메뉴 건너뛰기




Volumn 39, Issue 7, 2012, Pages 1305-1314

A cooperative dispatching approach for minimizing mean tardiness in a dynamic flowshop

Author keywords

Dispatching rules; Flowshop; Heuristics; Mean tardiness; Scheduling

Indexed keywords

COMPARATIVE ANALYSIS; COMPUTATIONAL RESULTS; DECISION PROCEDURE; DISPATCHING RULES; FLOW-SHOPS; HEURISTICS; JOB-DISPATCHING; MEAN TARDINESS; MULTIPLE REGRESSION MODEL; ON CURRENTS; PERFORMANCE CRITERION; PRODUCTION CYCLE; RANDOM POINTS; REAL TIME SCHEDULING; TEST PROBLEM;

EID: 81555208220     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2011.07.004     Document Type: Article
Times cited : (27)

References (30)
  • 2
    • 0000474126 scopus 로고
    • Minimizing total tardiness on one machine is NP-hard
    • J. Du, and J.Y.T. Leung Minimizing total tardiness on one machine is NP-hard Mathematics of Operations Research 15 3 1990 483 495
    • (1990) Mathematics of Operations Research , vol.15 , Issue.3 , pp. 483-495
    • Du, J.1    Leung, J.Y.T.2
  • 4
    • 0027588823 scopus 로고
    • A new branch and bound algorithm for minimizing mean tardiness in two-machine flowshops
    • Y.-D. Kim A new branch and bound algorithm for minimizing mean tardiness in two-machine flowshops Computers and Operations Research 20 4 1993 391 401
    • (1993) Computers and Operations Research , vol.20 , Issue.4 , pp. 391-401
    • Kim, Y.-D.1
  • 6
    • 0027240799 scopus 로고
    • Heuristics for flowshop problems minimizing mean tardiness
    • Y.-D. Kim Heuristics for flowshop problems minimizing mean tardiness The Journal of the Operational Research Society 44 1 1993 19 28
    • (1993) The Journal of the Operational Research Society , vol.44 , Issue.1 , pp. 19-28
    • Kim, Y.-D.1
  • 7
    • 0009591953 scopus 로고
    • Minimum tardiness scheduling in flow shops: Construction and evaluation of alternative solution approaches
    • N. Raman Minimum tardiness scheduling in flow shops: construction and evaluation of alternative solution approaches Journal of Operations Management 85 1995 131 151
    • (1995) Journal of Operations Management , vol.85 , pp. 131-151
    • Raman, N.1
  • 8
    • 34548619478 scopus 로고    scopus 로고
    • Minimising total tardiness in the m-machine flowshop problem: A review and evaluation of heuristics and metaheuristics
    • DOI 10.1016/j.cor.2006.08.016, PII S0305054806002048
    • E. Vallada, R. Ruiz, and G. Minella Minimising total tardiness in the m-machine flowshop problem: a review and evaluation of heuristics and metaheuristics Computers and Operations Research 35 4 2008 1350 1373 (Pubitemid 47404775)
    • (2008) Computers and Operations Research , vol.35 , Issue.4 , pp. 1350-1373
    • Vallada, E.1    Ruiz, R.2    Minella, G.3
  • 9
    • 68249099005 scopus 로고    scopus 로고
    • A survey of dynamic scheduling in manufacturing systems
    • D. Ouelhadj, and S. Petrovic A survey of dynamic scheduling in manufacturing systems Journal of Scheduling 12 4 2009 417 431
    • (2009) Journal of Scheduling , vol.12 , Issue.4 , pp. 417-431
    • Ouelhadj, D.1    Petrovic, S.2
  • 12
    • 34249973653 scopus 로고
    • A survey of priority rule-based scheduling
    • R. Haupt A survey of priority rule-based scheduling OR Spektrum 11 1 1989 3 16
    • (1989) OR Spektrum , vol.11 , Issue.1 , pp. 3-16
    • Haupt, R.1
  • 13
    • 20744449455 scopus 로고    scopus 로고
    • An investigation on the performance of dispatching rules in FMS scheduling
    • A. Jain, P.K. Jain, and I.P. Singh An investigation on the performance of dispatching rules in FMS scheduling International Journal of Simulation Modelling 3 2-3 2004 49 60
    • (2004) International Journal of Simulation Modelling , vol.3 , Issue.23 , pp. 49-60
    • Jain, A.1    Jain, P.K.2    Singh, I.P.3
  • 14
    • 0022807123 scopus 로고
    • SLAM II simulation study of a simplified flow shop
    • R.T. Barrett, and S.A. Barman SLAM II simulation study of a simplified flow shop Simulation 47 1986 181 189
    • (1986) Simulation , vol.47 , pp. 181-189
    • Barrett, R.T.1    Barman, S.A.2
  • 16
    • 0002505896 scopus 로고
    • Performance of priority rules in a due date flow shop
    • J.L. Hunsucker, and J.R. Shah Performance of priority rules in a due date flow shop OMEGA 20 1 1992 73 89
