메뉴 건너뛰기




Volumn , Issue , 2006, Pages 275-281

Prediction of shield tunneling influences on ground deformation based on the construction process

Author keywords

[No Author keywords available]

Indexed keywords

BACKFILL PRESSURE; CONSTRUCTION DATA; CONSTRUCTION PROCESS; DIFFERENTIAL PRESSURES; FEM ANALYSIS; GROUND DEFORMATIONS; IN-SITU OBSERVATIONS; INITIAL STRESS; LOADING CONDITION; LOADING MODELS; SHIELD TUNNELING;

EID: 84856911417     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (5)

References (1)
  • 1
    • 84856879848 scopus 로고    scopus 로고
    • Relationship between construction condition of shield tunnel and ground deformation in diluvial clay deposit
    • (in Japanese)
    • Kojima, S., Ohe, T., Hashimoto, T. & Nagaya, J., 2002, Relationship between construction condition of shield tunnel and ground deformation in diluvial clay deposit. 37th Japanese Geotechnical Society Conference (in Japanese).
    • (2002) 37th Japanese Geotechnical Society Conference
    • Kojima, S.1    Ohe, T.2    Hashimoto, T.3    Nagaya, J.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.