메뉴 건너뛰기




Volumn 21, Issue 1, 2012, Pages 194-203

Design of flexible multi-stage processes

Author keywords

flexible capacity; flexible resource; multi stage process; process design; process flexibility

Indexed keywords


EID: 84855531069     PISSN: 10591478     EISSN: 19375956     Source Type: Journal    
DOI: 10.1111/j.1937-5956.2011.01240.x     Document Type: Article
Times cited : (7)

References (21)
  • 1
    • 84855531852 scopus 로고    scopus 로고
    • News of January 10, 2001 (accessed date December 2, 2010)
    • Automotive Intelligence News. 2001. News of January 10, 2001. Available at http://www.autointell.com/News-2001/January-2001/January-2001-2/January-10- 01-p5.htm (accessed date December 2, 2010).
    • (2001) Automotive Intelligence News
  • 3
    • 84855545044 scopus 로고    scopus 로고
    • Shifting gears: Chrysler gains edge by giving new flexibility to its factories; Some can build one vehicle, then switch to another, a skill Japanese pioneered
    • April 11, p. A.1.
    • Boudette, N. E., 2006. Shifting gears: Chrysler gains edge by giving new flexibility to its factories; some can build one vehicle, then switch to another, a skill Japanese pioneered. Wall Street Journal, April 11, p. A.1.
    • (2006) Wall Street Journal
    • Boudette, N.E.1
  • 4
    • 0030251034 scopus 로고    scopus 로고
    • Manufacturing flexibility at the plant level
    • DOI 10.1016/0305-0483(96)82815-5
    • Boyer, K., G. K. Leong,. 1996. Manufacturing flexibility at the plant level. Omega Int. J. Manage. Sci. 24 (5): 495-510. (Pubitemid 126166530)
    • (1996) Omega , vol.24 , Issue.5 , pp. 495-510
    • Boyer, K.K.1    Leong, G.K.2
  • 5
    • 0001823807 scopus 로고
    • Analysis of flexibility with rationing for a mix of manufacturing facilities
    • Chakravarty, A. K., 1989. Analysis of flexibility with rationing for a mix of manufacturing facilities. Int. J. Flex. Manuf. Syst. 2 (1): 43-62.
    • (1989) Int. J. Flex. Manuf. Syst. , vol.2 , Issue.1 , pp. 43-62
    • Chakravarty, A.K.1
  • 6
    • 5644254746 scopus 로고    scopus 로고
    • Real-time revision of order quantities
    • Chakravarty, A. K., N. Balakrishnan,. 2004. Real-time revision of order quantities. Prod. Oper. Manag. 13 (2): 171-185.
    • (2004) Prod. Oper. Manag. , vol.13 , Issue.2 , pp. 171-185
    • Chakravarty, A.K.1    Balakrishnan, N.2
  • 7
    • 0032094829 scopus 로고    scopus 로고
    • Manufacturing flexibility
    • Int. J. Prod. Res.
    • De Toni, A., A. Tonchia,. 1998. Manufacturing flexibility: A literature review. Int. J. Prod. Res. 36 (6): 1587-1617.
    • (1998) A Literature Review , vol.36 , Issue.6 , pp. 1587-1617
    • De Toni, A.1    Tonchia, A.2
  • 8
    • 0001599465 scopus 로고
    • Optimal investment in product-flexible manufacturing capacity
    • Fine, C. H., R. M. Freund,. 1990. Optimal investment in product-flexible manufacturing capacity. Manage. Sci. 36 (4): 449-466.
    • (1990) Manage. Sci. , vol.36 , Issue.4 , pp. 449-466
    • Fine, C.H.1    Freund, R.M.2
  • 9
    • 3843064397 scopus 로고
    • Flexibility and the choice of manufacturing facilities under short product life cycles
    • Gaimon, C., V. Singhal,. 1992. Flexibility and the choice of manufacturing facilities under short product life cycles. Eur. J. Oper. Res. 60 (2): 211-223.
    • (1992) Eur. J. Oper. Res. , vol.60 , Issue.2 , pp. 211-223
    • Gaimon, C.1    Singhal, V.2
  • 10
    • 0242453757 scopus 로고    scopus 로고
    • A numerical analysis of capacitated postponement
