메뉴 건너뛰기




Volumn 2, Issue , 2011, Pages 1450-1463

Innovative method of gas shale well intervention with coiled tubing/jointed tubing hybrid string

Author keywords

[No Author keywords available]

Indexed keywords

BOREHOLES; COST EFFECTIVENESS; HORIZONTAL WELLS; INFILL DRILLING; OIL WELLS; PUMPS; SHALE GAS; WELL COMPLETION;

EID: 84856680207     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.2118/146413-ms     Document Type: Conference Paper
Times cited : (4)

References (8)
  • 1
    • 84856675721 scopus 로고    scopus 로고
    • Energy Information Association. Graphic map
    • Energy Information Association. 2011. Shale Plays and Sedimentary Basins. Graphic map.
    • (2011) Shale Plays and Sedimentary Basins
  • 8
    • 84856668319 scopus 로고    scopus 로고
    • Tudor Pickering Holt & Co. Graph
    • Tudor Pickering Holt & Co. 2011. U.S. Land Horizontal Rig Count. Graph.
    • (2011) U.S. Land Horizontal Rig Count


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.