메뉴 건너뛰기




Volumn 39, Issue 9, 2012, Pages 2001-2015

Inventory models for imperfect production and inspection processes with various inspection options under one-time and continuous improvement investment

Author keywords

Continuous improvement; Inspection option; Inventory; Production and inspection reliability; Reverse logistics

Indexed keywords

ANALYTICAL MODEL; CONTINUOUS IMPROVEMENTS; FUTURE RESEARCH DIRECTIONS; IMPERFECT PRODUCTION; INSPECTION PROCESS; INSPECTION RELIABILITY; INVENTORY; INVENTORY MODELS; MANAGERIAL IMPLICATIONS; OPTIMAL INSPECTION; PRODUCTION AND INVENTORY; REVERSE LOGISTICS; SIMULATION ANALYSIS;

EID: 84855553612     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2011.09.015     Document Type: Article
Times cited : (27)

References (48)
  • 4
    • 1642269680 scopus 로고    scopus 로고
    • Product modularity and the design of closed-loop supply chains
    • H. Krikke, I. le Blanc, and S. van de Velde Product modularity and the design of closed-loop supply chains California Management Review 46 2 2004 23 39 (Pubitemid 38396744)
    • (2004) California Management Review , vol.46 , Issue.2 , pp. 23-39
    • Krikke, H.1    Le Blanc, I.2    Van De Velde, S.3
  • 7
    • 0001198301 scopus 로고
    • Lot sizing with random yields: A review
    • C.A. Yano, and H.L. Lee Lot sizing with random yields: a review Operations Research 43 2 1995 311 334
    • (1995) Operations Research , vol.43 , Issue.2 , pp. 311-334
    • Yano, C.A.1    Lee, H.L.2
  • 9
    • 0022613610 scopus 로고
    • Optimal lot sizing, process quality improvement and setup cost reduction
    • E.L. Porteus Optimal lot sizing, process quality improvement and setup cost reduction Operations Research 34 1 1986 137 144
    • (1986) Operations Research , vol.34 , Issue.1 , pp. 137-144
    • Porteus, E.L.1
  • 10
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • M.J. Rosenblatt, and H.L. Lee Economic production cycles with imperfect production processes IIE Transactions 18 1 1986 48 55
    • (1986) IIE Transactions , vol.18 , Issue.1 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 11
    • 0023412314 scopus 로고
    • Simultaneous determination of production cycle and inspection schedules in a production system
    • H.L. Lee, and M.J. Rosenblatt Simultaneous determination of production cycle and inspection schedules in a production system Management Science 33 9 1987 1125 1136
    • (1987) Management Science , vol.33 , Issue.9 , pp. 1125-1136
    • Lee, H.L.1    Rosenblatt, M.J.2
  • 12
    • 0024914068 scopus 로고
    • A production and maintenance planning model with restoration cost dependent on detection delay
    • H.L. Lee, and M.J. Rosenblatt A production and maintenance planning model with restoration cost dependent on detection delay IIE Transactions 21 4 1989 368 375
    • (1989) IIE Transactions , vol.21 , Issue.4 , pp. 368-375
    • Lee, H.L.1    Rosenblatt, M.J.2
  • 13
    • 0026220964 scopus 로고
    • Joint determination of production cycle and inspection intervals in a deteriorating production
    • J.S. Lee, and K.S. Park Joint determination of production cycle and inspection intervals in a deteriorating production Journal of the Operational Research Society 42 9 1991 775 783
    • (1991) Journal of the Operational Research Society , vol.42 , Issue.9 , pp. 775-783
    • Lee, J.S.1    Park, K.S.2
  • 14
    • 0028396227 scopus 로고
    • The effects of inspection errors to the imperfect EMQ model
    • M. Liou, S. Tseng, and T. Lin The effects of inspection errors to the imperfect EMQ model IIE Transactions 26 2 1994 42 51
    • (1994) IIE Transactions , vol.26 , Issue.2 , pp. 42-51
    • Liou, M.1    Tseng, S.2    Lin, T.3
  • 15
    • 0028548762 scopus 로고
    • Joint determination of production quantity, inspection schedule and control chart design
    • M.A. Rahim Joint determination of production quantity, inspection schedule and control chart design IIE Transactions 26 6 1994 2 11
