-
1
-
-
34548488464
-
Predicting uncertain behavior of industrial system using FM: a practical case
-
Sharma R.K., Kumar D., Kumar P. Predicting uncertain behavior of industrial system using FM: a practical case. Appl. Soft Comput. 2008, 8(1):96-109.
-
(2008)
Appl. Soft Comput.
, vol.8
, Issue.1
, pp. 96-109
-
-
Sharma, R.K.1
Kumar, D.2
Kumar, P.3
-
2
-
-
65249138135
-
-
Narosa Publishing House Pvt. Ltd., New Delhi, India
-
Verma A.K., Srividya A., Gaonkar R.S.P. Fuzzy-Reliability Engineering, Concepts and Applications 2007, Narosa Publishing House Pvt. Ltd., New Delhi, India.
-
(2007)
Fuzzy-Reliability Engineering, Concepts and Applications
-
-
Verma, A.K.1
Srividya, A.2
Gaonkar, R.S.P.3
-
3
-
-
0000042191
-
System failure engineering and fuzzy methodology: an introductory overview
-
Cai K.Y. System failure engineering and fuzzy methodology: an introductory overview. Fuzzy Sets Syst. 1996, 83:113-133.
-
(1996)
Fuzzy Sets Syst.
, vol.83
, pp. 113-133
-
-
Cai, K.Y.1
-
4
-
-
0025242877
-
A fuzzy set approach to fault tree and reliability analysis
-
Singer D. A fuzzy set approach to fault tree and reliability analysis. Fuzzy Sets Syst. 1990, 34(2):145-155.
-
(1990)
Fuzzy Sets Syst.
, vol.34
, Issue.2
, pp. 145-155
-
-
Singer, D.1
-
5
-
-
43949169709
-
Fuzzy system reliability analysis by interval of confidence
-
Cheng C.H., Mon D.L. Fuzzy system reliability analysis by interval of confidence. Fuzzy Sets Syst. 1993, 56(1):29-35.
-
(1993)
Fuzzy Sets Syst.
, vol.56
, Issue.1
, pp. 29-35
-
-
Cheng, C.H.1
Mon, D.L.2
-
6
-
-
0028424269
-
Fuzzy system reliability analysis using fuzzy number arithmetic operations
-
Chen S.M. Fuzzy system reliability analysis using fuzzy number arithmetic operations. Fuzzy Sets Syst. 1994, 64(1):31-38.
-
(1994)
Fuzzy Sets Syst.
, vol.64
, Issue.1
, pp. 31-38
-
-
Chen, S.M.1
-
7
-
-
0035399545
-
Reliability modeling of repairable systems using petri nets and Fuzzy lambda-tau methodology
-
Knezevic J., Odoom E.R. Reliability modeling of repairable systems using petri nets and Fuzzy lambda-tau methodology. Reliab. Eng. Syst. Safety 2001, 73(1):1-17.
-
(2001)
Reliab. Eng. Syst. Safety
, vol.73
, Issue.1
, pp. 1-17
-
-
Knezevic, J.1
Odoom, E.R.2
-
8
-
-
0036531196
-
Analysis of equivalent dynamic reliability with repairs under partial information
-
Wang K.S., Po H.J., Hsu F.S., Liu C.S. Analysis of equivalent dynamic reliability with repairs under partial information. Reliab. Eng. Syst. Safety 2002, 76(1):29-42.
-
(2002)
Reliab. Eng. Syst. Safety
, vol.76
, Issue.1
, pp. 29-42
-
-
Wang, K.S.1
Po, H.J.2
Hsu, F.S.3
Liu, C.S.4
-
9
-
-
0037400041
-
A fuzzy logic based approach to reliability improvement estimation during product development
-
Yadav O.P., Singh N., Chinnam R.B., Goel P.S. A fuzzy logic based approach to reliability improvement estimation during product development. Reliab. Eng. Syst. Safety 2003, 80(1):63-74.
-
(2003)
Reliab. Eng. Syst. Safety
, vol.80
, Issue.1
, pp. 63-74
-
-
Yadav, O.P.1
Singh, N.2
Chinnam, R.B.3
Goel, P.S.4
-
10
-
-
0037409899
-
A numerical algorithm of fuzzy reliability
-
Jiang Q., Chen C.-H. A numerical algorithm of fuzzy reliability. Reliab. Eng. Syst. Safety 2003, 80(3):299-307.