    • (1992) OMEGA , vol.20 , Issue.1 , pp. 73-89
    • Hunsucker, J.L.1    Shah, J.R.2
  • 17
    • 0028766172 scopus 로고
    • Comparative performance analysis of priority rules in a constrained flow shop with multiple processors environment
    • J.L. Hunsucker, and J.R. Shah Comparative performance analysis of priority rules in a constrained flow shop with multiple processors environment European Journal of Operational Research 72 1 1994 102 114
    • (1994) European Journal of Operational Research , vol.72 , Issue.1 , pp. 102-114
    • Hunsucker, J.L.1    Shah, J.R.2
  • 18
    • 0030072218 scopus 로고    scopus 로고
    • Combinatorial evaluation of six dispatching rules in a dynamic two-machine flow shop
    • DOI 10.1016/0305-0483(95)00049-6
    • H. Sarper, and M.C. Henry Combinatorial evaluation of six dispatching rules in a dynamic two-machine flow shop Omega 24 1 1996 73 81 (Pubitemid 126159534)
    • (1996) Omega , vol.24 , Issue.1 , pp. 73-81
    • Sarper, H.1    Henry, M.C.2
  • 19
    • 0032649737 scopus 로고    scopus 로고
    • A comparative study of dispatching rules in dynamic flowshops and jobshops
    • C. Rajendran, and O. Holthaus A comparative study of dispatching rules in dynamic flowshops and jobshops European Journal of Operational Research 116 1 1999 156 170
    • (1999) European Journal of Operational Research , vol.116 , Issue.1 , pp. 156-170
    • Rajendran, C.1    Holthaus, O.2
  • 20
    • 33846357486 scopus 로고    scopus 로고
    • Dispatching in flowshops with bottleneck machines
    • DOI 10.1016/j.cie.2006.10.006, PII S0360835206001811
    • C. Rajendran, and K. Alicke Dispatching in flowshops with bottleneck machines Computers and Industrial Engineering 52 1 2007 89 106 (Pubitemid 46135846)
    • (2007) Computers and Industrial Engineering , vol.52 , Issue.1 , pp. 89-106
    • Rajendran, C.1    Alicke, K.2
  • 21
    • 33847619266 scopus 로고    scopus 로고
    • Impact of permutation enforcement when minimizing total weighted tardiness in dynamic flowshops with uncertain processing times
    • DOI 10.1016/j.cor.2005.11.014, PII S0305054805003618
    • R. Swaminathan, M.E. Pfund, J.W. Fowler, S.J. Mason, and A. Keha Impact of permutation enforcement when minimizing total weighted tardiness in dynamic flowshops with uncertain processing times Computers and Operations Research 34 10 2007 3055 3068 (Pubitemid 46356736)
    • (2007) Computers and Operations Research , vol.34 , Issue.10 , pp. 3055-3068
    • Swaminathan, R.1    Pfund, M.E.2    Fowler, J.W.3    Mason, S.J.4    Keha, A.5
  • 22
    • 2942637921 scopus 로고    scopus 로고
    • A new rule for minimizing the number of tardy jobs in dynamic flow shops
    • E. Lodree Jr., W. Jang, and C.M. Klein A new rule for minimizing the number of tardy jobs in dynamic flow shops European Journal of Operational Research 159 1 2004 258 263
    • (2004) European Journal of Operational Research , vol.159 , Issue.1 , pp. 258-263
    • Lodree, Jr.E.1    Jang, W.2    Klein, C.M.3
  • 23
    • 76549113337 scopus 로고    scopus 로고
    • Training a neural network to select dispatching rules in real time
    • W. Mouelhi-Chibani, and H. Pierreval Training a neural network to select dispatching rules in real time Computers and Industrial Engineering 58 2 2010 249 256
    • (2010) Computers and Industrial Engineering , vol.58 , Issue.2 , pp. 249-256
    • Mouelhi-Chibani, W.1    Pierreval, H.2
  • 26
    • 0019582153 scopus 로고
    • A comparison of due-date selection rules
    • K.R. Baker, and J.W.M. Bertrand A comparison of due-date selection rules AIIE Transactions 13 2 1981 123 131
    • (1981) AIIE Transactions , vol.13 , Issue.2 , pp. 123-131
    • Baker, K.R.1    Bertrand, J.W.M.2
  • 29
    • 0021521848 scopus 로고
    • Confidence intervals for steady-state simulations: I. A survey of fixed sample size procedures
    • A.M. Law, and W.D. Kelton Confidence intervals for steady-state simulations: I. A survey of fixed sample size procedures Operations Research 32 6 1984 1221 1239 (Pubitemid 15457476)
    • (1984) Operations Research , vol.32 , Issue.6 , pp. 1221-1239
    • Law Averill, M.1    Kelton W.David2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.