메뉴 건너뛰기




Volumn 36, Issue 5, 2012, Pages 2003-2016

Stochastic dynamic lot-sizing problem using bi-level programming base on artificial intelligence techniques

Author keywords

Ant colony optimization; Artificial neural network; Deteriorating commodity; Lot sizing problem; Simulation

Indexed keywords

ANT-COLONY OPTIMIZATION; ARTIFICIAL NEURAL NETWORK; DETERIORATING COMMODITY; LOT SIZING PROBLEMS; SIMULATION;

EID: 84855834187     PISSN: 0307904X     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.apm.2011.08.017     Document Type: Article
Times cited : (14)

References (31)
  • 1
    • 0031119856 scopus 로고    scopus 로고
    • Strategic production-distribution models
    • Vidal C.J., Goetschalckx M. Strategic production-distribution models. Eur. J. Oper. Res. 1997, 98:1-18.
    • (1997) Eur. J. Oper. Res. , vol.98 , pp. 1-18
    • Vidal, C.J.1    Goetschalckx, M.2
  • 2
    • 0024159073 scopus 로고
    • A general bilevel linear programming formulation of the network design problem
    • Ben-Ayed O., Boyce D.E., Blair C.E. A general bilevel linear programming formulation of the network design problem. Transport Res. B 1988, 22:311-318.
    • (1988) Transport Res. B , vol.22 , pp. 311-318
    • Ben-Ayed, O.1    Boyce, D.E.2    Blair, C.E.3
  • 3
    • 33751533468 scopus 로고    scopus 로고
    • A natural gas cash-out problem: a bilevel programming framework and a penalty function method
    • Kalashnikov V.V., Ríos-Mercado R.Z. A natural gas cash-out problem: a bilevel programming framework and a penalty function method. Optimiz. Eng. 2006, 7:403-420.
    • (2006) Optimiz. Eng. , vol.7 , pp. 403-420
    • Kalashnikov, V.V.1    Ríos-Mercado, R.Z.2
  • 4
    • 24144436123 scopus 로고    scopus 로고
    • A simplex approach for finding local solutions of a linear bilevel program by equilibrium points
    • Campêlo M., Scheimberg S. A simplex approach for finding local solutions of a linear bilevel program by equilibrium points. Ann. Oper. Res. 2005, 138:143-157.
    • (2005) Ann. Oper. Res. , vol.138 , pp. 143-157
    • Campêlo, M.1    Scheimberg, S.2
  • 5
    • 33646595306 scopus 로고    scopus 로고
    • Interactive fuzzy programming approach to bi-level quadratic fractional programming problems
    • Mishra S., Ghosh A. Interactive fuzzy programming approach to bi-level quadratic fractional programming problems. Ann. Oper. Res. 2006, 143:251-263.
    • (2006) Ann. Oper. Res. , vol.143 , pp. 251-263
    • Mishra, S.1    Ghosh, A.2
  • 6
    • 24044516145 scopus 로고    scopus 로고
    • A trust-region method for nonlinear bilevel programming: algorithm and computational experience
    • Colson B., Marcotte P., Savard G. A trust-region method for nonlinear bilevel programming: algorithm and computational experience. Comput. Optimiz. Appl. 2005, 30:211-227.
    • (2005) Comput. Optimiz. Appl. , vol.30 , pp. 211-227
    • Colson, B.1    Marcotte, P.2    Savard, G.3
  • 7
    • 5744227918 scopus 로고    scopus 로고
    • Warehouse space capacity and delivery time window considerations in dynamic lot-sizing for a simple supply chain
    • Jaruphongsa W., Cetinkaya S., Lee C.Y. Warehouse space capacity and delivery time window considerations in dynamic lot-sizing for a simple supply chain. Int. J. Prod. Econ. 2004, 92:169-180.
    • (2004) Int. J. Prod. Econ. , vol.92 , pp. 169-180