-
(2003)
Reliab. Eng. Syst. Safety
, vol.80
, Issue.3
, pp. 299-307
-
-
Jiang, Q.1
Chen, C.-H.2
-
11
-
-
4744339387
-
A new approach to real-time reliability analysis of transmission system using fuzzy Markov model
-
Tanrioven M., Wu Q., Turner D., Kocatepe C., Wang J. A new approach to real-time reliability analysis of transmission system using fuzzy Markov model. Int. J. Elect. Power Energy Syst. 2004, 26(10):821-832.
-
(2004)
Int. J. Elect. Power Energy Syst.
, vol.26
, Issue.10
, pp. 821-832
-
-
Tanrioven, M.1
Wu, Q.2
Turner, D.3
Kocatepe, C.4
Wang, J.5
-
12
-
-
24344465324
-
Standby redundancy optimization problems with fuzzy lifetimes
-
Zhao R., Liu B. Standby redundancy optimization problems with fuzzy lifetimes. Comput. Indust. Eng. 2005, 49(2):318-338.
-
(2005)
Comput. Indust. Eng.
, vol.49
, Issue.2
, pp. 318-338
-
-
Zhao, R.1
Liu, B.2
-
13
-
-
33646264071
-
Bayesian reliability analysis for fuzzy lifetime data
-
Huang H.-Z., Zuo M.J., Sun Z.-Q. Bayesian reliability analysis for fuzzy lifetime data. Fuzzy Sets Syst. 2006, 157(12):1674-1686.
-
(2006)
Fuzzy Sets Syst.
, vol.157
, Issue.12
, pp. 1674-1686
-
-
Huang, H.-Z.1
Zuo, M.J.2
Sun, Z.-Q.3
-
14
-
-
33847381184
-
Test interval optimization of safety systems of nuclear power plant using fuzzy-genetic approach
-
Rao K.D., Gopika V., Kushwaha H., Verma A., Srividya A. Test interval optimization of safety systems of nuclear power plant using fuzzy-genetic approach. Reliab. Eng. Syst. Safety 2007, 92(7):895-901.
-
(2007)
Reliab. Eng. Syst. Safety
, vol.92
, Issue.7
, pp. 895-901
-
-
Rao, K.D.1
Gopika, V.2
Kushwaha, H.3
Verma, A.4
Srividya, A.5
-
15
-
-
50149119243
-
A redundant repairable system with imperfect coverage and fuzzy parameters
-
Ke J.-C., Huang H.-I., Lin C.-H. A redundant repairable system with imperfect coverage and fuzzy parameters. Appl. Math. Modell. 2008, 32(12):2839-2850.
-
(2008)
Appl. Math. Modell.
, vol.32
, Issue.12
, pp. 2839-2850
-
-
Ke, J.-C.1
Huang, H.-I.2
Lin, C.-H.3
-
16
-
-
68349125516
-
Modelling redundancy allocation for a fuzzy random parallel-series system
-
Wang S., Watada J. Modelling redundancy allocation for a fuzzy random parallel-series system. J. Comput. Appl. Math. 2009, 232(2):539-557.
-
(2009)
J. Comput. Appl. Math.
, vol.232
, Issue.2
, pp. 539-557
-
-
Wang, S.1
Watada, J.2
-
17
-
-
78049287203
-
RAM analysis of repairable industrial systems utilizing uncertain data
-
Komal, Sharma S., Kumar D. RAM analysis of repairable industrial systems utilizing uncertain data. Appl. Soft Comput. 2010, 10(4):1208-1221.
-
(2010)
Appl. Soft Comput.
, vol.10
, Issue.4
, pp. 1208-1221
-
-
Komal1
Sharma, S.2
Kumar, D.3
-
18
-
-
78751609529
-
Bayesian system reliability assessment under the vague environment
-
Taheri S., Zarei R. Bayesian system reliability assessment under the vague environment. Appl. Soft Comput. 2011, 11(2):1614-1622.
-
(2011)
Appl. Soft Comput.
, vol.11
, Issue.2
, pp. 1614-1622
-
-
Taheri, S.1
Zarei, R.2
-
19
-
-
79958085016
-
Reliability analysis of waste clean-up manipulator using genetic algorithms and fuzzy methodology
-
Kumar N., Borm J.-H., Kumar A. Reliability analysis of waste clean-up manipulator using genetic algorithms and fuzzy methodology. Comput. Oper. Res. 2012, 39(2):310-319.
-
(2012)
Comput. Oper. Res.
