-
1
-
-
84857253816
-
The application of genetic algorithms to multiple period ventilation systems for multilevel mine operations
-
(ed: R Dimitrakopoulos)
-
Acuña E. et al., 2009. The application of genetic algorithms to multiple period ventilation systems for multilevel mine operations. Orebody modelling and Strategic Mine Planning, (ed: R Dimitrakopoulos), 145-148.
-
(2009)
Orebody Modelling and Strategic Mine Planning
, pp. 145-148
-
-
Acuña, E.1
-
2
-
-
34548666552
-
A strategic production scheduling method for an open pit mine
-
Akaike A., Dagdelen, K., A strategic production scheduling method for an open pit mine, in Proceedings of the 28th APCOM 729-738.
-
Proceedings of the 28th APCOM
, pp. 729-738
-
-
Akaike, A.1
Dagdelen, K.2
-
3
-
-
74549157188
-
Stochastic mine design optimization based on simulated annealing: Pit limits, production schedules, multiple orebody scenarios and sensitivity analysis
-
Albor F., Dimitrakopoulos R., 2009. Stochastic mine design optimization based on simulated annealing: Pit limits, production schedules, multiple orebody scenarios and sensitivity analysis. IMM Trans, Mining Technology 118, 2, 80-91.
-
(2009)
IMM Trans, Mining Technology 118
, vol.2
, pp. 80-91
-
-
Albor, F.1
Dimitrakopoulos, R.2
-
4
-
-
34548695251
-
Optimum cut-off grade policy for open pit mining operations through net present value algorithm considering metal price and cost escalation
-
Asad, MWA, 2007. Optimum cut-off grade policy for open pit mining operations through net present value algorithm considering metal price and cost escalation. Engineering Computations 24, 7, 723-736.
-
(2007)
Engineering Computations 24
, vol.7
, pp. 723-736
-
-
Mwa, A.1
-
5
-
-
27144494962
-
Cutoff grade optimization algorithm with stockpiling option for open pit mining operations of two economic minerals
-
Asad MWA, 2005. Cutoff grade optimization algorithm with stockpiling option for open pit mining operations of two economic minerals. Int. J. Surf. Min. Reclamation Environ. 19, 3, 176-187.
-
(2005)
Int. J. Surf. Min. Reclamation Environ
, vol.19
, Issue.3
, pp. 176-187
-
-
Mwa, A.1
-
6
-
-
0742322665
-
Using a combination of genetic algorithm and the grid search method to determine optimum cutoff grades of multiple metal deposits
-
DOI 10.1076/ijsm.18.1.60.23543
-
Ataei M., Osanloo M., 2004. Using a Combination of Genetic Algorithm and the Grid Search Method to Determine Optimum Cutoff Grades of Multiple Metal Deposits. International Journal of Surface Mining, Reclamation and Environment (IJSM)18, 1, 60-78. (Pubitemid 38149837)
-
(2004)
International Journal of Surface Mining, Reclamation and Environment
, vol.18
, Issue.1
, pp. 60-78
-
-
Ataei, M.1
Osanloo, M.2
-
7
-
-
84857346353
-
Determination of optimum cutoff grades of multiple metal deposits by iterated grid search method
-
Ataei M., Osanloo M., 2003a. Determination of optimum cutoff grades of multiple metal deposits by iterated grid search method. International Journal of Engineering Science, Iran University of science and technology 14, 2, 79-88.
