-
1
-
-
0012695109
-
Head-driven analysis of water distribution systems
-
B. Ulanicki, ed., Research Studies, Leicester, UK.
-
Ackley J.R. L. Tanyimboh T.T. Tahar B. Templeman A.B. Head-driven analysis of water distribution systems. Proc. of Computer and Control in Water Industry, Water Software Systems: Theory and Applications 2001, 183-192. B. Ulanicki, Research Studies, Leicester, UK.
-
(2001)
Proc. of Computer and Control in Water Industry, Water Software Systems: Theory and Applications
, pp. 183-192
-
-
Ackley, J.R.L.1
Tanyimboh, T.T.2
Tahar, B.3
Templeman, A.B.4
-
2
-
-
33645827157
-
Solution for water distribution systems under pressure-deficient conditions
-
JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(2006)132:3(175)
-
Ang W.K. Jowitt P.W. Solution for water distribution systems under pressure-deficient conditions. J. Water Resour. Plann. Manage. 2006, 132(3):175-182. JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(2006)132:3(175)
-
(2006)
J. Water Resour. Plann. Manage.
, vol.132
, Issue.3
, pp. 175-182
-
-
Ang, W.K.1
Jowitt, P.W.2
-
3
-
-
77955616587
-
Accounting for uniformly distributed pipe demand in WDN analysis: Enhanced GGA
-
UWJRAU, 1573-062X, 10.1080/1573062X.2010.491550
-
Berardi L. Giustolisi O. Todini E. Accounting for uniformly distributed pipe demand in WDN analysis: Enhanced GGA. Urban Water J. 2010, 7(4):243-255. UWJRAU, 1573-062X, 10.1080/1573062X.2010.491550
-
(2010)
Urban Water J.
, vol.7
, Issue.4
, pp. 243-255
-
-
Berardi, L.1
Giustolisi, O.2
Todini, E.3
-
4
-
-
0019595909
-
Node flow analysis of water distribution systems
-
JTPEDI, 0733-947X
-
Bhave P.R. Node flow analysis of water distribution systems. J. Transp. Eng. 1981, 107(4):457-467. JTPEDI, 0733-947X
-
(1981)
J. Transp. Eng.
, vol.107
, Issue.4
, pp. 457-467
-
-
Bhave, P.R.1
-
5
-
-
77957971214
-
Water network equilibrium, variational formulation and comparison of numerical algorithms
-
Wiley, New York.
-
Carpentier P. Cohen G. Hamam Y. Water network equilibrium, variational formulation and comparison of numerical algorithms. Computer application in water supply 1987, I. and Vol. Wiley, New York.
-
(1987)
Computer application in water supply
, vol.1
-
-
Carpentier, P.1
Cohen, G.2
Hamam, Y.3
-
6
-
-
0026131120
-
Realistic simulation of water distribution system
-
JTPEDI, 0733-947X, 10.1061/(ASCE)0733-947X(1991)117:2(258)
-
Chandapillai J. Realistic simulation of water distribution system. J. Transp. Eng. 1991, 117(2):258-263. JTPEDI, 0733-947X, 10.1061/(ASCE)0733-947X(1991)117:2(258)
-
(1991)
J. Transp. Eng.
, vol.117
, Issue.2
, pp. 258-263
-
-
Chandapillai, J.1
-
7
-
-
0039588616
-
Solving the pipe network analysis problem using optimization techniques
-
MSCIAM, 0025-1909, 10.1287/mnsc.24.7.747
-
Collins M. Cooper L. Helgason R. Kenningston J. LeBlanc L. Solving the pipe network analysis problem using optimization techniques. Manage. Sci. 1978, 24(7):747-760. MSCIAM, 0025-1909, 10.1287/mnsc.24.7.747
-
(1978)
Manage. Sci.
, vol.24
, Issue.7
, pp. 747-760
-
-
Collins, M.1
Cooper, L.2
Helgason, R.3
Kenningston, J.4
LeBlanc, L.5
-
8
-
-
0004021623
-
Analysis of flow in networks of conduits or conductors
-
Bulletin No. 286, Univ. of Illinois Engineering Experimental Station, Urbana, IL.
-
Cross H. Analysis of flow in networks of conduits or conductors. 1936, 1-29. Bulletin No. 286, Univ. of Illinois Engineering Experimental Station, Urbana, IL.