    • Graman, G. A., M. J. Magazine,. 2002. A numerical analysis of capacitated postponement. Prod. Oper. Manag. 11 (3): 340-357.
    • (2002) Prod. Oper. Manag. , vol.11 , Issue.3 , pp. 340-357
    • Graman, G.A.1    Magazine, M.J.2
  • 11
    • 0042266799 scopus 로고    scopus 로고
    • Process flexibility in supply chains
    • Graves, S. C., B. T. Tomlin,. 2003. Process flexibility in supply chains. Manage. Sci. 49 (7): 907-919.
    • (2003) Manage. Sci. , vol.49 , Issue.7 , pp. 907-919
    • Graves, S.C.1    Tomlin, B.T.2
  • 12
    • 0029290411 scopus 로고
    • Principles on the benefits of manufacturing process flexibility
    • Jordan, W. C., S. C. Graves,. 1995. Principles on the benefits of manufacturing process flexibility. Manage. Sci. 41 (4): 577-594.
    • (1995) Manage. Sci. , vol.41 , Issue.4 , pp. 577-594
    • Jordan, W.C.1    Graves, S.C.2
  • 13
    • 84986138192 scopus 로고    scopus 로고
    • Where are the hot cars?
    • June 24
    • Kerwin, K., 2002. Where are the hot cars? Business Week, June 24, pp. 66-68.
    • (2002) Business Week , pp. 66-68
    • Kerwin, K.1
  • 14
    • 0003103020 scopus 로고
    • Technology choice with stochastic demands and dynamic capacity allocation
    • J. Oper. Manage.
    • Li, S., D. Tirupati,. 1995. Technology choice with stochastic demands and dynamic capacity allocation: A two-product analysis. J. Oper. Manage. 12 (3-4): 239-258.
    • (1995) A Two-product Analysis , vol.12 , Issue.34 , pp. 239-258
    • Li, S.1    Tirupati, D.2
  • 15
    • 84855531851 scopus 로고    scopus 로고
    • Ford plans tall sedan for Torrence
    • March 28 (access date April 5, 2011)
    • Mateja, J., 2002. Ford plans tall sedan for Torrence. Chicago Tribune, March 28. Available at http://articles.chicagotribune.com/2002-03-28/business/ 0203280032-1-chief-executive-bill-fordford-five-hundred-ford-chairman (access date April 5, 2011).
    • (2002) Chicago Tribune
    • Mateja, J.1
  • 16
    • 33847280829 scopus 로고    scopus 로고
    • Ford's F-150: Have it your way
    • March
    • McMurray, S., 2004. Ford's F-150: Have it your way. Business 2.0, March, pp. 53-55.
    • (2004) Business 2.0 , pp. 53-55
    • McMurray, S.1
  • 17
    • 84863136124 scopus 로고
    • Economies of scope
    • Panzar, J. C., R. D. Willig,. 1981. Economies of scope. Am. Econ. Rev. 71 (2): 268-272.
    • (1981) Am. Econ. Rev. , vol.71 , Issue.2 , pp. 268-272
    • Panzar, J.C.1    Willig, R.D.2
  • 18
    • 0032631424 scopus 로고    scopus 로고
    • Strategic configuration of flexible assembly systems
    • IIE Trans.
    • Peters, B. A., L. F. McGinnis,. 1999. Strategic configuration of flexible assembly systems: A single period approximation. IIE Trans. 31 (4): 379-390.
    • (1999) A Single Period Approximation , vol.31 , Issue.4 , pp. 379-390
    • Peters, B.A.1    McGinnis, L.F.2
  • 20
    • 84855558244 scopus 로고    scopus 로고
    • Ford: Europe has a better idea
    • April 22
    • Tierney, C., K. Kerwin,. 2002. Ford: Europe has a better idea. Business Week, April 22, pp. 84-85.
    • (2002) Business Week , pp. 84-85
    • Tierney, C.1    Kerwin, K.2
  • 21
    • 0032136536 scopus 로고    scopus 로고
    • Investment strategies for flexible resources
    • Van Mieghem, J. A., 1998. Investment strategies for flexible resources. Manage. Sci. 44 (8): 1071-1078. (Pubitemid 128569652)
    • (1998) Management Science , vol.44 , Issue.8 , pp. 1071-1078
    • Van Mieghem, J.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.