Volumn 16, Issue 1, 2011, Pages 69-89

Selection of project managers in construction Firms using analytic hierarchy process (AHP) and fuzzy Topsis: A case study

Author keywords

AHP; Construction Firms; Criteria; Fuzzy TOPSIS; Project manager

Indexed keywords


EID: 84055192923     PISSN: 18236499     EISSN: 21804222     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (45)

References (29)
  • 1
    • 67649566423 scopus 로고    scopus 로고
    • Clean agent selection approached by Fuzzy TOPSIS Decision-Making method
    • Aiello, G., Enea, M., Galante, G. and Scalia, G.L. (2008). Clean agent selection approached by Fuzzy TOPSIS Decision-Making method. Fire Technology, 45(4): 405-418.
    • (2008) Fire Technology , vol.45 , Issue.4 , pp. 405-418
    • Aiello, G.1    Enea, M.2    Galante, G.3    Scalia, G.L.4
  • 3
    • 0002296389 scopus 로고    scopus 로고
    • Extensions of the TOPSIS for group decisionmaking under fuzzy environment
    • Chen, C.T. (2000). Extensions of the TOPSIS for group decisionmaking under fuzzy environment. Fuzzy Sets and Systems, 114(1): 1-9.
    • (2000) Fuzzy Sets and Systems , vol.114 , Issue.1 , pp. 1-9
    • Chen, C.T.1
  • 4
    • 0032592038 scopus 로고    scopus 로고
    • Evaluating weapon systems using ranking fuzzy numbers
    • Cheng, C.H. (1999). Evaluating weapon systems using ranking fuzzy numbers. Fuzzy Systems, 107(1): 25-35.
    • (1999) Fuzzy Systems , vol.107 , Issue.1 , pp. 25-35
    • Cheng, C.H.1
  • 5
    • 67849119766 scopus 로고    scopus 로고
    • An application of Fuzzy Delphi and Fuzzy AHP on evaluating wafer supplier in semiconductor industry
    • Cheng, J.H., Lee, C.M. and Tang. C.H. (2009). An application of Fuzzy Delphi and Fuzzy AHP on evaluating wafer supplier in semiconductor industry. WSEAS Transactions on Information Science and Applications, 5(6): 756-767.
    • (2009) WSEAS Transactions on Information Science and Applications , vol.5 , Issue.6 , pp. 756-767
    • Cheng, J.H.1    Lee, C.M.2    Tang, C.H.3
  • 6
    • 0030396519 scopus 로고    scopus 로고
    • A decision support system for project portfolio selection
    • Chu, P., Hsu, Y. and Fehling, M. (1996). A decision support system for project portfolio selection. Computer in Industry, 32(2): 141-149.
    • (1996) Computer in Industry , vol.32 , Issue.2 , pp. 141-149
    • Chu, P.1    Hsu, Y.2    Fehling, M.3
  • 7
    • 60549087883 scopus 로고    scopus 로고
    • Weapon selection using the AHP and TOPSIS methods under fuzzy environment
    • Dagdeviren, M., Yavuz, S. and Ki{dotless}li{dotless}nc, N. (2009). Weapon selection using the AHP and TOPSIS methods under fuzzy environment. Expert Systems with Applications, 36(4): 8143- 8151.
    • (2009) Expert Systems with Applications , vol.36 , Issue.4 , pp. 8143-8151
    • Dagdeviren, M.1    Yavuz, S.2    Kilinc, N.3
  • 8
    • 33745001751 scopus 로고    scopus 로고
    • Integrated project evaluation and selection using multiple-attribute decision-making technique
    • Dey, P.K. (2006). Integrated project evaluation and selection using multiple-attribute decision-making technique. International Journal of Production Economics, 103(1): 90-103.
    • (2006) International Journal of Production Economics , vol.103 , Issue.1 , pp. 90-103
    • Dey, P.K.1
  • 9
    • 0035196990 scopus 로고    scopus 로고
    • The skills and career path of an effective project manager
    • El-Saba, S. (2001). The skills and career path of an effective project manager. International Journal of Project Management, 19(1): 1-7.
    • (2001) International Journal of Project Management , vol.19 , Issue.1 , pp. 1-7
    • El-Saba, S.1
  • 10
    • 0027624502 scopus 로고
    • Skills required of effective project managers
    • Goodwin, R.S.C. (1995). Skills required of effective project managers. Journal of Management in Engineering, 9(3): 217-226.
    • (1995) Journal of Management in Engineering , vol.9 , Issue.3 , pp. 217-226
    • Goodwin, R.S.C.1
  • 12
    • 33751406789 scopus 로고    scopus 로고
    • Using a multi-criteria decision making approach to evaluate mobile phone alternatives
    • Isiklar, G. and Buyukozkan, G. (2006). Using a multi-criteria decision making approach to evaluate mobile phone alternatives. Computer Standards and Interfaces, 29(2): 265- 274.