-
(2003)
International Journal of Engineering Science, Iran University of Science and Technology 14
, vol.2
, pp. 79-88
-
-
Ataei, M.1
Osanloo, M.2
-
9
-
-
3543142525
-
Methods for calculation of optimal cutoff grades in complex ore deposits
-
DOI 10.1023/B:JOMI.0000029314.42174.d9
-
Ataei M., Osanloo M., 2003c. Methods for Calculation of Optimal Cutoff Grades in Complex Ore Deposits. Journal of Mining Science 39, 5, 499-507. (Pubitemid 39020684)
-
(2003)
Journal of Mining Science
, vol.39
, Issue.5
, pp. 499-507
-
-
Ataei, M.1
Osanloo, M.2
-
10
-
-
0242653680
-
Use of genetic algorithms to solve production and operations management problems: A review
-
Aytug H., Khouja M., Vergara F.E., 2003. Use of genetic algorithms to solve production and operations management problems: a review. International Journal of Production Research 41 17, 3955-4009.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.17
, pp. 3955-4009
-
-
Aytug, H.1
Khouja, M.2
Vergara, F.E.3
-
11
-
-
34249060873
-
Determination of optimal cut-off grade policy to optimize NPV using a new approach with optimization factor
-
Bascetin A., 2007. Determination of optimal cut-off grade policy to optimize NPV using a new approach with optimization factor. Journal of the South African Institute of Mining and Metallurgy 107, 2, 87-94. (Pubitemid 46787564)
-
(2007)
Journal of The South African Institute of Mining and Metallurgy
, vol.107
, Issue.2
, pp. 87-94
-
-
Bascetin, A.1
Nieto, A.2
-
12
-
-
77954884663
-
Optimal open pit mining equipment selection using fuzzy multiple attribute decision making approach
-
Bazzazi A.A., Osanloo M., Karimi B., 2009. Optimal open pit mining equipment selection using fuzzy multiple attribute decision making approach. Arch. Min. Sci. 54, 2, 301-320.
-
(2009)
Arch. Min. Sci
, vol.54
, Issue.2
, pp. 301-320
-
-
Bazzazi, A.A.1
Osanloo, M.2
Karimi, B.3
-
13
-
-
85012688561
-
-
Princeton University Press, New Jersey, USA
-
Bellman R., 1957. Dynamic Programming. Princeton University Press, New Jersey, USA.
-
(1957)
Dynamic Programming
-
-
Bellman, R.1
-
14
-
-
84856930615
-
Present value in its relation to ore reserves, plant capacity and grade of ore
-
Berry E.S., 1922. Present value in its relation to ore reserves, plant capacity and grade of ore. Min. Metall. 11-6.
-
(1922)
Min. Metall
, pp. 11-6
-
-
Berry, E.S.1
-
15
-
-
34249812361
-
A tutorial on geometric programming
-
DOI 10.1007/s11081-007-9001-7
-
Boyd S., Kim S-J., Vandenberghe L., Hassibi A., 2007. A tutorial on geometric programming. Optim Eng 8, 67-127. (Pubitemid 46844969)
-
(2007)
Optimization and Engineering
, vol.8
, Issue.1
, pp. 67-127
-
-
Boyd, S.1
Kim, S.-J.2
Vandenberghe, L.3
Hassibi, A.4
-
16
-
-
84856831268
-
Economic relation of mining rate to grade of ore
-
Callaway H.M., 1958. Economic relation of mining rate to grade of ore. Min. Eng., 470-472.
-
(1958)
Min. Eng.
, pp. 470-472
-
-
Callaway, H.M.1
-
17
-
-
84856888969
-
Basic breakeven formulas devise to simplify mine evaluation
-
Callaway H.M., 1954. Basic breakeven formulas devise to simplify mine evaluation. Eng. Min. J. 90-92.
-
(1954)
Eng. Min. J
, pp. 90-92
-
-
Callaway, H.M.1
-
18
-
-
8744309883
-
The choice of the cutoff grade in mining
-
DOI 10.1016/j.resourpol.2004.06.002, PII S0301420704000303
-
Cairns R.D., Shinkuma T., 2003. The choice of the cutoff grade in mining. Resources Policy 29, 75-81. (Pubitemid 39520137)
-
(2003)
Resources Policy
, vol.29
, Issue.3-4
, pp. 75-81
-
-
Cairns, R.D.1
Shinkuma, T.2
-
19
-
-
18244365222
-
The use of genetic algorithms for multiple cutoff grade optimization
-
Cetin E., Dowd P.A., 2002. The use of genetic algorithms for multiple cutoff grade optimization. 32nd APCOM, 769-780.
