization
    • edited by S. Chick, P. J. Sánchez, D. Ferrin, and D. J. Morrice, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
    • April, J., F. Glover, P. J. Kelly, and M. Laguna. 2003. "Practical Introduction to Simulation Optimization."In Proceedings of the 2003 Winter Simulation Conference, edited by S. Chick, P. J. Sánchez, D. Ferrin, and D. J. Morrice, 71-78. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
    • (2003) Proceedings of the 2003 Winter Simulation Conference , pp. 71-78
    • April, J.1    Glover, F.2    Kelly, P.J.3    Laguna, M.4
  • 5
    • 12244289668 scopus 로고    scopus 로고
    • Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models
    • DOI 10.1016/j.ejor.2003.10.053, PII S0377221704001134
    • Mika, M., G. Waligóra, and J. Weglarz. 2005. "Simulated Annealing and Tabu Search for Multimode Resource- Constraint Project Scheduling with Positive Cash Flows and Different Payment Models." European Journal of Operational Research 164(3):639-668. (Pubitemid 40114587)
    • (2005) European Journal of Operational Research , vol.164 , Issue.3 SPEC. ISS. , pp. 639-668
    • Mika, M.1    Waligora, G.2    Weeglarz, J.3
  • 7
    • 79951597461 scopus 로고    scopus 로고
    • Framework for Simulation-based Scheduling of Assembly Lines
    • edited by B. Johansson, S. Jain, J. Montoya-Torres, J. Hugan, and E. Yücesan, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
    • Pappert, F. S., E. Angelidis, and O. Rose. 2010. "Framework For Simulation-based Scheduling of Assembly Lines". In Proceedings of the 2010 Winter Simulation Conference, edited by B. Johansson, S. Jain, J. Montoya-Torres, J. Hugan, and E. Yücesan, 1690-1698. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
    • (2010) Proceedings of the 2010 Winter Simulation Conference , pp. 1690-1698
    • Pappert, F.S.1    Angelidis, E.2    Rose, O.3
  • 8
    • 0000480311 scopus 로고
    • An Algorithm for a General Class of Precedence and Resource-Constrained Scheduling Problems
    • edited by R. Slowinski and J. Weglarz, Amsterdam: Elsevier
    • Patterson, J. H., R. Slowinski, F. B. Talbot, and J. Weglarz. 1989. "An Algorithm for a General Class of Precedence and Resource-Constrained Scheduling Problems." In: Advances in Project Scheduling, edited by R. Slowinski and J. Weglarz, 3-28. Amsterdam: Elsevier.
    • (1989) Advances in Project Scheduling , pp. 3-28
    • Patterson, J.H.1    Slowinski, R.2    Talbot, F.B.3    Weglarz, J.4
  • 12
    • 84867702362 scopus 로고    scopus 로고
    • Model-driven Development of Simulation Solution based on SysML starting with the Simulation Core
    • Weyprecht, P., and O. Rose. 2011. "Model-driven Development of Simulation Solution based on SysML starting with the Simulation Core." In Proceedings of the Spring Simulation Conference.
    • (2011) Proceedings of the Spring Simulation Conference
    • Weyprecht, P.1    Rose, O.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.