메뉴 건너뛰기




Volumn 17, Issue 3, 2011, Pages 445-458

Contribution-based profit-sharing scheme for joint ventures

Author keywords

Cooperation; Game theory; Joint venture; Profit sharing; Shapley value; Strategic alliance

Indexed keywords


EID: 84855811891     PISSN: 20294913     EISSN: 20294921     Source Type: Journal    
DOI: 10.3846/20294913.2011.580578     Document Type: Article
Times cited : (17)

References (27)
  • 2
    • 0032666456 scopus 로고    scopus 로고
    • Risk management in international construction joint ventures
    • doi:10.1061/(ASCE)0733-9364(1999)125:4(277)
    • Bing, L.; Tiong, R. L. K.; Fan, W. W.; Chew, D. A. S. 1999a. Risk management in international construction joint ventures, Journal of Construction Engineering and Management ASCE 125(4): 277-283. doi:10.1061/(ASCE)0733-9364(1999)125:4(277)
    • (1999) Journal of Construction Engineering and Management ASCE , vol.125 , Issue.4 , pp. 277-283
    • Bing, L.1    Tiong, R.L.K.2    Fan, W.W.3    Chew, D.A.S.4
  • 3
    • 0032646010 scopus 로고    scopus 로고
    • Risk management model for international construction joint ventures
    • doi:10.1061/(ASCE)0733-9364(1999)125:5(377)
    • Bing, L.; Tiong, R. L. K. 1999b. Risk management model for international construction joint ventures, Journal of Construction Engineering and Management ASCE 125(5): 377-384. doi:10.1061/(ASCE)0733-9364(1999)125:5(377)
    • (1999) Journal of Construction Engineering and Management ASCE , vol.125 , Issue.5 , pp. 377-384
    • Bing, L.1    Tiong, R.L.K.2
  • 4
    • 0002356344 scopus 로고    scopus 로고
    • An e-business model to support supply chain activities in construction
    • doi:10.1108/09576050110363239
    • Cheng, E. W. L.; Li, H.; Love, P. E. D.; Irani, Z. 2001. An e-business model to support supply chain activities in construction, Logistics Information Management 14: 68-77. doi:10.1108/09576050110363239
    • (2001) Logistics Information Management , vol.14 , pp. 68-77
    • Cheng, E.W.L.1    Li, H.2    Love, P.E.D.3    Irani, Z.4
  • 5
    • 0035576542 scopus 로고    scopus 로고
    • Subcontractor perspectives on supply chain alliances
    • doi:10.1080/01446190110089727
    • Dainty, A. R. J.; Briscoe, G. H.; Millett, S. J. 2001. Subcontractor perspectives on supply chain alliances, Construction Management and Economics 19(8): 841-848. doi:10.1080/01446190110089727
    • (2001) Construction Management and Economics , vol.19 , Issue.8 , pp. 841-848
    • Dainty, A.R.J.1    Briscoe, G.H.2    Millett, S.J.3
  • 6
    • 0031200040 scopus 로고    scopus 로고
    • Transaction analysis in deregulated power systems using game theory
    • doi:10.1109/59.630479
    • Ferrero, R. W.; Shahidefpour, S. M.; Ramesh, V. C. 1997. Transaction analysis in deregulated power systems using game theory, IEEE Transaction on Power Systems 12(3): 1340-1346. doi:10.1109/59.630479
    • (1997) IEEE Transaction on Power Systems , vol.12 , Issue.3 , pp. 1340-1346
    • Ferrero, R.W.1    Shahidefpour, S.M.2    Ramesh, V.C.3
  • 7
    • 12744258028 scopus 로고    scopus 로고
    • Bid compensation decision model for projects with costly bid preparation
    • doi:10.1061/(ASCE)0733-9364(2005)131:2(151)
    • Ho, S. P. 2005. Bid compensation decision model for projects with costly bid preparation, Journal of Construction Engineering and Management ASCE 131(2): 151-159. doi:10.1061/(ASCE)0733-9364(2005)131:2(151)
    • (2005) Journal of Construction Engineering and Management ASCE , vol.131 , Issue.2 , pp. 151-159
    • Ho, S.P.1
  • 8
    • 33745311301 scopus 로고    scopus 로고
    • Model for financial renegotiation in public-private partnership projects and its policy implication: Game theoretic view
    • doi:10.1061/(ASCE)0733-9364(2006)132:7(678)
    • Ho, S. P. 2006. Model for financial renegotiation in public-private partnership projects and its policy implication: game theoretic view, Journal of Construction Engineering and Management ASCE 132(7): 678-688. doi:10.1061/(ASCE)0733-9364(2006)132:7(678)