-
(2002)
32nd APCOM
, pp. 769-780
-
-
Cetin, E.1
Dowd, P.A.2
-
20
-
-
43449094328
-
Guiding rational reservoir fl ood operation using penalty-type genetic algorithm
-
Chang L.C., 2008. Guiding rational reservoir fl ood operation using penalty-type genetic algorithm. Journal of Hydrology 354, 65-74.
-
(2008)
Journal of Hydrology
, vol.354
, pp. 65-74
-
-
Chang, L.C.1
-
21
-
-
40149085103
-
A self-organizing migrating genetic algorithm for constrained optimization
-
Deep K., Dipti., 2008. A self-organizing migrating genetic algorithm for constrained optimization. Applied Mathematics and Computation 198, 1, 237-250.
-
(2008)
Applied Mathematics and Computation 198
, vol.1
, pp. 237-250
-
-
Dipti, D.K.1
-
22
-
-
0028121944
-
Open Pit design and scheduling by use of genetic algorithms
-
Denby B., Schofi eld D., 1994. Open Pit design and scheduling by use of genetic algorithms. Trans. IMM, Mining Technology 103, 21-26.
-
(1994)
Trans. IMM, Mining Technology
, vol.103
, pp. 21-26
-
-
Denby, B.1
Schofield, D.2
-
23
-
-
0015144479
-
How to make the most of a mining investment
-
Douglas E.J., 1971. How to make the most of a mining investment. Min. Eng., 64-67.
-
(1971)
Min. Eng.
, pp. 64-67
-
-
Douglas, E.J.1
-
24
-
-
0016911674
-
Application of dynamic and stochastic programming to optimize cutoff grades and production rates
-
Dowd P.A., 1976. Application of dynamic and stochastic programming to optimize cutoff grades and production rates. Trans. IMM 85, A22-31.
-
(1976)
Trans. IMM 85, A22-31
-
-
Dowd, P.A.1
-
27
-
-
60249098806
-
Theory and method of genetic-neural optimizing cut-off grade and grade of crude ore
-
He Y. et al., 2009. Theory and method of genetic-neural optimizing cut-off grade and grade of crude ore. Expert Systems with Applications 36, 7617-7623.
-
(2009)
Expert Systems with Applications
, vol.36
, pp. 7617-7623
-
-
He, Y.1
-
28
-
-
35148866726
-
Calculation of cut-off grade
-
Henning U., 1963. Calculation of cut-off grade. Can. Min. J, 54-57.
-
(1963)
Can. Min. J
, pp. 54-57
-
-
Henning, U.1
-
29
-
-
0003463297
-
-
Second ed., MIT Press, Cambridge, 1992
-
Holland J.H., 1992. Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence. Second ed., MIT Press, Cambridge, 1992.
-
(1992)
Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence
-
-
Holland, J.H.1
-
32
-
-
0034701847
-
The efficiency of hybrid mutation genetic algorithm for the traveling salesman problem
-
Katayama K., Sakamoto H., Narihisa H., 2007. The efficiency of hybrid mutation genetic algorithm for the traveling salesman problem. Mathematical and Computer Modeling 31, 197-203.
-
(2007)
Mathematical and Computer Modeling
, vol.31
, pp. 197-203
-
-
Katayama, K.1
Sakamoto, H.2
Narihisa, H.3
-
33
-
-
58049159522
-
-
Royal School of Mines PhD, London University, United Kingdom
-
King B.M., 2001. Optimal mine scheduling policies, Royal School of Mines PhD, London University, United Kingdom.
-
(2001)
Optimal Mine Scheduling Policies
-
-
King, B.M.1
-
35
-
-
0001141251
-
Price expectations, ore quality selection, and the supply of a nonrenewable resource
-
Krautkraemer J.A., 1989. Price expectations, ore quality selection, and the supply of a nonrenewable resource. Journal of Environmental Economics and Management 16, 253-267.