-
(1936)
, pp. 1-29
-
-
Cross, H.1
-
9
-
-
83755200577
-
Using stream processing to improve the speed of hydraulic network solvers
-
J. E. Van Zyl, A. A. Ilemobade, H. E. Jacobs ASCE, Reston, VA.
-
Crous P.A. Van Zyl J.E. Nel A. Using stream processing to improve the speed of hydraulic network solvers. Proc., 10th Water Distribution Systems Analysis Conf. 2008, 1-8. J. E. Van Zyl, A. A. Ilemobade, H. E. Jacobs, ASCE, Reston, VA.
-
(2008)
Proc., 10th Water Distribution Systems Analysis Conf.
, pp. 1-8
-
-
Crous, P.A.1
Van Zyl, J.E.2
Nel, A.3
-
10
-
-
0002093384
-
Efficient code for steady-state flows in networks
-
JYCEAJ, 0044-796X
-
Epp R. Fowler A.G. Efficient code for steady-state flows in networks. J. Hydraul. Div. 1970, 96(11):43-56. JYCEAJ, 0044-796X
-
(1970)
J. Hydraul. Div.
, vol.96
, Issue.11
, pp. 43-56
-
-
Epp, R.1
Fowler, A.G.2
-
11
-
-
27544443963
-
Benchmark problems for design and optimisation of water distribution systems
-
C. Maksimovic, D. Butler, F. A. Memon, A.A. Balkema, Leiden, Netherlands.
-
Farmani R. Savic D.A. Walters G.A. Benchmark problems for design and optimisation of water distribution systems. Proc., Advances in Water Supply Management 2000, 249-256. C. Maksimovic, D. Butler, F. A. Memon, A.A. Balkema, Leiden, Netherlands.
-
(2000)
Proc., Advances in Water Supply Management
, pp. 249-256
-
-
Farmani, R.1
Savic, D.A.2
Walters, G.A.3
-
12
-
-
0022117480
-
A technical note on the inclusion of pressure dependent demand and leakage terms in water supply network models
-
CESYEE, 0263-0257, 10.1080/02630258508970401
-
Germanopoulos G. technical note on the inclusion of pressure dependent demand and leakage terms in water supply network models. Civil Eng. Syst. 1985, 2(3):171-179. CESYEE, 0263-0257, 10.1080/02630258508970401
-
(1985)
Civil Eng. Syst.
, vol.2
, Issue.3
, pp. 171-179
-
-
Germanopoulos, G.1
-
13
-
-
77957946827
-
Considering actual pipe connections in WDN analysis
-
JHEND8, 0733-9429, 10.1061/(ASCE)HY.1943-7900.0000266
-
Giustolisi O. Considering actual pipe connections in WDN analysis. J. Hydraul. Eng. 2010, 136(11):889-900. JHEND8, 0733-9429, 10.1061/(ASCE)HY.1943-7900.0000266
-
(2010)
J. Hydraul. Eng.
, vol.136
, Issue.11
, pp. 889-900
-
-
Giustolisi, O.1
-
14
-
-
41049104883
-
An algorithm for automatic detection of topological changes in water distribution networks
-
JHEND8, 0733-9429, 10.1061/(ASCE)0733-9429(2008)134:4(435)
-
Giustolisi O. Kapelan Z. Savic D.A. An algorithm for automatic detection of topological changes in water distribution networks. J. Hydraul. Eng. 2008, 134(4):435-446. JHEND8, 0733-9429, 10.1061/(ASCE)0733-9429(2008)134:4(435), and (a)
-
(2008)
J. Hydraul. Eng.
, vol.134
, Issue.4
, pp. 435-446
-
-
Giustolisi, O.1
Kapelan, Z.2
Savic, D.A.3
-
15
-
-
54249127354
-
Extended period simulation analysis considering valve shutdowns
-
JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(2008)134:6(527)
-
Giustolisi O. Kapelan Z. Savic D.A. Extended period simulation analysis considering valve shutdowns. J. Water Resour. Plann. Manage. 2008, 134(6):527-537. JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(2008)134:6(527)
-
(2008)