    • (2006) Journal of Construction Engineering and Management ASCE , vol.132 , Issue.7 , pp. 678-688
    • Ho, S.P.1
  • 9
    • 12744271290 scopus 로고    scopus 로고
    • Analytical model for analyzing construction claims and opportunistic bidding
    • doi:10.1061/(ASCE)0733-9364(2004)130:1(94)
    • Ho, S. P.; Liu, L. Y. 2004. Analytical model for analyzing construction claims and opportunistic bidding, Journal of Construction Engineering and Management ASCE 130(1): 94-104. doi:10.1061/(ASCE)0733-9364(2004)130:1(94)
    • (2004) Journal of Construction Engineering and Management ASCE , vol.130 , Issue.1 , pp. 94-104
    • Ho, S.P.1    Liu, L.Y.2
  • 10
    • 34247118646 scopus 로고    scopus 로고
    • On-line multi-criterion risk assessment model for construction joint ventures in China
    • doi:10.1016/j. autcon.2007.01.001
    • Hsueh, S. L.; Perng, Y. H.; Yan, M. R.; Lee, J. R. 2007. On-line multi-criterion risk assessment model for construction joint ventures in China, Automation in Construction 16(5): 607-619. doi:10.1016/j. autcon.2007.01.001
    • (2007) Automation in Construction , vol.16 , Issue.5 , pp. 607-619
    • Hsueh, S.L.1    Perng, Y.H.2    Yan, M.R.3    Lee, J.R.4
  • 11
    • 0038522697 scopus 로고    scopus 로고
    • Profit allocation of independent power producers based on cooperative Game theory
    • doi:10.1016/ S0142-0615(02)00180-1
    • Jia, N. X.; Yokoyama, R. 2003. Profit allocation of independent power producers based on cooperative Game theory, International Journal of Electrical Power and Energy Systems 25(8): 633-641. doi:10.1016/ S0142-0615(02)00180-1
    • (2003) International Journal of Electrical Power and Energy Systems , vol.25 , Issue.8 , pp. 633-641
    • Jia, N.X.1    Yokoyama, R.2
  • 12
    • 0037367928 scopus 로고    scopus 로고
    • Is structural change the primary solution to the problems of construction?
    • doi:10.1080/09613210301999
    • Koskela, L. 2003. Is structural change the primary solution to the problems of construction?, Building Research and Information 31(2): 85-96. doi:10.1080/09613210301999
    • (2003) Building Research and Information , vol.31 , Issue.2 , pp. 85-96
    • Koskela, L.1
  • 13
    • 0004171021 scopus 로고
    • Oxford University Press. doi:10.1093/0198283814.001.0001
    • Kreps, D. M. 1990. Game Theory and Economic Modeling. Oxford University Press. doi:10.1093/0198283814.001.0001
    • (1990) Game Theory and Economic Modeling
    • Kreps, D.M.1
  • 14
    • 0035157687 scopus 로고    scopus 로고
    • Performance measurement in construction logistics
    • doi:10.1016/S0925-5273(00)00034-7
    • Wegelius-Lehtonen, T. 2001. Performance measurement in construction logistics, Int. J. Production Economics 69: 107-116. doi:10.1016/S0925-5273(00)00034-7
    • (2001) Int. J. Production Economics , vol.69 , pp. 107-116
    • Wegelius-Lehtonen, T.1
  • 15
    • 34248586649 scopus 로고    scopus 로고
    • Contractor's opportunistic bidding behavior and equilibrium price level in the construction market
    • doi:10.1061/(ASCE)0733-9364(2007)133:6(409)
    • Lo, W.; Lin, C. L.; Yan, M. R. 2007. Contractor's opportunistic bidding behavior and equilibrium price level in the construction market, Journal of Construction Engineering and Management ASCE 133(6): 409-416. doi:10.1061/(ASCE)0733-9364(2007)133:6(409)
    • (2007) Journal of Construction Engineering and Management ASCE , vol.133 , Issue.6 , pp. 409-416
    • Lo, W.1    Lin, C.L.2    Yan, M.R.3
  • 16
    • 80054917822 scopus 로고    scopus 로고
    • Evaluating qualification-based selection system: A simulation approach
    • doi:10.1061/(ASCE)CO.1943-7862.0000013
    • Lo, W.; Yan, M. R. 2009. Evaluating qualification-based selection system: a simulation approach, Journal of Construction Engineering and Management ASCE 135(6): 458-465. doi:10.1061/(ASCE)CO.1943-7862.0000013
    • (2009) Journal of Construction Engineering and Management ASCE , vol.135 , Issue.6 , pp. 458-465