-
(1989)
Journal of Environmental Economics and Management
, vol.16
, pp. 253-267
-
-
Krautkraemer, J.A.1
-
36
-
-
0010492435
-
The cut-off grade and the theory of extraction
-
Krautkraemer J.A., 1988. The cut-off grade and the theory of extraction. Canadian Journal of Economics 21, 1, 146-160.
-
(1988)
Canadian Journal of Economics 21
, vol.1
, pp. 146-160
-
-
Krautkraemer, J.A.1
-
37
-
-
84857346360
-
-
(Framingham MA US), The MathWorks, Inc. (Natick, MA, US), 7672910
-
Kumar R., (Framingham, MA, US), 2010a. System and method for performing non-linear constrained optimization with a genetic algorithm. United States, The MathWorks, Inc. (Natick, MA, US), 7672910, http://www.freepatentsonline.com/ 7672910.html.
-
(2010)
System and Method for Performing Non-linear Constrained Optimization with A Genetic Algorithm. United States
-
-
Kumar, R.1
-
38
-
-
79952735723
-
-
(Framingham MA US), (Natick, MA, US) 7660773
-
Kumar R., (Framingham, MA, US), 2010b. System and method for the use of an adaptive mutation operator in genetic algorithms. United States, The MathWorks, Inc. (Natick, MA, US), 7660773, http://www.freepatentsonline. com/7660773.html.
-
(2010)
System and Method for the Use of An Adaptive Mutation Operator in Genetic Algorithms. United States, the MathWorks, Inc.
-
-
Kumar, R.1
-
39
-
-
22744454162
-
A simulated annealing approach to mine production scheduling
-
DOI 10.1057/palgrave.jors.2601902
-
Kumral M., Dowd P.A., 2005. A simulated annealing approach to mine production scheduling. Journal of operational research society 56, 922-930. (Pubitemid 41028653)
-
(2005)
Journal of the Operational Research Society
, vol.56
, Issue.8
, pp. 922-930
-
-
Kumral, M.1
Dowd, P.A.2
-
42
-
-
84857305691
-
Modifi cation of an algorithm for determining the gas fl ow velocity components in hot-wire measurement
-
Ligȩza P., Socha K., 2005. Modifi cation of an algorithm for determining the gas fl ow velocity components in hot-wire measurement. Arch. Min. Sci. 50, 3, 289-305.
-
(2005)
Arch. Min. Sci
, vol.50
, Issue.3
, pp. 289-305
-
-
Ligȩza, P.1
Socha, K.2
-
44
-
-
38249001961
-
Option valuation of real assets: Application to a copper mine with operating fl exibility
-
Mardones J., 1993. Option valuation of real assets: Application to a copper mine with operating fl exibility. Resources Policy 19, 51-65.
-
(1993)
Resources Policy
, vol.19
, pp. 51-65
-
-
Mardones, J.1
-
45
-
-
84857311465
-
Mining schedule optimisation for conditionally simulated orebodies
-
second edition (ed: R Dimitrakopoulos)
-
Menabde M. et al., 2007. Mining Schedule Optimisation for Conditionally Simulated Orebodies. In Orebody Modelling and Strategic Mine Planning, second edition (ed: R Dimitrakopoulos), 145-148.
-
(2007)
Orebody Modelling and Strategic Mine Planning
, pp. 145-148
-
-
Menabde, M.1
-
46
-
-
0020763039
-
The effect of cost and price fl uctuations on the optimum choice of mine cutoff grades
-
Napier J.A.L., 1983. The effect of cost and price fl uctuations on the optimum choice of mine cutoff grades. Journal of the South African Institute of Mining and Metallurgy 83, 6, 117-125. (Pubitemid 14491920)
-
(1983)
Journal of The South African Institute of Mining and Metallurgy
, vol.83
, Issue.6
, pp. 117-125
-
-
Napier, J.A.L.1
-
47
-
-
79960389637
-
Modern methods control and diagnostics of hoisting-machines with application of Artificial intelligence methods
-
Oleksy A., Szymanski Z., 2010. Modern methods control and diagnostics of hoisting-machines with application of Artificial intelligence methods. Arch. Min. Sci. 55, 1, 217-231.
