메뉴 건너뛰기




Volumn 22, Issue 6, 2011, Pages 598-609

Newave Versus ODIN: Comparison of stochastic and deterministic models for the long term hydropower scheduling of the Interconnected Brazilian System

Author keywords

Long term hydrothermal scheduling; NEWAVE model; Nonlinear optimization; ODIN model; Power systems; Reservoir operation; Stochastic optimization

Indexed keywords

BRAZILIAN POWER SYSTEMS; BRAZILIAN SYSTEM; DETERMINISTIC APPROACH; DETERMINISTIC MODELS; ECONOMIC OPERATIONS; EFFICIENT USE OF WATER; EXPANSION PLANS; HYDRO-SYSTEM; HYDROPOWER SCHEDULING; HYDROTHERMAL SCHEDULING; NON-LINEAR OPTIMIZATION ALGORITHMS; NONLINEAR OPTIMIZATION; OPERATION PLANNING; OPTIMAL DISPATCH; PIECEWISE LINEAR APPROXIMATIONS; PROGRAMMING SOLUTIONS; RESERVOIR OPERATION; STOCHASTIC APPROACH; STOCHASTIC DUAL DYNAMIC PROGRAMMING; STOCHASTIC OPTIMIZATIONS;

EID: 84856034234     PISSN: 01031759     EISSN: None     Source Type: Journal    
DOI: 10.1590/S0103-17592011000600005     Document Type: Article
Times cited : (16)

