-
1
-
-
78649582555
-
-
[Online]. Available: 2010
-
European Wind Energy Association (EWEA). (2010). Wind in power, 2009 European statistics. [Online]. Available: http://www.ewea.org, 2010
-
(2010)
Wind in Power, 2009 European Statistics
-
-
-
2
-
-
34047154427
-
The costs of wind's intermittency in Germany: Application of a stochastic electricity market model
-
DOI 10.1002/etep.125
-
D.J. Swider and C. Weber, "The costs of wind's intermittency in Germany: application of a stochastic electricity market model,"European Transactions on Electrical Power, vol. 17, pp. 151-172, 2007. (Pubitemid 46525668)
-
(2007)
European Transactions on Electrical Power
, vol.17
, Issue.2
, pp. 151-172
-
-
Swider, D.J.1
Weber, C.2
-
3
-
-
18944371663
-
A new approach to quantify reserve demand in systems with significant installed wind capacity
-
DOI 10.1109/TPWRS.2005.846206
-
R. Doherty, and M. O'Malley, "A new approach to quantify reserve demand in systems with significant installed wind capacity," IEEE Transactions on Power Systems, vol. 20, pp. 587-595, 2005. (Pubitemid 40699684)
-
(2005)
IEEE Transactions on Power Systems
, vol.20
, Issue.2
, pp. 587-595
-
-
Doherty, R.1
O'Malley, M.2
-
4
-
-
0029252684
-
The generalized unit commitment problem
-
R. Baldick, "The generalized unit commitment problem," IEEE Transactions on Power Systems, vol. 10, pp. 465-475, 1995.
-
(1995)
IEEE Transactions on Power Systems
, vol.10
, pp. 465-475
-
-
Baldick, R.1
-
5
-
-
1342302528
-
Review on methods of generation scheduling in electric power systems
-
H.Y. Yamin, "Review on methods of generation scheduling in electric power systems," Electric Power Systems Research, vol. 69, pp. 227-248, 2004.
-
(2004)
Electric Power Systems Research
, vol.69
, pp. 227-248
-
-
Yamin, H.Y.1
-
6
-
-
6944239872
-
Long-term costs of electricity generation in Germany: Optimising the inclusion of wind power
-
28: 465-478
-
M. Krämer, "Long-term costs of electricity generation in Germany: Optimising the inclusion of wind power," Wind Engineering, vol. 28, pp. 465-478, 2004.; 28: 465-478
-
(2004)
Wind Engineering
, vol.28
, pp. 465-478
-
-
Krämer, M.1
-
7
-
-
3342913034
-
The value of wind energy as a function of wind capacity
-
DOI 10.1016/j.tej.2004.04.010, PII S1040619004000624
-
E. Hirst and J. Hild, "The value of wind energy as a function of wind capacity," The Electricity Journal, vol. 17, pp. 11-20, 2004. (Pubitemid 38989974)
-
(2004)