-
(2010)
Arch. Min. Sci
, vol.55
, Issue.1
, pp. 217-231
-
-
Oleksy, A.1
Szymanski, Z.2
-
48
-
-
57049179464
-
Incorporating environmental issues into optimum cut-off grades modeling at porphyry copper deposits
-
Osanloo M., Rashidinejad F., Rezai B., 2008. Incorporating environmental issues into optimum cut-off grades modeling at porphyry copper deposits. Resources Policy 33 222-229.
-
(2008)
Resources Policy
, vol.33
, pp. 222-229
-
-
Osanloo, M.1
Rashidinejad, F.2
Rezai, B.3
-
49
-
-
0347410996
-
Using equivalent grade factors to fi nd the optimum cutoff grades of multiple metal deposits
-
Osanloo M., Ataei M., 2003. Using equivalent grade factors to fi nd the optimum cutoff grades of multiple metal deposits. Minerals Engineering 16, 8, 771-776.
-
(2003)
Minerals Engineering 16
, vol.8
, pp. 771-776
-
-
Osanloo, M.1
Ataei, M.2
-
50
-
-
13544262348
-
An effective genetic algorithm approach to multiobjective routing problems (MORPs)
-
DOI 10.1016/j.amc.2003.10.058, PII S0096300304002590
-
Osman M.S., Abo-sina M.A., Mousa A.A., 2005. An effective genetic algorithm approach to multiobjective routing problems (MORPs). Applied Mathematics and Computation 163, 769-781. (Pubitemid 40219919)
-
(2005)
Applied Mathematics and Computation
, vol.163
, Issue.2
, pp. 769-781
-
-
Osman, M.S.1
Abo-Sinna, M.A.2
Mousa, A.A.3
-
51
-
-
41149133380
-
An environmental oriented model for optimum cut off grades in open pit mining projects to minimize acid mine drainage
-
Rashidinejad F., Osanloo M., Rezai B., 2008. An environmental oriented model for optimum cut-off grades in open pit mining projects to minimize acid mine drainage. International Journal of Environmental Science and Technology 5, 2, 183-194. (Pubitemid 351439772)
-
(2008)
International Journal of Environmental Science and Technology
, vol.5
, Issue.2
, pp. 183-194
-
-
Rashidinejad, F.1
Osanloo, M.2
Rezai, B.3
-
52
-
-
0018699601
-
Determination of optimum cutoff grades
-
Rudenno V., 1979. Determination of optimum cutoff grades. 16th APCOM, Am Inst Mining Eng, 261-268.
-
(1979)
16th APCOM, Am Inst Mining Eng
, pp. 261-268
-
-
Rudenno, V.1
-
53
-
-
33751049900
-
An efficient genetic algorithm for determining the optimal price discrimination
-
DOI 10.1016/j.amc.2006.03.022, PII S0096300306003006
-
Safaei N., Sadjadi S.J., Babakhani M., 2006. An efficient genetic algorithm for determining the optimal price discrimination. Applied Mathematics and Computation 181, 1693-1702. (Pubitemid 44754783)
-
(2006)
Applied Mathematics and Computation
, vol.181
, Issue.2
, pp. 1693-1702
-
-
Safaei, N.1
Sadjadi, S.J.2
Babakhani, M.3
-
55
-
-
84857254568
-
-
Ph.D. dissertation, The Faculty of Georesources and Materials Engineering, RWTH Aachen University
-
Sattarvand J., 2009. Long term open pit planning by ant colony optimization. Ph.D. dissertation, The Faculty of Georesources and Materials Engineering, RWTH Aachen University: 144 p.
