메뉴 건너뛰기




Volumn 134, Issue 1, 2012, Pages

Simultaneous consideration of scalable-reconfigurable manufacturing system investment and operating costs

Author keywords

inventory control; manufacturing system design; multiple products; optimization; scalable reconfigurable equipment

Indexed keywords

COMPUTER AIDED MANUFACTURING; DECISION MAKING; GENETIC ALGORITHMS; INVENTORY CONTROL; INVESTMENTS; ITERATIVE METHODS; MANUFACTURE; OPERATING COSTS; OPTIMIZATION; PRODUCT DESIGN; SYSTEMS ANALYSIS;

EID: 84856051332     PISSN: 10871357     EISSN: 15288935     Source Type: Journal    
DOI: 10.1115/1.4005305     Document Type: Article
Times cited : (15)

References (27)
  • 7
    • 0038176421 scopus 로고    scopus 로고
    • Design principles for machining system configurations
    • 10.1016/S0007-8506(07)61516-9
    • Spicer, P., Koren, Y., Shpitalni, M., and Yip-Hoi, D., 2002, Design Principles for Machining System Configurations., CIRP Ann.-Manuf. Technol., 51 (1), pp. 275-280. 10.1016/S0007-8506(07)61516-9
    • (2002) CIRP Ann.-Manuf. Technol. , vol.51 , Issue.1 , pp. 275-280
    • Spicer, P.1    Koren, Y.2    Shpitalni, M.3    Yip-Hoi, D.4
  • 8
    • 34248137532 scopus 로고    scopus 로고
    • Integrating reconfiguration cost into the design of multi-period scalable reconfigurable manufacturing systems
    • DOI 10.1115/1.2383196
    • Spicer, P., and Carlo, H. J., 2007, Integrating Reconfiguration Cost Into the Design of Multi-Period Scalable Reconfigurable Manufacturing Systems., ASME J. Manuf. Sci. Eng., 129 (1), pp. 202-210. 10.1115/1.2383196 (Pubitemid 46723459)
    • (2007) Journal of Manufacturing Science and Engineering, Transactions of the ASME , vol.129 , Issue.1 , pp. 202-210
    • Spicer, P.1    Carlo, H.J.2
  • 9
    • 0034250590 scopus 로고    scopus 로고
    • Reconfigurable manufacturing systems: Key to future manufacturing
    • 10.1023/A:1008930403506
    • Mehrabi, M. G., Ulsoy, A. G., and Koren, Y., 2000, Reconfigurable Manufacturing Systems: Key to Future Manufacturing., J. Intell. Manuf., 11 (4), pp. 403-419. 10.1023/A:1008930403506
    • (2000) J. Intell. Manuf. , vol.11 , Issue.4 , pp. 403-419
    • Mehrabi, M.G.1    Ulsoy, A.G.2    Koren, Y.3
  • 10
    • 34548237689 scopus 로고    scopus 로고
    • Design principles of reconfigurable machines
    • DOI 10.1007/s00170-006-0615-2
    • Katz, R., 2006, Design Principles of Reconfigurable Machines., Int. J. Adv. Manuf. Technol., 34 (5-6), pp. 430-439. 10.1007/s00170-006-0615-2 (Pubitemid 47326505)
    • (2007) International Journal of Advanced Manufacturing Technology , vol.34 , Issue.5-6 , pp. 430-439
    • Katz, R.1
  • 11
    • 0031620001 scopus 로고    scopus 로고
    • Impact of manufacturing system configuration on performance
    • 10.1016/S0007-8506(07)62853-4
    • Koren, Y., Hu, S. J., and Weber, T. W., 1998, Impact of Manufacturing System Configuration on Performance., CIRP Ann.-Manuf. Technol., 47 (1), pp. 369-372. 10.1016/S0007-8506(07)62853-4
    • (1998) CIRP Ann.-Manuf. Technol. , vol.47 , Issue.1 , pp. 369-372
    • Koren, Y.1    Hu, S.J.2    Weber, T.W.3
  • 12
    • 0042844639 scopus 로고    scopus 로고
    • Designing productive manufacturing systems without buffers
    • 10.1016/S0007-8506(07)60542-3
    • Freiheit, T., Shpitalni, M., Hu, S. J., and Koren, Y., 2003, Designing Productive Manufacturing Systems Without Buffers., CIRP Ann.-Manuf. Technol., 52 (1), pp. 105-108. 10.1016/S0007-8506(07)60542-3
    • (2003) CIRP Ann.-Manuf. Technol. , vol.52 , Issue.1 , pp. 105-108
    • Freiheit, T.1    Shpitalni, M.2    Hu, S.J.3    Koren, Y.4
  • 14
    • 31444433147 scopus 로고    scopus 로고
    • Scalable reconfigurable equipment design principles
    • DOI 10.1080/00268970500183042, PII G8623622340254
    • Spicer, P., Yip-Hoi, D., and Koren, Y., 2005, Scalable Reconfigurable Equipment Design Principles., Int. J. Prod. Res., 43 (22), pp. 4839-4852. 10.1080/00268970500183042 (Pubitemid 43148850)
    • (2005) International Journal of Production Research , vol.43 , Issue.22 , pp. 4839-4852