References (29)
  • 2
    • 64449087742 scopus 로고    scopus 로고
    • Interior point method for long-term generation scheduling of large-scale hydrothermal systems
    • Azevedo, A.T., Oliveira, A.R.L. and Soares, S. (2009). Interior point method for long-term generation scheduling of large-scale hydrothermal systems. Annals of Operations Research, pp. 55-80.
    • (2009) Annals of Operations Research , pp. 55-80
    • Azevedo, A.T.1    Oliveira, A.R.L.2    Soares, S.3
  • 3
    • 0003787146 scopus 로고
    • Princeton University Press Princeton, NJ
    • Bellman, R.E. (1957). Dynamic Programming. Princeton University Press, Princeton, NJ.
    • (1957) Dynamic Programming
    • Bellman, R.E.1
  • 6
    • 84978680901 scopus 로고    scopus 로고
    • CEPEL, Relatório Técnico, CEPEL, Rio de Janeiro, RJ
    • CEPEL, (2001). Manual de Referência - Modelo NEWAVE. Relatório Técnico, CEPEL, Rio de Janeiro, RJ.
    • (2001) Manual de Referência - Modelo NEWAVE
  • 8
    • 0019039870 scopus 로고
    • Determining operating policies for a water resources system
    • Dagli, C. H. and Miles, J.F. (1980). Determining Operating Policies for a Water Resources System, Journal of Hydrology, Vol.47, pp. 297-306.
    • (1980) Journal of Hydrology , vol.47 , pp. 297-306
    • Dagli, C.H.1    Miles, J.F.2
  • 9
    • 0002032211 scopus 로고
    • Scenario optimization
    • Dembo, R.S. (1991). Scenario optimization. Annals of Operations Research. Vol. 30, No. 1, pp.63-80.
    • (1991) Annals of Operations Research , vol.30 , Issue.1 , pp. 63-80
    • Dembo, R.S.1
  • 13
    • 0030148466 scopus 로고    scopus 로고
    • Hydropower generation management under uncertainty via scenario analysis and parallel computation
    • Escudero, L.F., de la Fuente, J.L., Garcia, C. and Prieto, F.J. (1996). Hydropower generation management under uncertainty via scenario analysis and parallel computation. IEEE Trans. on Power Systems. Vol. 11, No.2, pp. 683-689. (Pubitemid 126781201)
    • (1996) IEEE Transactions on Power Systems , vol.11 , Issue.2 , pp. 683-689
    • Escudero, L.F.1    Garcia, C.2    De La Fuente Iberdrola, J.L.3    Prieto, F.J.4
  • 14
    • 1842686887 scopus 로고    scopus 로고
    • Optimal operation of multireservoir systems: State-of-the-art review
    • DOI 10.1061/(ASCE)0733-9496(2004)130:2(93)
    • Labadie, J.W. (2004). Optimal Operation of Multireservoir Systems: State-of-the-art Review. Journal of Water Resources Planning and Management, Vol. 130, No. 2, pp. 93-111. (Pubitemid 38459486)
    • (2004) Journal of Water Resources Planning and Management , vol.130 , Issue.2 , pp. 93-111
    • Labadie, J.W.1
  • 16
    • 0036578031 scopus 로고    scopus 로고
    • Comparison between closed-loop and partial open-loop feedback control policies in long term hydrothermal scheduling
    • DOI 10.1109/TPWRS.2002.1007900, PII S0885895002038270
    • Martinez, L. and Soares, S. (2001) Comparison between Closed-Loop and Partial Open-Loop Feedback Control Policies in Long-term Hydro-thermal Scheduling. IEEE Trans. on Power Systems. Vol. 17, No. 2, pp. 330-336. (Pubitemid 34741694)
    • (2002) IEEE Transactions on Power Systems , vol.17 , Issue.2 , pp. 330-336
    • Martinez, L.1    Soares, S.2
  • 17
    • 0029356873 scopus 로고
    • A second-order network flow algorithm for hydro-thermal scheduling
    • Oliveira G.G. and Soares S. (1995). A Second-Order Network Flow Algorithm for Hydro-thermal Scheduling", IEEE Trans. on Power Systems. Vol. 10, No. 3, pp. 1652-1641.
    • (1995) IEEE Trans. on Power Systems , vol.10 , Issue.3 , pp. 1652-1641
    • Oliveira, G.G.1    Soares, S.2
  • 18
    • 0022185792 scopus 로고
    • Stochastic optimization of multireservoir hydroelectric system: A decomposition approach
    • Pereira, M.V.F. and Pinto, L.M.V.G. (1985) Stochastic Optimization of Multireservoir Hydroelectric System: A Decomposition Approach. Water Resources Research, Vol.21, No.6, pp. 779-792.
    • (1985) Water Resources Research , vol.21 , Issue.6 , pp. 779-792
    • Pereira, M.V.F.1    Pinto, L.M.V.G.2
  • 19
    • 34249928584 scopus 로고
    • Multi-stage stochastic optimization applied to energy planning
    • Pereira, M.V.F. and Pinto, L.M.V.G. (1991). Multi-stage stochastic optimization applied to energy planning. Mathematical Programming, 52(2) , 359-375. (Pubitemid 21692143)
    • (1991) Mathematical Programming, Series B , vol.52 , Issue.2 , pp. 359-375
    • Pereira, M.V.F.1    Pinto, L.M.V.G.2
  • 20
    • 0344604482 scopus 로고    scopus 로고
    • Limitations of deterministic optimization applied to reservoir operations
    • DOI 10.1061/(ASCE)0733-9496(1999)125:3(135)
    • Philbrick, C. R. and Kitanidis, P.K. (1999). Limitations of Deterministic Optimization Applied to Reservoir Operations. Jour. of Water Res. Planning Management, Vol. 125, No. 3, pp. 135-142. (Pubitemid 29377570)
    • (1999) Journal of Water Resources Planning and Management , vol.125 , Issue.3 , pp. 135-142
    • Philbrick Jr., C.R.1    Kitanidis, P.K.2
  • 21
    • 0019589729 scopus 로고
    • A nonlinear network flow algorithm for maximization of benefits in a hydroelectric power system
    • Rosenthal, R.E. (1981) A nonlinear network flow algorithm for maximization of benefits in a hydroelectric power system. Operations Research. Vol. 29, No. 4, pp. 763-785.
    • (1981) Operations Research , vol.29 , Issue.4 , pp. 763-785
    • Rosenthal, R.E.1
  • 22
    • 0021171818 scopus 로고
    • Stochastic dynamic programming models for reservoir operation optimization
    • Stedinger, J.R., Sule, B. F. and Loucks,D. P. (1984). Stochastic Dynamic Programming Models for Reservoir Operation Optimization. Water Resources Research, Vol. 20, No. 11, pp. 1499-1505.
    • (1984) Water Resources Research , vol.20 , Issue.11 , pp. 1499-1505
    • Stedinger, J.R.1    Sule, B.F.2    Loucks, D.P.3
  • 23
    • 0016627296 scopus 로고
    • Generalized certainty equivalence and dual effect in stochastic control
    • Tse, E. and Bar Shalom, Y. (1975). Generalized certainty equivalence and dual effect in stochastic control. IEEE Transactions on Optimal Control. AC. 20, pp. 817-819.
    • (1975) IEEE Transactions on Optimal Control. AC , vol.20 , pp. 817-819
    • Tse, E.1    Bar Shalom, Y.2
  • 24
    • 0019008420 scopus 로고
    • Optimal operation of multireservoir power systems with stochastic inflows
    • Turgeon, A. (1980). Optimal operation of multireservoir systems with stochastic inflows. Water Resources Research. Vol. 16, No 2, pp.275-283. (Pubitemid 10476464)
    • (1980) Water Resources Research , vol.16 , Issue.2 , pp. 275-283
    • Turgeon Andre1
  • 26
    • 74949093858 scopus 로고    scopus 로고
    • Long- term hydropower scheduling based on deterministic nonlinear optimization and annual inflow forecasting models
    • Bucarest, Romania
    • Zambelli, M., Luna, I. and Soares, S (2009). Long- Term Hydropower Scheduling Based on Deterministic Nonlinear Optimization and Annual Inflow Forecasting Models. In: 2009 IEEE Bucarest Power Tech, Bucarest, Romania.
    • (2009) 2009 IEEE Bucarest Power Tech
    • Zambelli, M.1    Luna, I.2    Soares, S.3
  • 28
    • 84856065195 scopus 로고    scopus 로고
    • Newave versus odin comparação entre modelo estocástico e determinístico no planejamento da operação energética do sistema interligado nacional
    • Bonito-MS
    • Zambelli, M., Toscano, A. E., Soares, S., Santos, E. F. and Nogueira, L. (2010). Newave Versus Odin Comparação Entre Modelo Estocástico e Determinístico No Planejamento da Operação Energética do Sistema Interligado Nacional. XVIII Congresso Brasileiro de Automática, Bonito-MS, pp. 347-354.
    • (2010) XVIII Congresso Brasileiro de Automática , pp. 347-354
    • Zambelli, M.1    Toscano, A.E.2    Soares, S.3    Santos, E.F.4    Nogueira, L.5
  • 29
    • 84856065523 scopus 로고    scopus 로고
    • Planejamento da operação energética do sistema interligado nacional baseado em modelo de controle preditivo
    • FEEC/UNICAMP, Campinas
    • Zambelli, M.S. (2009). Planejamento da Operação Energética do Sistema Interligado Nacional Baseado em Modelo de Controle Preditivo, Tese de doutorado, FEEC/UNICAMP, Campinas.
    • (2009) Tese de Doutorado
    • Zambelli, M.S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.