, vol.39
, Issue.2
, pp. 310-319
-
-
Kumar, N.1
Borm, J.-H.2
Kumar, A.3
-
20
-
-
33644911753
-
A fuzzy modeling application of cream methodology for human reliability analysis
-
Konstandinidou M., Nivolianitou Z., Kiranoudis C., Markatos N. A fuzzy modeling application of cream methodology for human reliability analysis. Reliab. Eng. Syst. Safety 2006, 91(6):706-716.
-
(2006)
Reliab. Eng. Syst. Safety
, vol.91
, Issue.6
, pp. 706-716
-
-
Konstandinidou, M.1
Nivolianitou, Z.2
Kiranoudis, C.3
Markatos, N.4
-
21
-
-
34247149693
-
Assessment of human reliability factors: a fuzzy cognitive maps approach
-
Bertolini M. Assessment of human reliability factors: a fuzzy cognitive maps approach. Int. J. Indus. Ergonom. 2007, 37(5):405-413.
-
(2007)
Int. J. Indus. Ergonom.
, vol.37
, Issue.5
, pp. 405-413
-
-
Bertolini, M.1
-
22
-
-
77952543377
-
Fuzzy logic-based approach for identifying the risk importance of human error
-
Li P.-C., hua Chen G., cao Dai L., Li Z. Fuzzy logic-based approach for identifying the risk importance of human error. Safety Sci. 2010, 48(7):902-913.
-
(2010)
Safety Sci.
, vol.48
, Issue.7
, pp. 902-913
-
-
Li, P.-C.1
hua Chen, G.2
cao Dai, L.3
Li, Z.4
-
23
-
-
0000374817
-
Genetic algorithms for reliability design problems
-
Hsieh Y.C., Chen T.C., Bricker D.L. Genetic algorithms for reliability design problems. Microelect. Reliab. 1998, 38:1599-1605.
-
(1998)
Microelect. Reliab.
, vol.38
, pp. 1599-1605
-
-
Hsieh, Y.C.1
Chen, T.C.2
Bricker, D.L.3
-
24
-
-
0032637938
-
Optimal process parameter determination for computer-aided manufacturing
-
Jeang A. Optimal process parameter determination for computer-aided manufacturing. Quality Reliab. Eng. Int. 1999, 15:3-16.
-
(1999)
Quality Reliab. Eng. Int.
, vol.15
, pp. 3-16
-
-
Jeang, A.1
-
25
-
-
84857031994
-
Availability Allocation of Series-Parallel System Solved from Object-Oriented Planning, Master's Thesis, Feng-Chia University, Taichung, Taiwan
-
Z.L. Li, Availability Allocation of Series-Parallel System Solved from Object-Oriented Planning, Master's Thesis, Feng-Chia University, Taichung, Taiwan, 2001.
-
(2001)
-
-
Li, Z.L.1
-
26
-
-
0346341077
-
A heuristic for solving the redundancy allocation problem for multistate series-parallel systems
-
Ramirez-Marquez J.E., Coit D. A heuristic for solving the redundancy allocation problem for multistate series-parallel systems. Reliab. Eng. Syst. Safety 2004, 83(3):341-349.
-
(2004)
Reliab. Eng. Syst. Safety
, vol.83
, Issue.3
, pp. 341-349
-
-
Ramirez-Marquez, J.E.1
Coit, D.2
-
27
-
-
20144363350
-
Reliability allocation problem in a series-parallel system
-
Yalaoui C.C., Chatelet E. Reliability allocation problem in a series-parallel system. Reliab. Eng. Syst. Safety 2005, 90:55-61.
-
(2005)
Reliab. Eng. Syst. Safety
, vol.90
, pp. 55-61
-
-
Yalaoui, C.C.1
Chatelet, E.2
-
28
-
-
10644225225
-
An efficient heuristic for series-parallel redundant reliability problems
-
You P.-S., Chen T.-C. An efficient heuristic for series-parallel redundant reliability problems. Comput. Oper. Res. 2005, 32:2117-2127.
-
(2005)
Comput. Oper. Res.
, vol.32
, pp. 2117-2127
-
-
You, P.-S.1
Chen, T.-C.2
-
29
-
-
40849126673
-
A novel state selection technique for power system reliability evaluation
-
Liu H., Sun Y., Wang P., Lin C., Goel L. A novel state selection technique for power system reliability evaluation. Elect. Power Syst. Res. 2008, 78:1019-1027.