    • Spicer, P.1    Yip-Hoi, D.2    Koren, Y.3
  • 17
    • 21944442121 scopus 로고    scopus 로고
    • Concurrent line-balancing, equipment selection and throughput analysis for multi-part optimal line design
    • (Proceedings of the CIRP 2nd International Conference on Reconfigurable Manufacturing, Ann Arbor, MI, 2003), , 10.1515/IJMSP.2004.61-2.71
    • Tang, L., Yip-Hoi, D. M., Wang, W., and Koren, Y., 2004, Concurrent Line-balancing, Equipment Selection and Throughput Analysis for Multi-part Optimal Line Design., (Proceedings of the CIRP 2nd International Conference on Reconfigurable Manufacturing, Ann Arbor, MI, 2003) Int. J. Manuf. Sci. Prod., 6 (1), pp. 71-81. 10.1515/IJMSP.2004.61-2.71
    • (2004) Int. J. Manuf. Sci. Prod. , vol.6 , Issue.1 , pp. 71-81
    • Tang, L.1    Yip-Hoi, D.M.2    Wang, W.3    Koren, Y.4
  • 18
    • 22444435521 scopus 로고    scopus 로고
    • Optimal portfolio of reconfigurable and dedicated capacity under uncertainty
    • University of Michigan, Ann Arbor, MI.
    • Narongwanich, W., Duenyas, I., and Birge, J. R., 2002, Optimal Portfolio of Reconfigurable and Dedicated Capacity Under Uncertainty., Working paper, University of Michigan, Ann Arbor, MI.
    • (2002) Working Paper
    • Narongwanich, W.1    Duenyas, I.2    Birge, J.R.3
  • 19
    • 33847710649 scopus 로고    scopus 로고
    • Investigating Optimal Capacity Scalability Scheduling in a Reconfigurable Manufacturing System
    • 10.1007/s00170-005-0354-9
    • Deif, A. M., and ElMaraghy, W., 2006, Investigating Optimal Capacity Scalability Scheduling in a Reconfigurable Manufacturing System., Int. J. Adv. Manuf. Technol., 32 (5-6), pp. 557-562. 10.1007/s00170-005-0354-9
    • (2006) Int. J. Adv. Manuf. Technol. , vol.32 , Issue.5-6 , pp. 557-562
    • Deif, A.M.1    Elmaraghy, W.2
  • 20
    • 74249095498 scopus 로고    scopus 로고
    • Capacity reconfiguration management in reconfigurable manufacturing systems
    • 10.1007/s00170-009-2071-2
    • Renna, P., 2009, Capacity Reconfiguration Management in Reconfigurable Manufacturing Systems., Int. J. Adv. Manuf. Technol., 46 (1-4), pp. 395-404. 10.1007/s00170-009-2071-2
    • (2009) Int. J. Adv. Manuf. Technol. , vol.46 , Issue.1-4 , pp. 395-404
    • Renna, P.1
  • 21
    • 79953281016 scopus 로고    scopus 로고
    • Design of reconfigurable manufacturing systems
    • 10.1016/j.jmsy.2011.01.001
    • Koren, Y., and Shpitalni, M., 2010, Design of Reconfigurable Manufacturing Systems., J. Manuf. Syst., 29 (4), pp. 130-141. 10.1016/j.jmsy.2011.01.001
    • (2010) J. Manuf. Syst. , vol.29 , Issue.4 , pp. 130-141
    • Koren, Y.1    Shpitalni, M.2
  • 23
    • 28444439269 scopus 로고    scopus 로고
    • Reconfigurability and reconfigurable manufacturing systems - State-of-the-art review
    • 2004 2nd IEEE International Conference on Industrial Informatics: Collaborative Automation - One Key for Intelligent Industrial Environments, INDIN'04
    • Setchi, R. M., and Lagos, N., 2004, Reconfigurability and Reconfigurable Manufacturing Systems: State-of-the-Art Review., IEEE International Conference on Industrial Informatics, pp. 529-535. (Pubitemid 41731895)
    • (2004) 2nd IEEE International Conference on Industrial Informatics, INDIN'04 , pp. 529-535
    • Setchi, R.M.1    Lagos, N.2
  • 24
    • 36248974607 scopus 로고    scopus 로고
    • Reconfigurable manufacturing systems: The state of the art
    • DOI 10.1080/00207540600905646, PII 778815524
    • Bi, Z. M., Lang, S. Y. T., Shen, W., and Wang, L., 2008., Reconfigurable Manufacturing Systems: The State of the Art., Int. J. Prod. Res., 46 (4), pp. 967-992. 10.1080/00207540600905646 (Pubitemid 350136927)
    • (2008) International Journal of Production Research , vol.46 , Issue.4 , pp. 967-992
    • Bi, Z.M.1    Lang, S.Y.T.2    Shen, W.3    Wang, L.4
  • 27
    • 0004269080 scopus 로고    scopus 로고
    • PWC Publishing company, Boston, MA.
    • Heragu, S. S., 1997, Facilities Design, PWC Publishing company, Boston, MA.
    • (1997) Facilities Design
    • Heragu, S.S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.