    • (1994) IIE Transactions , vol.26 , Issue.6 , pp. 2-11
    • Rahim, M.A.1
  • 16
    • 0032274904 scopus 로고    scopus 로고
    • Optimal inspection sublots for deteriorating batch production
    • R.G. Vickson Optimal inspection sublots for deteriorating batch production IIE Transactions 30 11 1998 1019 1024
    • (1998) IIE Transactions , vol.30 , Issue.11 , pp. 1019-1024
    • Vickson, R.G.1
  • 17
    • 0035340520 scopus 로고    scopus 로고
    • Optimal production run length and inspection schedules in a deteriorating production process
    • DOI 10.1023/A:1011057331192
    • C.H. Kim, Y. Hong, and S.Y. Chang Optimal production run length and inspection schedules in a deteriorating production process IIE Transactions 33 5 2001 421 426 (Pubitemid 32394204)
    • (2001) IIE Transactions (Institute of Industrial Engineers) , vol.33 , Issue.5 , pp. 421-426
    • Kim, C.H.1    Hong, Y.2    Chang, S.Y.3
  • 18
    • 0035577718 scopus 로고    scopus 로고
    • Joint determination of production quantity, inspection schedule, and quality control for an imperfect process with deteriorating products
    • M.A. Rahim, and M. Ben-Daya Joint determination of production quantity, inspection schedule, and quality control for an imperfect process with deteriorating products Journal of the Operational Research Society 52 12 2001 1370 1378 (Pubitemid 33128273)
    • (2001) Journal of the Operational Research Society , vol.52 , Issue.12 , pp. 1370-1378
    • Rahim, M.A.1    Ben-Daya, M.2
  • 19
    • 0035452379 scopus 로고    scopus 로고
    • Simultaneous determination of the optimal production-inventory and product inspection policies for a deteriorating production system
    • DOI 10.1016/S0305-0548(00)00030-7, PII S0305054800000307
    • C. Wang, and S. Sheu Simultaneous determination of the optimal productioninventory and product inspection policies for a deteriorating production system Computers & Operations Research 28 11 2001 1093 1110 (Pubitemid 32675999)
    • (2001) Computers and Operations Research , vol.28 , Issue.11 , pp. 1093-1110
    • Wang, C.-H.1    Sheu, S.-H.2
  • 20
    • 0037211215 scopus 로고    scopus 로고
    • Determining the optimal production-maintenance policy with inspection errors: Using a Markov chain
    • DOI 10.1016/S0305-0548(01)00073-9, PII S0305054801000739
    • C. Wang, and S. Sheu Determining the optimal productionmaintenance policy with inspection errors: using a Markov chain Computers & Operations Research 30 1 2003 1 17 (Pubitemid 35404858)
    • (2003) Computers and Operations Research , vol.30 , Issue.1 , pp. 1-17
    • Wang, C.-H.1    Sheu, S.H.2
  • 21
    • 0038221261 scopus 로고    scopus 로고
    • Optimal lot sizing for products sold under free-repair warranty
    • C. Wang, and S. Sheu Optimal lot sizing for products sold under free-repair warranty European Journal of Operational Research 149 1 2003 131 141
    • (2003) European Journal of Operational Research , vol.149 , Issue.1 , pp. 131-141
    • Wang, C.1    Sheu, S.2
  • 22
    • 0036778937 scopus 로고    scopus 로고
    • Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process
    • DOI 10.1016/S0305-0548(01)00051-X, PII S030505480100051X
    • L. Ouyang, C. Chen, and H. Chang Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process Computers & Operations Research 29 12 2002 1701 1717 (Pubitemid 34589746)
    • (2002) Computers and Operations Research , vol.29 , Issue.12 , pp. 1701-1717
    • Ouyang, L.-Y.1    Chen, C.-K.2    Chang, H.-C.3
  • 23
    • 0037448815 scopus 로고    scopus 로고
    • The finite multiple lot sizing problem with interrupted geometric yield and holding costs
    • DOI 10.1016/S0377-2217(02)00217-5, PII S0377221702002175
    • S. Guu, and A.X. Zhang The finite multiple lot sizing problem with interrupted geometric yield and holding costs European Journal of Operational Research 145 3 2003 635 644 (Pubitemid 35411811)