    • Jaruphongsa, W.1    Cetinkaya, S.2    Lee, C.Y.3
  • 8
    • 70449108134 scopus 로고    scopus 로고
    • Optimal lot size for an item with partial backlogging rate when demand is stimulated by inventory above a certain stock level
    • Hsieh T.P., Dye C.Y., Ouyang L.Y. Optimal lot size for an item with partial backlogging rate when demand is stimulated by inventory above a certain stock level. Math. Comput. Modell. 2010, 51:13-32.
    • (2010) Math. Comput. Modell. , vol.51 , pp. 13-32
    • Hsieh, T.P.1    Dye, C.Y.2    Ouyang, L.Y.3
  • 9
    • 42749094507 scopus 로고    scopus 로고
    • A comparative study of modeling and solution approaches for the coordinated lot-size problem with dynamic demand
    • Gao L.L., Altay N., Robinson E.P. A comparative study of modeling and solution approaches for the coordinated lot-size problem with dynamic demand. Math. Comput. Modell. 2008, 47:1254-1263.
    • (2008) Math. Comput. Modell. , vol.47 , pp. 1254-1263
    • Gao, L.L.1    Altay, N.2    Robinson, E.P.3
  • 10
    • 3042807721 scopus 로고    scopus 로고
    • A dynamic model for inventory lot sizing and outbound shipment scheduling at a third-party warehouse
    • Lee C.Y., Cetinkaya S., Jaruphongsa W. A dynamic model for inventory lot sizing and outbound shipment scheduling at a third-party warehouse. Oper. Res. 2003, 51:735-747.
    • (2003) Oper. Res. , vol.51 , pp. 735-747
    • Lee, C.Y.1    Cetinkaya, S.2    Jaruphongsa, W.3
  • 11
    • 0032210423 scopus 로고    scopus 로고
    • Hybrid heuristics for the capacitated lot sizing and loading problem with setup times and overtime decisions
    • Özdamar L., Birbil S.I. Hybrid heuristics for the capacitated lot sizing and loading problem with setup times and overtime decisions. Eur. J. Oper. Res. 1998, 110:525-547.
    • (1998) Eur. J. Oper. Res. , vol.110 , pp. 525-547
    • Özdamar, L.1    Birbil, S.I.2
  • 12
    • 65349186076 scopus 로고    scopus 로고
    • Replenishment policy with deteriorating raw material under a supply chain: complexity and the use of ant colony optimization
    • Wong J.T., Chen K.H., Su C.T. Replenishment policy with deteriorating raw material under a supply chain: complexity and the use of ant colony optimization. Lect. Notes Business Inform. Process. 2009, 20:142-152.
    • (2009) Lect. Notes Business Inform. Process. , vol.20 , pp. 142-152
    • Wong, J.T.1    Chen, K.H.2    Su, C.T.3
  • 13
    • 33748740896 scopus 로고    scopus 로고
    • Comparison of dynamic scheduling policies for hybrid make-to-order and make-to-stock production systems with stochastic demand
    • Soman C.A., Pieter van Donk D., Gaalman G. Comparison of dynamic scheduling policies for hybrid make-to-order and make-to-stock production systems with stochastic demand. Int. J. Prod. Econ. 2006, 104:441-453.
    • (2006) Int. J. Prod. Econ. , vol.104 , pp. 441-453
    • Soman, C.A.1    Pieter van Donk, D.2    Gaalman, G.3
  • 14
    • 13544258667 scopus 로고    scopus 로고
    • Application of multi-steps forecasting for restraining the bullwhip effect and improving inventory performance under autoregressive demand
    • Chandra C., Grabis J. Application of multi-steps forecasting for restraining the bullwhip effect and improving inventory performance under autoregressive demand. Eur. J. Oper. Res. 2005, 166:337-350.
    • (2005) Eur. J. Oper. Res. , vol.166 , pp. 337-350
