|
Volumn 110 PART II, Issue , 2004, Pages 130-144
|
Benefits of multi-building electric load aggregation: Actual and simulation case Studies
b c d a a |
Author keywords
[No Author keywords available]
|
Indexed keywords
ACTIVE LOAD CONTROL;
ELECTRIC DEREGULATION;
ELECTRIC UTILITY AGGREGATION;
MULTI-BUILDING AGGREGATION;
BUILDINGS;
COMPUTER SIMULATION;
CONTROL SYSTEMS;
ELECTRIC POWER GENERATION;
ENERGY MANAGEMENT;
MATHEMATICAL MODELS;
PROJECT MANAGEMENT;
REAL TIME SYSTEMS;
ELECTRIC LOADS;
|
EID: 8444232591
PISSN: 00012505
EISSN: None
Source Type: Conference Proceeding
DOI: None Document Type: Conference Paper |
Times cited : (9)
|
References (9)
|