메뉴 건너뛰기




Volumn 3, Issue , 2011, Pages 1906-1915

Post simulation visualization for effective scheduling of modular building construction

Author keywords

[No Author keywords available]

Indexed keywords

BASE MODELS; COMPLEX CONSTRUCTION; CONSTRUCTION ACTIVITIES; CONSTRUCTION METHOD; CONSTRUCTION PROCESS; CONSTRUCTION PROJECTS; EFFECTIVE TOOL; INTEGRATED SIMULATIONS; MODULAR BUILDINGS; NEW YORK; ONSITE INSTALLATION; PROJECT ENGINEERS; RETURN ON INVESTMENTS; STRUCTURAL STEELS; TRANSPORTATION EQUIPMENTS;

EID: 84855786565     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (3)

References (24)
  • 2
    • 4243345237 scopus 로고    scopus 로고
    • Ph.D. thesis, Department of Building Civil and Environmental Engineering, Concordia University, Montreal, Canada
    • Al-Hussein, Mohamed. 1999. An integrated system for crane selection and utilization. Ph.D. thesis, Department of Building Civil and Environmental Engineering, Concordia University, Montreal, Canada
    • (1999) An Integrated System for Crane Selection and Utilization
    • Al-Hussein, M.1
  • 4
    • 84993085455 scopus 로고    scopus 로고
    • An algorithm for mobile crane selection and location on construction sites
    • Al-Hussein, Mohamed; Alkass, Sabah; Moselhi, Osama. 2001. An algorithm for mobile crane selection and location on construction sites, Construction Innovation, 1: 91-105.
    • (2001) Construction Innovation , vol.1 , pp. 91-105
    • Al-Hussein, M.1    Alkass, S.2    Moselhi, O.3
  • 6
    • 33746350454 scopus 로고    scopus 로고
    • Integrating 3D visualization and simulation for tower crane operations on construction sites
    • Al-Hussein, Mohamed; Niaz, Muhammad Athar; Yu, Haitao; Kim, Hyoungkwan. 2006. Integrating 3D visualization and simulation for tower crane operations on construction sites. Automation in Construction, 15: 554-562.
    • (2006) Automation in Construction , vol.15 , pp. 554-562
    • Al-Hussein, M.1    Niaz, M.A.2    Yu, H.3    Kim, H.4
  • 8
    • 0033315084 scopus 로고    scopus 로고
    • Simphony: An environment for building special purpose construction simulation tools
    • Hajjar, Dany; AbouRizk, Simaan M. 1999. Simphony: an environment for building special purpose construction simulation tools. Winter Simulation Conference. Phoenix, AZ, USA, 2: 998-1006.
    • (1999) Winter Simulation Conference. Phoenix, AZ, USA , vol.2 , pp. 998-1006
    • Hajjar, D.1    AbouRizk, S.M.2
  • 12
    • 84893577175 scopus 로고    scopus 로고
    • Advanced simulation of tower crane operation utilizing system dynamics modeling and Lean principles
    • Hasan, Shafiul; Al-Hussein, Mohamed. 2010. Advanced simulation of tower crane operation utilizing system dynamics modeling and Lean principles, Winter Simulation Conference, Baltimore, MD, USA, 3262-3271.
    • (2010) Winter Simulation Conference, Baltimore, MD, USA , pp. 3262-3271
    • Hasan, S.1    Al-Hussein, M.2
  • 14
    • 0028137930 scopus 로고
    • Visual Construction Operation Simulation: The DISCO Approach
    • Huang, Rong-Yau; Halpin, Daniel W. 1994. Visual Construction Operation Simulation: The DISCO Approach, Microcomputers in Civil Engineering, 9: 175-184.
    • (1994) Microcomputers in Civil Engineering , vol.9 , pp. 175-184
    • Huang, R.-Y.1    Halpin, D.W.2
  • 15
    • 34147115212 scopus 로고    scopus 로고
    • A virtual prototyping system for simulating construction processes
    • Huang, Ting; Kong, C.W.; Guo, H.L.; Baldwin, Andrew; Li, Heng. 2007. A virtual prototyping system for simulating construction processes, Automation in Construction, 16: 576-585.
    • (2007) Automation in Construction , vol.16 , pp. 576-585
    • Huang, T.1    Kong, C.W.2    Guo, H.L.3    Baldwin, A.4    Li, H.5
  • 21
    • 34247622367 scopus 로고    scopus 로고
    • Priority rating logic simulation model for tower crane operations management
    • Niaz, Muhammed A.; AbouRizk, Simaan M.; Al-Hussein, Mohamed; Mohamed, Yasser. 2006. Priority rating logic simulation model for tower crane operations management, Journal of Construction Research, 7: 133-147.
    • (2006) Journal of Construction Research , vol.7 , pp. 133-147
    • Niaz, M.A.1    AbouRizk, S.M.2    Al-Hussein, M.3    Mohamed, Y.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.