    • Chandra, C.1    Grabis, J.2
  • 15
    • 0030205643 scopus 로고    scopus 로고
    • Tracking signals in inventory control systems: a simulation study
    • Alstrøm P., Madsen P. Tracking signals in inventory control systems: a simulation study. Int. J. Prod. Econ. 1996, 45:293-302.
    • (1996) Int. J. Prod. Econ. , vol.45 , pp. 293-302
    • Alstrøm, P.1    Madsen, P.2
  • 16
    • 34249946015 scopus 로고    scopus 로고
    • Performance improvement of supply chain processes by coordinated inventory and capacity management
    • Jammemegg W., Reiner G. Performance improvement of supply chain processes by coordinated inventory and capacity management. Int. J. Prod. Econ. 2007, 108:183-190.
    • (2007) Int. J. Prod. Econ. , vol.108 , pp. 183-190
    • Jammemegg, W.1    Reiner, G.2
  • 17
    • 1542574913 scopus 로고    scopus 로고
    • The impact of electronic data inter change on reducing bullwhip effect and supply chain inventory costs
    • Machuca J.A.D., Barajas R.P. The impact of electronic data inter change on reducing bullwhip effect and supply chain inventory costs. Transport. Res. Part E: Logist. Transport. Rev. 2004, 40:209-228.
    • (2004) Transport. Res. Part E: Logist. Transport. Rev. , vol.40 , pp. 209-228
    • Machuca, J.A.D.1    Barajas, R.P.2
  • 18
    • 12244298221 scopus 로고    scopus 로고
    • Inventory inaccuracy and supply chain performance: a simulation study of a retail supply chain
    • Fleisch E., Tellkamp C. Inventory inaccuracy and supply chain performance: a simulation study of a retail supply chain. Int. J. Prod. Econ. 2005, 95:373-385.
    • (2005) Int. J. Prod. Econ. , vol.95 , pp. 373-385
    • Fleisch, E.1    Tellkamp, C.2
  • 19
    • 34249952080 scopus 로고    scopus 로고
    • A finite horizon inventory model: an operational framework
    • Ravichandran N. A finite horizon inventory model: an operational framework. Int. J. Prod. Econ. 2007, 108:406-415.
    • (2007) Int. J. Prod. Econ. , vol.108 , pp. 406-415
    • Ravichandran, N.1
  • 20
    • 77957756715 scopus 로고    scopus 로고
    • A new methodology for multi-echelon inventory management in stochastic and neuro-fuzzy environments
    • Gumus A.T., Guneri A.F., Ulengin F. A new methodology for multi-echelon inventory management in stochastic and neuro-fuzzy environments. Int. J. Prod. Econ. 2010, 128:248-260.
    • (2010) Int. J. Prod. Econ. , vol.128 , pp. 248-260
    • Gumus, A.T.1    Guneri, A.F.2    Ulengin, F.3
  • 21
    • 17444392764 scopus 로고    scopus 로고
    • Hierarchical supply chain planning using artificial neural networks to anticipate base-level outcomes
    • Rohde J. Hierarchical supply chain planning using artificial neural networks to anticipate base-level outcomes. OR Spectrum 2004, 26:471-492.
    • (2004) OR Spectrum , vol.26 , pp. 471-492
    • Rohde, J.1
  • 22
    • 33745620051 scopus 로고    scopus 로고
    • Production quantity allocation for order fulfillment in the supply chain: a neural network based approach
    • Lee Y.H., Jung J.W., Eum S.C., Park S.M., Nam H.K. Production quantity allocation for order fulfillment in the supply chain: a neural network based approach. Prod. Plan. Control 2006, 17:378-389.
    • (2006) Prod. Plan. Control , vol.17 , pp. 378-389
    • Lee, Y.H.1    Jung, J.W.2    Eum, S.C.3    Park, S.M.4    Nam, H.K.5
  • 23