    • Lo, W.1    Yan, M.R.2
  • 17
    • 0043263143 scopus 로고    scopus 로고
    • Lean supply: The design and cost reduction dimensions
    • doi:10.1016/S0969-7012(01)00004-1
    • McIvor, R. 2001. Lean supply: the design and cost reduction dimensions, European Journal of Purchasing and Supply Management 7(4): 227-242. doi:10.1016/S0969-7012(01)00004-1
    • (2001) European Journal of Purchasing and Supply Management , vol.7 , Issue.4 , pp. 227-242
    • McIvor, R.1
  • 18
    • 33847325783 scopus 로고    scopus 로고
    • A game theory approach for the allocation of risks in transport public private partnerships
    • doi:10.1016/j.ijproman.2006.06.003
    • Medda, F. 2007. A game theory approach for the allocation of risks in transport public private partnerships, International Journal of Project Management 25: 213-218. doi:10.1016/j.ijproman.2006.06.003
    • (2007) International Journal of Project Management , vol.25 , pp. 213-218
    • Medda, F.1
  • 19
    • 0442293795 scopus 로고    scopus 로고
    • Integrating project activities: The theory and practice of managing the supply chain through clusters
    • doi:10.1080/014461901452067
    • Nicolini, D.; Holti, R.; Smalley, M. 2001. Integrating project activities: the theory and practice of managing the supply chain through clusters, Construction Management and Economics 19(1): 37-47. doi:10.1080/014461901452067
    • (2001) Construction Management and Economics , vol.19 , Issue.1 , pp. 37-47
    • Nicolini, D.1    Holti, R.2    Smalley, M.3
  • 20
    • 0004260006 scopus 로고
    • The Third Edition, Academic Press, New York
    • Owen, G. 1995. Game Theory. The Third Edition, Academic Press, New York.
    • (1995) Game Theory
    • Owen, G.1
  • 21
    • 4944253556 scopus 로고    scopus 로고
    • Potential benefits for collaborating formwork subcontractors based on co-operative game theory
    • doi:10.1016/j.buildenv.2004.07.007
    • Perng, Y. H.; Chen, S. J.; Lu, H. J. 2005. Potential benefits for collaborating formwork subcontractors based on co-operative game theory, Building and Environment 40: 239-244. doi:10.1016/j.buildenv.2004.07.007
    • (2005) Building and Environment , vol.40 , pp. 239-244
    • Perng, Y.H.1    Chen, S.J.2    Lu, H.J.3
  • 22
    • 0034370020 scopus 로고    scopus 로고
    • Reducing construction cost European best practice supply chain implications
    • doi:10.1016/S0969-7012(00)00011-3
    • Proverbs, D. G.; Holt, G. D. 2000. Reducing construction cost European best practice supply chain implications, European Journal of Purchasing and Supply Management 6(3-4): 149-158. doi:10.1016/S0969-7012(00)00011-3
    • (2000) European Journal of Purchasing and Supply Management , vol.6 , Issue.3-4 , pp. 149-158
    • Proverbs, D.G.1    Holt, G.D.2
  • 25
    • 34247222582 scopus 로고    scopus 로고
    • Using bargaining game theory for negotiating concession period for BOT type contract
    • doi:10.1061/(ASCE)0733-9364(2007)133:5(385)
    • Shen, L. Y.; Bao, H. J.; Wu, Y. Z.; Lu, W. S. 2007. Using bargaining game theory for negotiating concession period for BOT type contract, Journal of Construction Engineering and Management ASCE 133 (5): 385-392. doi:10.1061/(ASCE)0733-9364(2007)133:5(385)
    • (2007) Journal of Construction Engineering and Management ASCE , vol.133 , Issue.5 , pp. 385-392
    • Shen, L.Y.1    Bao, H.J.2    Wu, Y.Z.3    Lu, W.S.4
  • 27
    • 79961136876 scopus 로고    scopus 로고
    • A fuzzy logic enhanced bargaining model for business pricing decision support in joint venture projects
    • doi:10.3846/16111699.2011.573281
    • Yan, M. R. 2011. A fuzzy logic enhanced bargaining model for business pricing decision support in joint venture projects, Journal of Business Economics and Management 12(2): 234-247. doi:10.3846/16111699.2011.573281
    • (2011) Journal of Business Economics and Management , vol.12 , Issue.2 , pp. 234-247
    • Yan, M.R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.