    • (2006) Computer Standards and Interfaces , vol.29 , Issue.2 , pp. 265-274
    • Isiklar, G.1    Buyukozkan, G.2
  • 17
    • 30744448143 scopus 로고    scopus 로고
    • Environmental factors and work performance of project managers in the construction industry
    • Pheng, L.S. and Chuan, Q.T. (2006). Environmental factors and work performance of project managers in the construction industry. Journal of Project Management, 24(1): 24-37.
    • (2006) Journal of Project Management , vol.24 , Issue.1 , pp. 24-37
    • Pheng, L.S.1    Chuan, Q.T.2
  • 19
    • 0000544458 scopus 로고
    • Axiomatic foundations of the analytic hierarchy process
    • Saaty, T.L. (1986). Axiomatic foundations of the analytic hierarchy process. Management Science, 32(7): 841-855.
    • (1986) Management Science , vol.32 , Issue.7 , pp. 841-855
    • Saaty, T.L.1
  • 20
    • 0037448775 scopus 로고    scopus 로고
    • Decision-making with the AHP: Why is the principal eigenvector necessary
    • Saaty, T.L. (2003). Decision-making with the AHP: Why is the principal eigenvector necessary. European Journal of Operational Research, 145(1): 85-91.
    • (2003) European Journal of Operational Research , vol.145 , Issue.1 , pp. 85-91
    • Saaty, T.L.1
  • 21
    • 84055214306 scopus 로고    scopus 로고
    • Application of Fuzzy TOPSIS Technique for evaluation of project
    • Salehi, M. (2009). Application of Fuzzy TOPSIS Technique for evaluation of project. World Applied Sciences Journal, 6(6): 776-783.
    • (2009) World Applied Sciences Journal , vol.6 , Issue.6 , pp. 776-783
    • Salehi, M.1
  • 22
    • 0012646407 scopus 로고    scopus 로고
    • Data envelopment analysis: The evolution of the state-of-the-art 1978-1995
    • Seiford L.M. (1996). Data envelopment analysis: The evolution of the state-of-the-art 1978-1995. Journal of Production Analysis, 7(2/3): 99-137.
    • (1996) Journal of Production Analysis , vol.7 , Issue.2-3 , pp. 99-137
    • Seiford, L.M.1
  • 23
    • 33845907941 scopus 로고    scopus 로고
    • Linked analytic hierarchy process and social choice methods to support group decision-making in water management
    • Srdjevic, B. (2007). Linked analytic hierarchy process and social choice methods to support group decision-making in water management. Decision Support Systems, 42(4): 2261-2273.
    • (2007) Decision Support Systems , vol.42 , Issue.4 , pp. 2261-2273
    • Srdjevic, B.1
  • 24
    • 70649102118 scopus 로고    scopus 로고
    • Fuzzy AHP to determine the relative weights of evaluation criteria and Fuzzy TOPSIS to rank the alternatives
    • Torfi, F., Farahani, R.Z. and Rezapour, S. (2010). Fuzzy AHP to determine the relative weights of evaluation criteria and Fuzzy TOPSIS to rank the alternatives. Applied Soft Computing, 10(2): 520-528.
    • (2010) Applied Soft Computing , vol.10 , Issue.2 , pp. 520-528
    • Torfi, F.1    Farahani, R.Z.2    Rezapour, S.3
  • 25
    • 12444289555 scopus 로고    scopus 로고
    • Solving a multiresponse simulationoptimization problem with discrete variables using a multiple-attribute decision-making method
    • Yang, T. and Chou, P. (2005). Solving a multiresponse simulationoptimization problem with discrete variables using a multiple-attribute decision-making method. Mathematics and Computers in Simulation, 68(1): 9-21.
    • (2005) Mathematics and Computers in Simulation , vol.68 , Issue.1 , pp. 9-21
    • Yang, T.1    Chou, P.2
  • 26
    • 33750736678 scopus 로고    scopus 로고
    • Multiple-attribute decisionmaking methods for plant layout design problem
    • Yang, T. and Hung, C.C. (2007). Multiple-attribute decisionmaking methods for plant layout design problem. Robotics and Computer-integrated Manufacturing, 23(1): 126-137.
    • (2007) Robotics and Computer-integrated Manufacturing , vol.23 , Issue.1 , pp. 126-137
    • Yang, T.1    Hung, C.C.2
  • 27
    • 0037449044 scopus 로고    scopus 로고
    • A hierarchical AHP/DEA methodology for the facilities layout design problem
    • Yang, T. and Kou, C. (2003). A hierarchical AHP/DEA methodology for the facilities layout design problem. European Journal of Operational Research, 147(1): 128-36.
    • (2003) European Journal of Operational Research , vol.147 , Issue.1 , pp. 128-136
    • Yang, T.1    Kou, C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.