    • (2003) European Journal of Operational Research , vol.145 , Issue.3 , pp. 635-644
    • Guu, S.-M.1    Zhang, A.X.2
  • 24
    • 33746218421 scopus 로고    scopus 로고
    • Optimal lot size and inspection policy for products sold with warranty
    • DOI 10.1016/j.ejor.2005.02.049, PII S0377221705002584
    • R.H. Yeh, and T. Chen Optimal lot size and inspection policy for products with warranty European Journal of Operational Research 174 2 2006 766 776 (Pubitemid 44093896)
    • (2006) European Journal of Operational Research , vol.174 , Issue.2 , pp. 766-776
    • Yeh, R.H.1    Chen, T.-H.2
  • 28
    • 0024622287 scopus 로고
    • An economic production quantity model with flexibility and reliability considerations
    • T.C.E. Cheng An economic production quantity model with flexibility and reliability considerations European Journal of Operational Research 39 2 1989 174 179
    • (1989) European Journal of Operational Research , vol.39 , Issue.2 , pp. 174-179
    • Cheng, T.C.E.1
  • 29
    • 0026116409 scopus 로고
    • Economic order quantity model with demand-dependent unit production cost and imperfect production processes
    • T.C.E. Cheng An economic order quantity model with demand-dependent unit production cost and imperfect production process IIE Transactions 23 1 1991 23 28 (Pubitemid 21651734)
    • (1991) IIE Transactions (Institute of Industrial Engineers) , vol.23 , Issue.1 , pp. 23-28
    • Cheng, T.C.E.1
  • 30
    • 0026205897 scopus 로고
    • EPQ with process capability and quality assurance considerations
    • T.C.E. Cheng EPQ with process capability and quality assurance considerations Journal of the Operational Research Society 42 8 1991 713 720 (Pubitemid 21724741)
    • (1991) Journal of the Operational Research Society , vol.42 , Issue.8 , pp. 713-720
    • Cheng, T.C.E.1
  • 31
    • 0029391922 scopus 로고
    • Single-machine lot-sizing with uniform yields and rigid demands: Robustness of the optimal solution
    • S. Anily Single-machine lot-sizing with uniform yields and rigid demands: robustness of the optimal solution IIE Transactions 27 5 1995 625 633
    • (1995) IIE Transactions , vol.27 , Issue.5 , pp. 625-633
    • Anily, S.1
  • 32
    • 0029290859 scopus 로고
    • Optimal operating policy for a bottleneck with random rework
    • K.C. So, and C.S. Tang Optimal operating policy for a bottleneck with random rework Management Science 41 4 1995 620 636
    • (1995) Management Science , vol.41 , Issue.4 , pp. 620-636
    • So, K.C.1    Tang, C.S.2
  • 33
    • 0009423748 scopus 로고
    • Optimal batch sizing and repair strategies for operations with repairable jobs
    • K.C. So, and C.S. Tang Optimal batch sizing and repair strategies for operations with repairable jobs Management Science 41 5 1995 894 908
    • (1995) Management Science , vol.41 , Issue.5 , pp. 894-908
    • So, K.C.1    Tang, C.S.2
  • 35
    • 0034176746 scopus 로고    scopus 로고
    • Lot sizing with random yields and tardiness costs
    • DOI 10.1016/S0305-0548(99)00062-3, PII S0305054899000623
    • S. Agnihothri, J.S. Lee, and J. Kim Lot sizing with random yields and tardiness costs Computers & Operations Research 27 5 2000 437 459 (Pubitemid 30174869)
    • (2000) Computers and Operations Research , vol.27 , Issue.5 , pp. 437-459
    • Agnihothri, S.1    Lee, J.S.2    Kim, J.3
  • 36
    • 0033874992 scopus 로고    scopus 로고
    • Economic production quantity model for items with imperfect quality
    • DOI 10.1016/S0925-5273(99)00044-4
    • M.K. Salameh, and M.Y. Jaber Economic production quantity model for items with imperfect quality International Journal of Production Economics 64 13 2000 59 64 (Pubitemid 30557643)
    • (2000) International Journal of Production Economics , vol.64 , Issue.1 , pp. 59-64
    • Salameh, M.K.1    Jaber, M.Y.2
  • 37
    • 0035452583 scopus 로고    scopus 로고