J. Water Resour. Plann. Manage.
, vol.134
, Issue.6
, pp. 527-537
-
-
Giustolisi, O.1
Kapelan, Z.2
Savic, D.A.3
-
16
-
-
42449093808
-
Pressure-driven demand and leakage simulation for water distribution networks
-
JHEND8, 0733-9429, 10.1061/(ASCE)0733-9429(2008)134:5(626)
-
Giustolisi O. Savic D.A. Kapelan Z. Pressure-driven demand and leakage simulation for water distribution networks. J. Hydraul. Eng. 2008, 134(5):626-635. JHEND8, 0733-9429, 10.1061/(ASCE)0733-9429(2008)134:5(626)
-
(2008)
J. Hydraul. Eng.
, vol.134
, Issue.5
, pp. 626-635
-
-
Giustolisi, O.1
Savic, D.A.2
Kapelan, Z.3
-
17
-
-
68149163729
-
Pipe hydraulic resistance correction in WDN analysis
-
UWJRAU, 1573-062X, 10.1080/15730620802541623
-
Giustolisi O. Todini E. Pipe hydraulic resistance correction in WDN analysis. Urban Water J. 2009, 6(1):39-52. UWJRAU, 1573-062X, 10.1080/15730620802541623
-
(2009)
Urban Water J.
, vol.6
, Issue.1
, pp. 39-52
-
-
Giustolisi, O.1
Todini, E.2
-
18
-
-
0030151413
-
Comparison of methods for predicting deficient network performance
-
JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(1996)122:3(214)
-
Gupta R. Bhave P.R. Comparison of methods for predicting deficient network performance. J. Water Resour. Plann. Manage. 1996, 122(3):214-217. JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(1996)122:3(214)
-
(1996)
J. Water Resour. Plann. Manage.
, vol.122
, Issue.3
, pp. 214-217
-
-
Gupta, R.1
Bhave, P.R.2
-
19
-
-
0006666912
-
Hybrid method for the solution of piping networks
-
IEEPAD, 0018-9219
-
Hamam Y.M. Brammeller A. Hybrid method for the solution of piping networks. Proc. IEEE 1971, 118(11):1607-1612. IEEPAD, 0018-9219
-
(1971)
Proc. IEEE
, vol.118
, Issue.11
, pp. 1607-1612
-
-
Hamam, Y.M.1
Brammeller, A.2
-
20
-
-
0019044246
-
Linear theory method for pipe network analysis
-
JYCEAJ, 0044-796X
-
Isaacs L.T. Mills K.G. Linear theory method for pipe network analysis. J. Hydraul. Div. 1980, 106(7):1191-1201. JYCEAJ, 0044-796X
-
(1980)
J. Hydraul. Div.
, vol.106
, Issue.7
, pp. 1191-1201
-
-
Isaacs, L.T.1
Mills, K.G.2
-
21
-
-
0015299730
-
Graph-theoretic models for pipe network analysis
-
JYCEAJ, 0044-796X
-
Kesavan H.K. Chandrashekar M. Graph-theoretic models for pipe network analysis. J. Hydraul. Div. 1972, 98(2):345-364. JYCEAJ, 0044-796X
-
(1972)
J. Hydraul. Div.
, vol.98
, Issue.2
, pp. 345-364
-
-
Kesavan, H.K.1
Chandrashekar, M.2
-
22
-
-
0028410817
-
Accounting for losses: The bursts and background concept (BABE)
-
JIWMEZ, 0951-7359, 10.1111/j.1747-6593.1994.tb00913.x
-
Lambert A.O. Accounting for losses: The bursts and background concept (BABE). J. Inst. Water Environ. Manage. 1994, 8(2):205-214. JIWMEZ, 0951-7359, 10.1111/j.1747-6593.1994.tb00913.x
-
(1994)
J. Inst. Water Environ. Manage.
, vol.8
, Issue.2
, pp. 205-214
-
-
Lambert, A.O.1
-
23
-
-
0000043494
-
The application of Newton's method to network analysis by digital computers
-
JIWEA7, 0020-3556
-
Martin D.W. Peters G. The application of Newton's method to network analysis by digital computers. J. Inst. Water Eng. 1963, 17:115-129. JIWEA7, 0020-3556
-
(1963)
J. Inst. Water Eng.
, vol.17
, pp. 115-129
-
-
Martin, D.W.1
Peters, G.2
-
24
-
-
0018468345
-
A comparison of three methods for selecting values of input variables in the analysis of output from a computer code
-
TCMTA2, 0040-1706, 10.2307/1268522
-
McKay M.D. Conover W.J. Beckman R.J. comparison of three methods for selecting values of input variables in the analysis of output from computer code. Technometrics 1979, 21(2):239-245. TCMTA2, 0040-1706, 10.2307/1268522
-
(1979)
Technometrics
, vol.21
, Issue.2
, pp. 239-245
-
-
McKay, M.D.1
Conover, W.J.2
Beckman, R.J.3
-
26
-
-
1642514167
-
Modeling the behavior of a network-Hydraulic analysis and a sampling procedure for estimating the parameters
-
Ph.D. thesis, Univ. of Bordeaux I, Bordeaux, France.