    • 58349097295 scopus 로고    scopus 로고
    • A multi-echelon inventory management framework for stochastic and fuzzy supply chains
    • Gumus A.T., Guneri A.F. A multi-echelon inventory management framework for stochastic and fuzzy supply chains. Expert Syst. Appl. 2009, 36:5565-5575.
    • (2009) Expert Syst. Appl. , vol.36 , pp. 5565-5575
    • Gumus, A.T.1    Guneri, A.F.2
  • 24
    • 56349083178 scopus 로고    scopus 로고
    • A neural networks approach for forecasting the supplier's bid prices in supplier selection negotiation process
    • Lee C.C., Ou-Yang C. A neural networks approach for forecasting the supplier's bid prices in supplier selection negotiation process. Expert Syst. Appl. 2009, 36:2961-2970.
    • (2009) Expert Syst. Appl. , vol.36 , pp. 2961-2970
    • Lee, C.C.1    Ou-Yang, C.2
  • 25
    • 50149098833 scopus 로고    scopus 로고
    • Inventory lot-sizing with supplier selection using hybrid intelligent algorithm
    • Sadeghi Moghadam M.R., Afsar A., Sohrabi B. Inventory lot-sizing with supplier selection using hybrid intelligent algorithm. Appl. Soft Comput. 2008, 8:1523-1529.
    • (2008) Appl. Soft Comput. , vol.8 , pp. 1523-1529
    • Sadeghi Moghadam, M.R.1    Afsar, A.2    Sohrabi, B.3
  • 26
    • 34250199025 scopus 로고    scopus 로고
    • A framework for determining MIMO process parameters by neuro-DM&ACO approach
    • Wong J.T., Su C.T., Hsieh H.T. A framework for determining MIMO process parameters by neuro-DM&ACO approach. Int. J. Prod. Res. 2007, 45:3505-3520.
    • (2007) Int. J. Prod. Res. , vol.45 , pp. 3505-3520
    • Wong, J.T.1    Su, C.T.2    Hsieh, H.T.3
  • 27
    • 61449122008 scopus 로고    scopus 로고
    • Replenishment policy based on modified ant colony optimization and statistical analysis under the pre-order penetration point
    • Wong J.T., Su C.T., Chen K.H. Replenishment policy based on modified ant colony optimization and statistical analysis under the pre-order penetration point. Int. J. Comput. Math. 2009, 86:477-491.
    • (2009) Int. J. Comput. Math. , vol.86 , pp. 477-491
    • Wong, J.T.1    Su, C.T.2    Chen, K.H.3
  • 29
    • 15344350551 scopus 로고    scopus 로고
    • Maintenance scheduling and production control of multiple-machine manufacturing systems
    • Gharbi A., Kenné J.-P. Maintenance scheduling and production control of multiple-machine manufacturing systems. Comput. Ind. Eng. 2005, 48:693-707.
    • (2005) Comput. Ind. Eng. , vol.48 , pp. 693-707
    • Gharbi, A.1    Kenné, J.-P.2
  • 30
    • 0035247219 scopus 로고    scopus 로고
    • Project surface regions: a decision support methodology for multitasking workers assignment in JIT systems
    • Horng H.-C., Cochran J.K. Project surface regions: a decision support methodology for multitasking workers assignment in JIT systems. Comput. Ind. Eng. 2001, 39:159-171.
    • (2001) Comput. Ind. Eng. , vol.39 , pp. 159-171
    • Horng, H.-C.1    Cochran, J.K.2
  • 31
    • 79151479395 scopus 로고    scopus 로고
    • Supplier selection and performance evaluation in just-in-time production environments
    • Aksoy A., Öztürk N. Supplier selection and performance evaluation in just-in-time production environments. Expert Syst. Appl. 2011, 38:6351-6359.
    • (2011) Expert Syst. Appl. , vol.38 , pp. 6351-6359
    • Aksoy, A.1    Öztürk, N.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.