    • Inventory and investment in quality improvement under return on investment maximization
    • DOI 10.1016/S0305-0548(00)00022-8, PII S0305054800000228
    • T. Otake, and K.J. Min Inventory and investment in quality improvement under return on investment maximization Computers & Operations Research 28 10 2001 997 1012 (Pubitemid 32626418)
    • (2001) Computers and Operations Research , vol.28 , Issue.10 , pp. 997-1012
    • Otake, T.1    Jo Min, K.2
  • 38
    • 0036833065 scopus 로고    scopus 로고
    • Quality improvement and setup reduction in the joint economic lot size model
    • DOI 10.1016/S0377-2217(01)00308-3, PII S0377221701003083
    • J.F. Affisco, M.J. Paknejad, and F. Nasri Quality improvement and setup reduction in the joint economic lot size model European Journal of Operational Research 142 3 2002 497 508 (Pubitemid 34863167)
    • (2002) European Journal of Operational Research , vol.142 , Issue.3 , pp. 497-508
    • Affisco, J.F.1    Paknejad, M.J.2    Nasri, F.3
  • 39
    • 0037121168 scopus 로고    scopus 로고
    • A production planning model for an unreliable production facility: Case of finite horizon and single demand
    • M. Elhafsi A production planning model for an unreliable production facility: Case of finite horizon and single demand European Journal of Operational Research 143 1 2002 94 114
    • (2002) European Journal of Operational Research , vol.143 , Issue.1 , pp. 94-114
    • Elhafsi, M.1
  • 41
    • 12344289300 scopus 로고    scopus 로고
    • A two-bottleneck system with binomial yields and rigid demand
    • DOI 10.1016/j.ejor.2003.06.044, PII S0377221704000517
    • A. Grosfeld-Nir A two-bottleneck system with binomial yields and rigid demand European Journal of Operational Research 165 1 2005 231 250 (Pubitemid 40135604)
    • (2005) European Journal of Operational Research , vol.165 , Issue.1 , pp. 231-250
    • Grosfeld-Nir, A.1
  • 42
    • 33744737873 scopus 로고    scopus 로고
    • Economic development of specifications for 100% inspection based on asymmetric quality loss functions
    • DOI 10.1080/07408170600692226, PII K8157844631276
    • Q. Feng, and K.C. Kapur Economic development of specifications for 100% inspection based on asymmetric quality loss functions IIE Transactions 38 8 2006 659 669 (Pubitemid 43820944)
    • (2006) IIE Transactions (Institute of Industrial Engineers) , vol.38 , Issue.8 , pp. 659-669
    • Feng, Q.1    Kapur, K.C.2
  • 43
    • 33646519025 scopus 로고    scopus 로고
    • Lot-sizing two-echelon assembly systems with random yields and rigid demand
    • A. Grosfeld-Nir, S. Anily, and T. Ben-Zvi Lot-sizing two-echelon assembly systems with random yields and rigid demand European Journal of Operational Research 173 2 2006 600 616
    • (2006) European Journal of Operational Research , vol.173 , Issue.2 , pp. 600-616
    • Grosfeld-Nir, A.1    Anily, S.2    Ben-Zvi, T.3
  • 44
    • 33846655633 scopus 로고    scopus 로고
    • Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
    • DOI 10.1016/j.ejor.2006.05.005, PII S0377221706003353
    • S.W. Chiu, S. Wang, and Y.P. Chiu Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns European Journal of Operational Research 180 2 2007 664 676 (Pubitemid 46199072)
    • (2007) European Journal of Operational Research , vol.180 , Issue.2 , pp. 664-676
    • Chiu, S.W.1    Wang, S.-L.2    Chiu, Y.-S.P.3
  • 45
    • 33748973559 scopus 로고    scopus 로고
    • A generalized geometric-programming solution to An economic production quantity model with flexibility and reliability considerations
    • K.F. Leung A generalized geometric-programming solution to An economic production quantity model with flexibility and reliability considerations European Journal of Operational Research 176 1 2007 240 251
    • (2007) European Journal of Operational Research , vol.176 , Issue.1 , pp. 240-251
    • Leung, K.F.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.