-
Piller O. Modeling the behavior of network-Hydraulic analysis and sampling procedure for estimating the parameters. 1995, Ph.D. thesis, Univ. of Bordeaux I, Bordeaux, France.
-
(1995)
-
-
Piller, O.1
-
27
-
-
79953858815
-
A unified framework for pressure-driven network analysis
-
B. Ulaniki, Taylor & Francis, London.
-
Piller O. Van Zyl J.E. unified framework for pressure-driven network analysis. Proc. of Computer and Control in Water Industry, Water Management Challenges in Global Changes, Supplementary Proceedings, 2007, 25-30. B. Ulaniki, and eds., Taylor & Francis, London.
-
(2007)
Proc. of Computer and Control in Water Industry, Water Management Challenges in Global Changes, Supplementary Proceedings
, pp. 25-30
-
-
Piller, O.1
Van Zyl, J.E.2
-
28
-
-
84859912040
-
Pressure-driven analysis of network sections via high-lying nodes
-
J. Boxal, C. Maksimovic, Taylor & Francis, London.
-
Piller O. Van Zyl J.E. Pressure-driven analysis of network sections via high-lying nodes. Proc. of Computer and Control in Water Industry 2009, 257-262. J. Boxal, C. Maksimovic, Taylor & Francis, London.
-
(2009)
Proc. of Computer and Control in Water Industry
, pp. 257-262
-
-
Piller, O.1
Van Zyl, J.E.2
-
29
-
-
0024888854
-
Analysis of water distribution networks with head dependant outlets
-
CESYEE, 0263-0257, 10.1080/02630258908970550
-
Reddy L.S. Elango K. Analysis of water distribution networks with head dependant outlets. Civil Eng. Syst. 1989, 6(3):102-110. CESYEE, 0263-0257, 10.1080/02630258908970550
-
(1989)
Civil Eng. Syst.
, vol.6
, Issue.3
, pp. 102-110
-
-
Reddy, L.S.1
Elango, K.2
-
30
-
-
83755192771
-
-
Epanet2 users manual, U.S. EPA, Cincinnati.
-
Rossman L.A. 2000, Epanet2 users manual, U.S. EPA, Cincinnati.
-
(2000)
-
-
Rossman, L.A.1
-
31
-
-
0003085634
-
Water distribution network analysis
-
JYCEAJ, 0044-796X
-
Shamir U. Howard C.D. D. Water distribution network analysis. J. Hydraul. Div. 1968, 94(1):219-234. JYCEAJ, 0044-796X
-
(1968)
J. Hydraul. Div.
, vol.94
, Issue.1
, pp. 219-234
-
-
Shamir, U.1
Howard, C.D.D.2
-
32
-
-
0035395116
-
Appraisal of source head methods for calculating reliability of water distribution networks
-
JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(2001)127:4(206)
-
Tanyimboh T.T. Tabesh M. Burrows R. Appraisal of source head methods for calculating reliability of water distribution networks. J. Water Resour. Plann. Manage. 2001, 127(4):206-213. JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(2001)127:4(206)
-
(2001)
J. Water Resour. Plann. Manage.
, vol.127
, Issue.4
, pp. 206-213
-
-
Tanyimboh, T.T.1
Tabesh, M.2
Burrows, R.3
-
34
-
-
36448979388
-
A more realistic approach to the 'extended period simulation' of water distribution networks
-
C. Maksimovic, D. Butler, F. A. Memon, A.A. Balkema, Lisse, Netherlands.
-
Todini E. more realistic approach to the 'extended period simulation' of water distribution networks. Advances in water supply management 2003, 173-184. C. Maksimovic, D. Butler, F. A. Memon, and eds., A.A. Balkema, Lisse, Netherlands.