-
(2009)
Long Term Open Pit Planning by Ant Colony Optimization
, pp. 144
-
-
Sattarvand, J.1
-
56
-
-
45849117634
-
A robust algorithm for generalized geometric programming
-
Shen P., Ma Y., Chen Y., 2008. A robust algorithm for generalized geometric programming. Journal of Global Optimization 41, 593-612.
-
(2008)
Journal of Global Optimization
, vol.41
, pp. 593-612
-
-
Shen, P.1
Ma, Y.2
Chen, Y.3
-
57
-
-
0033864659
-
The grade selection rule of the metal mines; an empirical study on copper mines
-
DOI 10.1016/S0301-4207(00)00014-3, PII S0301420700000143
-
Shinkuma T., Nishiyama T., 2000. The grade selection rule of the metal mines; an empirical study on copper mines. Resources Policy 26, 31-38. (Pubitemid 30600212)
-
(2000)
Resources Policy
, vol.26
, Issue.1
, pp. 31-38
-
-
Shinkuma, T.1
Nishiyama, T.2
-
58
-
-
53549096651
-
Application of machine learning for prediction a methane concentration in a coal-mine
-
Sikora M., Sikora B., 2006. Application of machine learning for prediction a methane concentration in a coal-mine. Arch. Min. Sci. 51, 4, 475-492.
-
(2006)
Arch. Min. Sci
, vol.51
, Issue.4
, pp. 475-492
-
-
Sikora, M.1
Sikora, B.2
-
59
-
-
84863179820
-
The connection between production schedule and cut-off optimization in underground mines
-
Smith M.L., O'Rourke A., 2005. The connection between production schedule and cut-off optimization in underground mines. 32nd APCOM, 643-654.
-
(2005)
32nd APCOM
, pp. 643-654
-
-
Smith, M.L.1
O'rourke, A.2
-
60
-
-
0022267444
-
Cut-off grades-some further refl ection
-
Taylor H.K., 1985. Cut-off grades-some further refl ection. Trans. IMM 94, 204-216.
-
(1985)
Trans. IMM
, vol.94
, pp. 204-216
-
-
Taylor, H.K.1
-
61
-
-
0346518147
-
General background theory of cutoff grades
-
Taylor H.K., 1972. General background theory of cutoff grades. Trans. IMM 81, A160-179.
-
(1972)
Trans. IMM 81, A160-179
-
-
Taylor, H.K.1
-
62
-
-
18244386962
-
GenRel - A computer model for prediction of mining equipment failures based on genetic algorithms (GAs)
-
DOI 10.1080/13895260412331326812
-
Vayenas N., Yuriy G., 2005. GenRel-a computer model for prediction of mining equipment failures based on genetic algorithms (GAs). International Journal of Surface Mining, Reclamation and Environment 19, 1, 3-11. (Pubitemid 40633865)
-
(2005)
International Journal of Surface Mining, Reclamation and Environment
, vol.19
, Issue.1
, pp. 3-11
-
-
Vayenas, N.1
Yuriy, G.2
-
63
-
-
2042476809
-
Optimizing cut-offs over time
-
Whittle J., Wharton C., 1995. Optimizing cut-offs over time. 25th APCOM, 261-265.
-
(1995)
25th APCOM
, pp. 261-265
-
-
Whittle, J.1
Wharton, C.2
-
66
-
-
10644279365
-
Economic signifi cance of sub-cutoff grades in open pits operating with concentrator bottleneck
-
Yi R., Sturgul J.R., 1999. Economic signifi cance of sub-cutoff grades in open pits operating with concentrator bottleneck. Mineral Resources Engineering 8, 2, 95-203.
-
(1999)
Mineral Resources Engineering 8
, vol.2
, pp. 95-203
-
-
Yi, R.1
Sturgul, J.R.2
|