메뉴 건너뛰기




Volumn 218, Issue 1, 2012, Pages 152-162

Optimizing reliability and service parts logistics for a time-varying installed base

Author keywords

Life cycle cost analysis; Non stationary demand; Performance based logistics; Reliability; Repairable inventory

Indexed keywords

AFTER-SALES SERVICES; CAPITAL EQUIPMENTS; DESIGN FOR RELIABILITY; FLEET SIZES; INVENTORY CONTROL POLICIES; INVENTORY LEVELS; LIFE CYCLE COST ANALYSIS; NON-STATIONARY DEMAND; NONSTATIONARY; NUMERICAL EXAMPLE; OPERATION AND MAINTENANCE; OPERATIONAL AVAILABILITY; OPTIMIZATION MODELS; PERFORMANCE BASED; PERFORMANCE-BASED LOGISTICS; PERFORMANCE-DRIVEN; PLANNING HORIZONS; POISSON PROCESS; RELIABILITY DESIGN; REPAIRABLE INVENTORY; SEMICONDUCTOR EQUIPMENT INDUSTRY; SERVICE OPERATIONS; SERVICE PARTS LOGISTICS; TIME VARYING;

EID: 83955165294     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2011.10.026     Document Type: Article
Times cited : (79)

References (30)
  • 2
    • 0000838970 scopus 로고
    • On the computational complexity of reliability redundancy allocation in a series system
    • M.S. Chen On the computational complexity of reliability redundancy allocation in a series system Operations Research Letters 11 5 1992 309 315
    • (1992) Operations Research Letters , vol.11 , Issue.5 , pp. 309-315
    • Chen, M.S.1
  • 3
    • 4544229131 scopus 로고    scopus 로고
    • System optimization considering component reliability estimation uncertainty: Multi-criteria approach
    • D.W. Coit, T. Jin, and N. Wattanapongsakorn System optimization considering component reliability estimation uncertainty: multi-criteria approach IEEE Transactions on Reliability 53 3 2004 369 380
    • (2004) IEEE Transactions on Reliability , vol.53 , Issue.3 , pp. 369-380
    • Coit, D.W.1    Jin, T.2    Wattanapongsakorn, N.3
  • 4
    • 0031099915 scopus 로고    scopus 로고
    • Models for multi-echelon repairable item inventory systems with limited repair capacity
    • PII S0377221796002792
    • A. Diaz, and M. Fu Models for multi-echelon repairable item inventory systems with limited repair capacity European Journal of Operational Research 97 3 1997 480 492 (Pubitemid 127418512)
    • (1997) European Journal of Operational Research , vol.97 , Issue.3 , pp. 480-492
    • Diaz, A.1    Fu, M.C.2
  • 5
    • 0032063950 scopus 로고    scopus 로고
    • Profit pools: A fresh look at strategy
    • O. Gadiesh, and J.L. Gilbert Profit pools: a fresh look at strategy Harvard Business Review 76 3 1998 139 147
    • (1998) Harvard Business Review , vol.76 , Issue.3 , pp. 139-147
    • Gadiesh, O.1    Gilbert, J.L.2
  • 7
    • 0022146583 scopus 로고
    • A multi-echelon inventory model for a repairable item with one-to-one replenishment
    • S. Graves A multi-echelon inventory model for a repairable item with one-to-one replenishment Management Science 31 10 1985 1247 1256 (Pubitemid 15603989)
    • (1985) Management Science , vol.31 , Issue.10 , pp. 1247-1256
    • Graves Stephen, C.1
  • 8
    • 61349134153 scopus 로고    scopus 로고
    • Strategic inventory placement in supply chains: Nonstationary demand
    • S.C. Graves, and S.P. Willems Strategic inventory placement in supply chains: nonstationary demand Manufacturing & Service Operations Management 10 2 2008 278 287
    • (2008) Manufacturing & Service Operations Management , vol.10 , Issue.2 , pp. 278-287
    • Graves, S.C.1    Willems, S.P.2
  • 9
    • 0022208326 scopus 로고
    • Branch and bound experiments in convex nonlinear integer programming
    • O.K. Gupta, and A. Ravindran Branch and bound experiments in convex nonlinear integer programming Management Science 31 12 1985 1533 1546 (Pubitemid 16488951)
    • (1985) Management Science , vol.31 , Issue.12 , pp. 1533-1546
    • Gupta Omprakash, K.1    Ravindran, A.2
  • 12
    • 83955164680 scopus 로고    scopus 로고
    • Weibull and gamma renewal approximation using generalized exponential functions