-
(2003)
Advances in water supply management
, pp. 173-184
-
-
Todini, E.1
-
35
-
-
0039810627
-
A gradient method for the solution of looped pipe networks
-
Wiley, New York.
-
Todini E. Pilati S. gradient method for the solution of looped pipe networks. Proc., Computer Applications in Water Supply 1988, 1:1-20. Wiley, New York.
-
(1988)
Proc., Computer Applications in Water Supply
, vol.1
, pp. 1-20
-
-
Todini, E.1
Pilati, S.2
-
36
-
-
0033102634
-
Leak analysis in pipeline systems by means of optimal valve regulation
-
JHEND8, 0733-9429, 10.1061/(ASCE)0733-9429(1999)125:3(277)
-
Tucciarelli T. Criminisi A. Termini D. Leak analysis in pipeline systems by means of optimal valve regulation. J. Hydraul. Eng. 1999, 125(3):277-285. JHEND8, 0733-9429, 10.1061/(ASCE)0733-9429(1999)125:3(277)
-
(1999)
J. Hydraul. Eng.
, vol.125
, Issue.3
, pp. 277-285
-
-
Tucciarelli, T.1
Criminisi, A.2
Termini, D.3
-
37
-
-
0024011630
-
Water distribution reliability: Simulation methods
-
JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(1988)114:3(276)
-
Wagner J.M. Shamir U. Marks D.H. Water distribution reliability: Simulation methods. J. Water Resour. Plann. Manage. 1988, 114(3):276-294. JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(1988)114:3(276)
-
(1988)
J. Water Resour. Plann. Manage.
, vol.114
, Issue.3
, pp. 276-294
-
-
Wagner, J.M.1
Shamir, U.2
Marks, D.H.3
-
38
-
-
83755215133
-
-
Windows 7. [Computer software]. Microsoft, Inc. Seattle.
-
Windows 7. [Computer software]. Microsoft, Inc. Seattle.
-
-
-
-
39
-
-
0015376062
-
Hydraulic network analysis using linear theory
-
JYCEAJ, 0044-796X
-
Wood D.J. Charles C.O. A. Hydraulic network analysis using linear theory. J. Hydraul. Div. 1972, 98(7):1157-1170. JYCEAJ, 0044-796X
-
(1972)
J. Hydraul. Div.
, vol.98
, Issue.7
, pp. 1157-1170
-
-
Wood, D.J.1
Charles, C.O.A.2
-
40
-
-
0019632265
-
Reliability of algorithms for pipe network analysis
-
JYCEAJ, 0044-796X
-
Wood D.J. Rayes A.G. Reliability of algorithms for pipe network analysis. J. Hydraul. Div. 1981, 107(10):1145-1161. JYCEAJ, 0044-796X
-
(1981)
J. Hydraul. Div.
, vol.107
, Issue.10
, pp. 1145-1161
-
-
Wood, D.J.1
Rayes, A.G.2
-
41
-
-
40549141156
-
Efficient pressure dependent demand model for large water distribution system analysis
-
(CD-ROM), ASCE, Reston, VA.
-
Wu Z.Y. Wang R.H. Walski T.M. Yang S.Y. Bowdler D. Baggett C.C. Efficient pressure dependent demand model for large water distribution system analysis. Proc., Eighth Water Distribution System Analysis Symp. 2006, and (CD-ROM), ASCE, Reston, VA.
-
(2006)
Proc., Eighth Water Distribution System Analysis Symp.
-
-
Wu, Z.Y.1
Wang, R.H.2
Walski, T.M.3
Yang, S.Y.4
Bowdler, D.5
Baggett, C.C.6
-
42
-
-
57949113352
-
Extended global-gradient algorithm for pressure-dependent water distribution analysis
-
JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(2009)135:1(13)
-
Wu Z.Y. Wang R.H. Walski T.M. Yang S.Y. Bowdler D. Baggett C.C. Extended global-gradient algorithm for pressure-dependent water distribution analysis. J. Water Resour. Plann. Manage. 2009, 135(1):13-22. JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(2009)135:1(13)
-
(2009)
J. Water Resour. Plann. Manage.
, vol.135
, Issue.1
, pp. 13-22
-
-
Wu, Z.Y.1
Wang, R.H.2
Walski, T.M.3
Yang, S.Y.4
Bowdler, D.5
Baggett, C.C.6
|