Electricity Journal
, vol.17
, Issue.6
, pp. 11-20
-
-
Hirst, E.1
Hild, J.2
-
8
-
-
14644431735
-
Large-scale integration of wind power into different energy systems
-
H. Lund, "Large-scale integration of wind power into different energy systems," Energy, vol. 20, pp. 2402-2412, 2005.
-
(2005)
Energy
, vol.20
, pp. 2402-2412
-
-
Lund, H.1
-
9
-
-
27744541799
-
The economics of large-scale wind power in a carbon constrained world
-
DOI 10.1016/j.enpol.2004.06.007, PII S0301421504001740
-
J.F. DeCarolis and D.W. Keith, "The economics of large-scale wind power in a carbon constrained world," Energy Policy, vol. 34, pp. 395-410, 2006. (Pubitemid 41600330)
-
(2006)
Energy Policy
, vol.34
, Issue.4
, pp. 395-410
-
-
DeCarolis, J.F.1
Keith, D.W.2
-
10
-
-
34248596049
-
Quantifying the total bet benefits of grid integrated wind
-
DOI 10.1109/TPWRS.2007.894864
-
E. Denny and M. O'Malley, "Quantifying the total net benefits of grid integrated wind," IEEE Transactions on Power Systems, vol. 22, pp. 605-615, 2007. (Pubitemid 46746222)
-
(2007)
IEEE Transactions on Power Systems
, vol.22
, Issue.2
, pp. 605-615
-
-
Denny, E.1
O'Malley, M.2
-
11
-
-
33947655421
-
Impacts of wind power on thermal generation unit commitment and dispatch
-
DOI 10.1109/TEC.2006.889616, Special Issue on Wind Power
-
B. Ummels, M. Gibescu, E. Pelgrum, W. Kling and A. Brand, "Impacts of wind power on thermal generation unit commitment and dispatch,"IEEE Trans. Energy Conversion, vol. 22, pp. 44-51, 2008. (Pubitemid 46487475)
-
(2007)
IEEE Transactions on Energy Conversion
, vol.22
, Issue.1
, pp. 44-51
-
-
Ummels, B.C.1
Gibescu, M.2
Pelgrum, E.3
Kling, W.L.4
Brand, A.J.5
-
14
-
-
82855164502
-
Stochastic optimization model to study the operational impacts of high wind penetrations in Ireland
-
epublished
-
P. Meibom, R. Barth, B. Hasche, H. Brand, C. Weber and M. O'Malley, "Stochastic optimization model to study the operational impacts of high wind penetrations in Ireland," IEEE Transactions on Power Systems, vol. 25, epublished, 2010.
-
(2010)
IEEE Transactions on Power Systems
, vol.25
-
-
Meibom, P.1
Barth, R.2
Hasche, B.3
Brand, H.4
Weber, C.5
O'Malley, M.6
-
15
-
-
67349225799
-
Unit Commitment for Systems with Significant Wind Penetration
-
A. Tuohy, P. Meibom, E. Denny and M. O'Malley, "Unit Commitment for Systems with Significant Wind Penetration", IEEE Transactions on Power Systems, vol. 24, pp. 592-601, 2009.
-
(2009)
IEEE Transactions on Power Systems
, vol.24
, pp. 592-601
-
-
Tuohy, A.1
Meibom, P.2
Denny, E.3
O'Malley, M.4
-
18
-
-
73149097752
-
-
Department of Enterprise, Trade and Investment
-
P. Meibom, R. Barth, H. Brand, B. Hasche, D. J. Swider, H. Ravn, and C. Weber, "All Island Grid Study workstream 2B-wind variability management studies," Department of Enterprise, Trade and Investment, 2008.
-
(2008)
All Island Grid Study Workstream 2B-wind Variability Management Studies
-
-
Meibom, P.1
Barth, R.2
Brand, H.3
Hasche, B.4
Swider, D.J.5
Ravn, H.6
Weber, C.7
-
20
-
-
33751071102
-
Scenario reduction in stochastic programming-an approach using probability metrics
-
J. Dupacova, N. Gröwe-Kuska, and W. Römisch, "Scenario reduction in stochastic programming-an approach using probability metrics", Math. Program., Ser. A 95, vol. 3, pp. 493-511, 2003.
-
(2003)
Math. Program., Ser. A 95
, vol.3
, pp. 493-511
-
-
Dupacova, J.1
Gröwe-Kuska, N.2
Römisch, W.3
-
23
-
-
0035506624
-
Monte Carlo computation of power generation production costs under operating constraints
-
DOI 10.1109/59.962412, PII S0885895001094263
-
J. Valenzuela and M. Mazumdar, "Monte-Carlo computation of power generation production costs under operating constraints," IEEE Transactions on Power Systems, vol. 16, pp. 671-677, 2001. (Pubitemid 33106113)
-
(2001)
IEEE Transactions on Power Systems
, vol.16
, Issue.4
, pp. 671-677
-
-
Valenzuela, J.1
Mazumdar, M.2
-
24
-
-
28244455847
-
An aggregate Weibull approach for modelling short-term system generating capacity
-
C. L. Anderson and M. Davidson, "An aggregate Weibull approach for modelling short-term system generating capacity," IEEE Transactions on Power Systems, vol. 20, pp. 1783-1789, 2005.
-
(2005)
IEEE Transactions on Power Systems
, vol.20
, pp. 1783-1789
-
-
Anderson, C.L.1
Davidson, M.2
-
26
-
-
77952430864
-
-
Enernex Corporation, Prepared for the [Online]. Available
-
Enernex Corporation, "Eastern Wind Integration and Transmission Study. Prepared for the National Renewable Energy Laboratory,"[Online]. Available: http://www.nrel.gov/wind/systemsintegration/
-
Eastern Wind Integration and Transmission Study
-
-
|