    • T. Jin, and L. Gonigunta Weibull and gamma renewal approximation using generalized exponential functions Communication in Statistics-B: Simulation and Computation 38 1 2009 154 171
    • (2009) Communication in Statistics-B: Simulation and Computation , vol.38 , Issue.1 , pp. 154-171
    • Jin, T.1    Gonigunta, L.2
  • 13
    • 59049099709 scopus 로고    scopus 로고
    • Spare parts inventory control considering stochastic growth of an installed base
    • T. Jin, and H. Liao Spare parts inventory control considering stochastic growth of an installed base Computers & Industrial Engineering 56 1 2009 452 460
    • (2009) Computers & Industrial Engineering , vol.56 , Issue.1 , pp. 452-460
    • Jin, T.1    Liao, H.2
  • 15
    • 38549086460 scopus 로고    scopus 로고
    • Performance contracting in after-sales service supply chains
    • DOI 10.1287/mnsc.1070.0741
    • S.H. Kim, M.A. Cohen, and S. Netessine Performance contracting in after-sales service supply chains Management Science 53 12 2007 1843 1858 (Pubitemid 351159559)
    • (2007) Management Science , vol.53 , Issue.12 , pp. 1843-1858
    • Kim, S.-H.1    Cohen, M.A.2    Netessine, S.3
  • 16
    • 83955164679 scopus 로고    scopus 로고
    • Logistics Transformation
    • International Society of Logistics
    • Kratz, L.; 2005. Logistics Transformation. In: Mid-Atlantic Logistics Conference. International Society of Logistics.
    • (2005) Mid-Atlantic Logistics Conference
    • Kratz, L.1
  • 18
    • 9444289306 scopus 로고    scopus 로고
    • Multi-objective spare parts allocation by means of genetic algorithms and Monte Carlo simulations
    • M. Marseguerra, E. Zio, and L. Podofillini Multi-objective spare parts allocation by means of genetic algorithms and Monte Carlo simulations Reliability Engineering and System Safety 87 3 2005 325 335
    • (2005) Reliability Engineering and System Safety , vol.87 , Issue.3 , pp. 325-335
    • Marseguerra, M.1    Zio, E.2    Podofillini, L.3
  • 22
    • 40249098895 scopus 로고    scopus 로고
    • Spares provisioning under performance-based logistics contract: Profit-centric approach
    • DOI 10.1057/palgrave.jors.2602327, PII 2602327
    • D. Nowicki, U.D. Kumar, H.J. Steudel, and D. Verma Spares provisioning under performance-based logistics contract: profit-centric approach The Journal of the Operational Research Society 59 3 2008 342 352 (Pubitemid 351334697)
    • (2008) Journal of the Operational Research Society , vol.59 , Issue.3 , pp. 342-352
    • Nowicki, D.1    Kumar, U.D.2    Steudel, H.J.3    Verma, D.4
  • 23
  • 25
    • 84923391783 scopus 로고    scopus 로고
    • Evolving a theory of performance based logistics using insights from service dominant logic
    • W.S. Randall, T.L. Pohlen, and J.B. Hanna Evolving a theory of performance based logistics using insights from service dominant logic Journal of Business Logistics 31 2 2010 35 62
    • (2010) Journal of Business Logistics , vol.31 , Issue.2 , pp. 35-62
    • Randall, W.S.1    Pohlen, T.L.2    Hanna, J.B.3
  • 26
    • 69249219084 scopus 로고    scopus 로고
    • A production-inventory model in an imperfect production process
    • S.S. Sana A production-inventory model in an imperfect production process European Journal of Operational Research 200 2 2010 451 464
    • (2010) European Journal of Operational Research , vol.200 , Issue.2 , pp. 451-464
    • Sana, S.S.1
  • 28
    • 0000946660 scopus 로고
    • METRIC: A multi-echelon technique for recoverable item control
    • C.C. Sherbrooke METRIC: a multi-echelon technique for recoverable item control Operations Research 16 1 1968 122 141
    • (1968) Operations Research , vol.16 , Issue.1 , pp. 122-141
    • Sherbrooke, C.C.1
  • 29
    • 84989738069 scopus 로고
    • Multiechelon inventory systems with lateral supply
    • C.C. Sherbrooke Multiechelon inventory systems with lateral supply Naval Research Logistics 39 1 1992 29 40
    • (1992) Naval Research Logistics , vol.39 , Issue.1 , pp. 29-40
    • Sherbrooke, C.C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.