-
(2008)
Elect. Power Syst. Res.
, vol.78
, pp. 1019-1027
-
-
Liu, H.1
Sun, Y.2
Wang, P.3
Lin, C.4
Goel, L.5
-
30
-
-
34248512218
-
A knowledge management system for series-parallel availability optimization and design
-
Juang Y.-S., Lin S.-S., Kao H.-P. A knowledge management system for series-parallel availability optimization and design. Expert Syst. Appl. 2008, 34:181-193.
-
(2008)
Expert Syst. Appl.
, vol.34
, pp. 181-193
-
-
Juang, Y.-S.1
Lin, S.-S.2
Kao, H.-P.3
-
31
-
-
55749096731
-
Multi-objective reliability optimization for dissimilar-unit cold-standby systems using a genetic algorithm
-
Azaron A., Perkgoz C., Katagiri H., Kato K., Sakawa M. Multi-objective reliability optimization for dissimilar-unit cold-standby systems using a genetic algorithm. Comput. Oper. Res. 2009, 36(5):1562-1571.
-
(2009)
Comput. Oper. Res.
, vol.36
, Issue.5
, pp. 1562-1571
-
-
Azaron, A.1
Perkgoz, C.2
Katagiri, H.3
Kato, K.4
Sakawa, M.5
-
32
-
-
77949487354
-
Reliability stochastic optimization for a series system with interval component reliability via genetic algorithm
-
Bhunia A., Sahoo L., Roy D. Reliability stochastic optimization for a series system with interval component reliability via genetic algorithm. Appl. Math. Comput. 2010, 216(3):929-939.
-
(2010)
Appl. Math. Comput.
, vol.216
, Issue.3
, pp. 929-939
-
-
Bhunia, A.1
Sahoo, L.2
Roy, D.3
-
33
-
-
78049385187
-
Redundancy allocation problems considering systems with imperfect repairs using multi-objective genetic algorithms and discrete event simulation
-
Lins I.D., Droguett E.L. Redundancy allocation problems considering systems with imperfect repairs using multi-objective genetic algorithms and discrete event simulation. Simul. Model. Practice Theory 2011, 19(1):362-381.
-
(2011)
Simul. Model. Practice Theory
, vol.19
, Issue.1
, pp. 362-381
-
-
Lins, I.D.1
Droguett, E.L.2
-
34
-
-
0024645936
-
Petri nets: properties, analysis and applications
-
Murata T. Petri nets: properties, analysis and applications. Proc. IEEE 1989, 77(4):541-580.
-
(1989)
Proc. IEEE
, vol.77
, Issue.4
, pp. 541-580
-
-
Murata, T.1
-
36
-
-
0030412494
-
Parallel and distributed simulation of free choice petri nets
-
Baccelli F., Serguei F.N., Gaujal B. Parallel and distributed simulation of free choice petri nets. IEEE Trans. Automat. Contr. 1996, 41(12):1751-1777.
-
(1996)
IEEE Trans. Automat. Contr.
, vol.41
, Issue.12
, pp. 1751-1777
-
-
Baccelli, F.1
Serguei, F.N.2
Gaujal, B.3
-
37
-
-
0031197341
-
The application of petri nets to failure analysis
-
Liu T., Chiou S. The application of petri nets to failure analysis. Reliab. Eng. Syst. Safety 1997, 57:129-142.
-
(1997)
Reliab. Eng. Syst. Safety
, vol.57
, pp. 129-142
-
-
Liu, T.1
Chiou, S.2
-
38
-
-
0036604346
-
Analysis of sequential failure for assessment of reliability and safety of manufacturing systems
-
Adamyan A., He D. Analysis of sequential failure for assessment of reliability and safety of manufacturing systems. Reliab. Eng. Syst. Safety 2002, 76(3):227-236.
-
(2002)
Reliab. Eng. Syst. Safety
, vol.76
, Issue.3
, pp. 227-236
-
-
Adamyan, A.1
He, D.2
-
39
-
-
0036055701
-
Failure and safety assessment of systems using petri nets
-
in: Proceeding of IEEE International Conference on Robotics and Automation, Washington, DC
-
A. Adamyan, D. He, Failure and safety assessment of systems using petri nets, in: Proceeding of IEEE International Conference on Robotics and Automation, Washington, DC, 2002, pp. 1919-1924.
-
(2002)
, pp. 1919-1924
-
-
Adamyan, A.1
He, D.2
|